Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

MS Project

Software Consultant (StruMIS.Net), AceCad Software Ltd, Derby, UK, ERP / MIS Implemetation for Structural Steel Fabricator Companies around the world

START Date: 
September, 2007
END Date: 
December, 2008

• Implement StruMIS.Net system (a steel fabrication management software harnesses work processes through the steelwork contract between departments, suppliers and clients; from estimate tendering, through procurement and production into construction. Project Progress Monitoring and Reporting).
• Prepare software training and installation guides, software specifications and software testing.
• Provide training to AceCad internal and international offices staff.

Software Consultant (StruMIS.Net), AceCad Software (Australia) Pty Ltd., ERP / MIS Implemetation for Structural Steel Fabricators around the world

START Date: 
January, 2009
END Date: 
September, 2011

• Implement StruMIS.Net system (a steel fabrication management software harnesses work processes through the steelwork contract between departments, suppliers and clients; from estimate tendering, through procurement and production into construction. Project Progress Monitoring and Reporting).
• Prepare software training and installation guides, software specifications and software testing.
• Provide training to AceCad internal and international offices staff.

Planning Engineer, Aravind kumar Singh Construction KPO Project, KPO Project

START Date: 
June, 2014

§Worked as a site engineer, responsible for progress and re-solve site problems and interface Issue.

§Providing priority for the material to be Received and Erected on site.

§Responsible for Co-coordinating & Tracking with Fabrication shop for the Material to be received on site.

§Planning & Execution in Erection, Fit-up and welding progress.

§Cutting plan preparation for plates, angles, channels etc.

Production Assistant, SMS Demag Ltda., Steel Making Projects

START Date: 
February, 1994
END Date: 
December, 1999

Welding engineering improving the teamwork with related areas. Leadership of a steel manufacturing shop, managing 100 workers and restructuring them to the teamwork. Industrial planning and production assistance during 3 years, performing costs and investments analysis, improving the costs control and the interface among managers and controllers.

Experience Hours (Planning & Scheduling): 
6500
Experience Hours (Cost Management): 
9450

Planning Manager, Construtora Norberto Odebrecht Ltda., Venezuela, buildings construction, combustible plant, gas compression operation center and recollection systems., PP-PDH integrated petrochemical plant, Refinery, ship pier

START Date: 
July, 2008
END Date: 
August, 2014

Elaboration of proposals for EPC projects (2 years), planning management of earth works to extend a refinery (1.5 year) and of EPC contract to construction of gas compression plants (2.5 years). Change and delay management through contract amendments related to cost and schedule revisions.

Experience Hours (Planning & Scheduling): 
12500
Experience Hours (Cost Management): 
6200
Experience Hours (Forensic Analysis): 
5450

Sr. Planning Engineer, Notredame Metal Construction Co LLC, SHARJAH, UAE, Dubai, Emirates Flight Training and Organization Facilities at DWC

START Date: 
June, 2016
END Date: 
July, 2017
  • Prepare construction program of works related to Civil /Structural/ID /MEP / Firefighting & Fire alarm/ELV discipline wise detailed man-hours , cash flow, dashboards, s-curves using Primavera P6 & MS Project and ensure that the Project Plan reflects the project scope and is fully resourced and cost loaded in reference to the BOQ and Engineering drawings issued for site construction.
  • Prepare Revised Program for the remaining works and recovery program.
  • Check and Update program of works as required for the project through close out, integrating contractor and prog
Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Forensic Analysis): 
500

Planning Engineer, ECG Engineering Consultants Group S A, General Design Projects / Buildings / Oil & Gas

START Date: 
December, 2014
END Date: 
June, 2016
  • Planning and Reviewing construction program of works related to Civil /Structural/ID /MEP / Firefighting & Fire alarm/ELV discipline wise detailed man-hours, cash flow, dashboards, s-curves of the Contractor using Primavera P6 & MS Project and ensure that the Project Plan reflects the project scope and is fully resourced and cost loaded in reference to the BOQ and Engineering drawings issued for siteconstruction.
  • Develop and manage appropriate program of works related to design for Civil /Structural/ID/ MEP / Firefighting & Fire alarm / ELV using Primavera P6 a
Experience Hours (Planning & Scheduling): 
2500
Experience Hours (Forensic Analysis): 
500

Planning Engineer / Project Scheduler, Majutera Sdn. Bhd., Building & infrastructure

START Date: 
February, 2011
END Date: 
September, 2016

Develop baseline master work programme including physical and financial S-curve.

Support Project Manager in integrating subcontractors programmes into the master schedule.

Prepare manpower & machinery histogram.

Prepare and update work programme and cash flow curve showing actual progress.

Prepare weekly report and monthly report.

Prepare lookahead programme.

Prepare presentation materials on the status of project.

Attend site meeting.

Prepare and review EOT claims to client.

Experience Hours (Planning & Scheduling): 
10000
Experience Hours (Cost Management): 
2000
Experience Hours (Forensic Analysis): 
0

Zonal Engineer Civil, Prastavna Architects & Engineers, Jaipur, Planning, designing and execution of residential and commercial multi storey projects in Jaipur City

START Date: 
June, 1996
END Date: 
December, 1997

PRASTAVNA ARCHITECTS  AND  ENGINEERS                                                         JAIPUR , INDIA

Experience Hours (Planning & Scheduling): 
3100
Experience Hours (Cost Management): 
3300

Instructor (Civil Engineering, Vidya Bhawan Rural Polytechnic College, Udaipur, Expansion of VBRI, Udaipur

START Date: 
August, 1998
END Date: 
October, 1998

VIDYA BHAWAN RURAL POLYTECHNIC COLLEGE                                                             UDAIPUR , INDIA   &nbs

Experience Hours (Planning & Scheduling): 
250
Experience Hours (Cost Management): 
300

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content