Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

FIELD ENGINEER

Field Engineer, Office Engineer, Chief Field Engineer, PRoject Scheduler, Dravo Constructors, Inc., Iron Oxide Facilty, Decoking Facility, Steel Mill, Geothermal Power Plan, Waste-to -Engergy Power Plan

START Date: 
January, 1980
END Date: 
September, 1987

Field Engineer - Piping field engineer responsible to manage material flow through the warehouse

Office Engineer - supported chief field engineer on various dutues

Project Scheduler - developed, monitored and forecasted proejct schedules, developed monthly report

FIELD ENGINEER, TIC Canada, Epcor Clover Bar

START Date: 
March, 2007
END Date: 
March, 2008

 Project: EPCOR Clover bar Energy-GE LM6000 CTG –Unit I-Power station Installation and  

                                 Commissioning Project.

                                 Planner-Scheduler/Cost Control

Experience Hours (Planning & Scheduling): 
1000
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
350

FIELD ENGINEER, FAMECA, VEHICLE MANUFACTURING Heavy Trucking

START Date: 
October, 2008
END Date: 
November, 2011

 Duties:

·         Update weekly schedule (% complete and update forecast dates).

·         Integration of performance data for the development of "S" curve physical progress, Weekly reports and control pays for fabrications.

Experience Hours (Planning & Scheduling): 
6100
Experience Hours (Cost Management): 
3500
Experience Hours (Forensic Analysis): 
2000

FIELD ENGINEER, Jubaili Bros Engineering Ltd, Site Integrated Maintenance Scheme (SIMS)

START Date: 
July, 2011
END Date: 
January, 2012

 ·         Analyzed project needs, established project management strategy, and prepared detailed project report with quantity and cost estimation for material and labor costs as well as project timescales along with accurate completion dates.

·         Efficiently managed resource allocation process (manpower, equipment and materials), that achieved optimum resource availability throughout the project phase.

Experience Hours (Planning & Scheduling): 
600

FIELD ENGINEER, Monad Contractors Ltd., Pine Creek Gas Plant / Petromet Big Rock Rd Gas Plant, Kinross QR Gold, WE 1995 Looping Project

START Date: 
September, 1993
END Date: 
April, 1997

Field Engineer for industrial construction contractor. Roles included document control, cost control, scheduling, minor purchasing, assistance with safety program and quality control.

 

Projects included own forces concrete work for a sour gas plant, civil and mechanical installation of a modular sweet gas plant, process equipment installation for a gold mine, and looping project on a 42" natural gas pipeline. 

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
4900
Experience Hours (Forensic Analysis): 
500

FIELD ENGINEER, Miyung Construction Co., Jubail Sharq Petrochemical plant

START Date: 
March, 1983
END Date: 
May, 1985

Work Experience

Saudi Arabia (1983. ~ 1991.2)

  - Jubail Sharq Petrochemical Plant project

  - Yanbu Human Resources Development Instititute project

  - Dammam, King Fard International Airport project

 

Russian Federation

  - Marinovka Military Housing project

 

Thailand

  - Thai Lube Base Oil Plant project

Project Engineer, Field Engineer, Various companies - most are now out of business!, Power, T&D and Civil

START Date: 
September, 1992
END Date: 
January, 2008
  • Led the Engineering team for the construction execution of submarine cable, overhead transmission line, substation, building and underground cable projects;
  • Led the development of project controls processes and standards;
  • Led the development and update of project schedule, cost report, cash flow, progress billing, KPI report, progress report, daily report, resource planning, curve and histogram;
  • Led the development of labor, materials, equipment, cutting list and cost estimates and construction methodology and sequence;
  • Pre-approved the progress billings

FIELD ENGINEER, K, Dam Rehabilitation

START Date: 
June, 2008
END Date: 
October, 2010

Field engineering for drill and shoot, mass grading, drilling and grouting operations.

Experience Hours (Planning & Scheduling): 
0
Experience Hours (Cost Management): 
2000
Experience Hours (Forensic Analysis): 
0

Cost Analyst, Project Manager, Field Engineer, Cox's Electrical and Contracting, Nextel tower infrastructural equipment buildings

START Date: 
May, 1997
END Date: 
January, 1998

Cost Analyst, Project Manager, and Field Engineer. Duties included construction of Nextel tower infrastructural equipment buildings. Many buildings were elevated in swampy areas. Most areas were so remote that planning included all materials and hardware needed for complete and uninterrupted construction.

Construction included 8 feet high waler walls and free standing concrete stairs to access buildings 8 feet above the ground. On-the-run Cost Analyses.

Field Engineer, V.G Gatdula Construction Co., Residential villas

START Date: 
January, 1987
END Date: 
April, 1988

Workingunder the direct supervision of Project Engineer performing the following task:

  • Supervised detailed phases of works during construction, prepares progress report.
  • Assures quality during construction phase
  • Coordinates with Owner/consultants regarding change orders etc.
  • Field Draftsman responsible in preparing Drawing revisions, drafting Working Drawings

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content