Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

document control

Production Planning & Control Engineer, Grandspan Development Corporation, Coal-Fired Power Plant, Fly-over/Bridges, Metro Rail Stations, Commercial Buildings, Storage Tanks

START Date: 
December, 2003
END Date: 
April, 2005
• Understanding contractual obligations, project work scope, client requirements and specifications. • Creating WBS, BOM, estimating required resources and duration, and generating preliminary schedule and cost budget for approval. • Establishing schedule and cost baselines and performing work performance measurements throughout the project duration. • Preparing and distributing status reports (Gantt/milestone charts), performance reports and forecasts (S-curves). • Tracking and controlling shop drawing revisions and material availability and issuances. • Conducting routine shop walkthrou

PLANNING ENGINEER, Hyundai E&C, Barakah Nuclear Power Plant Project

START Date: 
November, 2010
  • Project Management, Project Control, Subcontract Management, Quantity Survey, Cost & Performance Control, Document Control

Project Control / Project Services Manager, Rolls-Royce Power Generations, Varied

START Date: 
July, 1998
END Date: 
November, 2002

Responsible for provision of Project Services in support of Project Management for Power Generation projects using Rolls-Royce Industrial Gas Turbines and Allens Diesel engines, including:

  • Management of up to twenty in number support staff in the functions of Project Planning, Document Control, Resource Management and Project Administration.
  • Manage and control the introduction of new working processes and procedures and the introduction of new IT systems for effective project controls.
  • Producing reports for issue to both Senior Management and external part

Project Controls Manager (PCM), Vanir CM, Multiple projects across multiple sectors

START Date: 
April, 2010

Project Controls Manager Southern Region.  Multi-disciplinary management and project controls support services.

Project Control Manager, Mott MacDonald, SPP11 FEED

START Date: 
November, 2010
END Date: 
August, 2011

November 2010 to August 2011

Project Control Manager, Mott Macdonald, Chengdu China

Managing all Planning and Document Control activities for the Basic Design of a USD$1 Bn Oil and Gas Facility, assisting the predominantly Chinese project team in all areas of Project Control.

Planner and Senior Planner, Murray & Roberts, Familiarisation with various divisions of the organisation

START Date: 
September, 1984
END Date: 
June, 1989

SENIOR PLANNER – PLANNER ENGINEER -Murray & Roberts, South Africa 

Various Construction projects and tenders

Project Control Manager, UAE, Habshan 3

START Date: 
September, 1994

Dedicated results driven Project Control Manager/Analyst with several years experience in business process development and life cycle management in Oil and Gas industries. Demonstrated success in project planning/controlling and project management with a commitment to completing projects on time and on budget. Strong communication, adaptability, leadership, customer focus, and decision making skills with ability to manage commitments, innovation and change. Expertise in developing and motivating others, and facilitating consensus based on decisions through economical thinking.

MANAGER - PLANNING, Danem Engineering Works WLL, OFFSHORE CIVIL PROJECTS, OIL & GAS ELECTRO-MECHANICAL & CIVIL MAINTENANCE PROJECTS, POWER PLANT DEMOLITION

START Date: 
February, 2011
      • Provide strong leadership to planning engineers, schedulers and cost engineers to plan, monitor, and control the execution of the project within the time and budgetary parameters, optimizing resource utilization.
      • Develop systems and procedures for Project control functions on the onset of the project and as and when there are additional requirements from the client in order to facilitate the process of monitoring progress.
      • Plan and schedule the project by developing a project master schedule in line with the proposal requirements through the application

Project Control Manager, Foster Wheeler International (Thailand), Petrochem Project

START Date: 
June, 2005
END Date: 
September, 2010

 

AUG 2009 TO AUG 2010      Foster Wheeler

                                           Project Control Manager

                                IRPC Propylene Plan

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content