FIELD ENGINEER

Field Engineer, TAV-TAISEI JV, New Doha International Airport (NDIA project)

START Date: 
September, 2006
END Date: 
August, 2007

Supervised civil/structural subcontractors at main terminal area. Prepared work methodologies and risk assessments for related civil works. Organized equipment for construction work and coordinated with client and subcontractors on project aspects. Developed mitigation plans and recommendations to resolve schedule problems. Prepared and reviewed portions of the monthly progress report.

FIELD ENGINEER, JAI HIND PROJECT LTD, PIPELINE CONSTRUCTION

START Date: 
March, 2002
END Date: 
August, 2006

·         JaiHind Projects Ltd. (From March’02 to August’06)

 

Construction Engineer:

 

1.      Vijaypur – Kota Gas Pipeline project (Client: GAIL and Consultant: Veco Canada 70 Km   X Ø18”, Ø16”, Ø8”).

2.      Kailaras – Malanpur Gas Pipeline project (Client: GAIL and Consultant: Mecon Ltd.72 Km X Ø12”, Ø6”, Ø4”)

FIELD ENGINEER, F.F. Cruz & Co., Inc (Philippines), 10KM. 3M Diameter Water Reservior

START Date: 
November, 1984
END Date: 
January, 1986

Assigned as one of the Field Engineers to supervise and monitor the construction of 10KM 3M Ø Water Reservoir laid in the heart of Manila. I was also tasked to assist in the preparation of As-built drawings, preparation of Daily Reports & Sub-contractor’s work accomplishment. 

Field Engineer, Masaood John Brown, Various

START Date: 
January, 2011

Based in Dubai, but travelling out to various worldwide locations to carry out the inspection, overhaul, and repair of industrial gas turbines. Main emphasis is on the range of turbines originally manufactured by GE. Sectors served are power and onshore and offshore oil & gas.

Main duties: planning and coordination of work, supervision of contractor personnel, inspection, assessment & reporting of turbine condition, liaison with client. 

Field Engineer, TAV Construction, Izmir Adnan Menderes International Airport and Multi Storey Car Park

START Date: 
August, 2005
END Date: 
September, 2006

Supervised civil and structural steel subcontractors. Attended pre- and postpour inspections as the contractor’s Quality Control (QC) Representative.