Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Claims

PLANNING MANAGER / Chief Planner, CHINA CONSTRUCTION AMERICA [CSCEC], The Baha Mar Development

START Date: 
August, 2010

CHIEF PLANNER. More than 22 years of construction work experience in Hong Kong, Macau, China, Philippines and Carribean. Had been involved in mostly large-scale infrastructure projects. Areas of focus include project-planning, scheduling & control, development of the comprehensive program/project management plan, earned value management and risk management. Extensive work experienced in Civil Engineering & Infrastructure Projects (i.e.

Company Director, Collins Project Deleivery, UK Civils Multiple

START Date: 
September, 1989

With over 25years experience in The Heavy Civils & Construction Industry. I have had the benefit of working on some of the very best projects both in the UK and overseas. Starting as a Site Engineer and progressively working up to Project Director I have gained extensive expierence of all aspects of Project Delivery at the highest level having worked on major Highway, Bridges, Rail and Water schemes.

Planning Manager, Al Naboodah Laing O'Rourke, Burj Dubai - Old Town Commercial Island, Dubai

START Date: 
June, 2002
END Date: 
August, 2006

During Tender Stage:

  • Establish programme strategies/method of construction
  • Prepare & analyze tender programme.
  • Estimate man power and plant & machinery requirements
  • Estimate formwork / scaffolding requirement
  • Participate in final settlement meetings to put together a competitive tender

During Construction Stage:

  • Manage a team of 5 Planning Engineers and 5 Performance Measuring Engineers
  • Produce a proje

Senior Planning Engineer (directly reporting to the project director), John Laing International, San Stefano grand plaza - Alexandria -Egypt -($350,000,000)

START Date: 
June, 2005
END Date: 
January, 2007

gross area of the project 30,000m2)

A total area of 440,000 m2 consisting of three parking floors, one 3-floor shopping mall, 3-floor administration area, six restaurants, ten cinemas, one 1500-persons capacity ballroom, 125 beds Four Seasons hotel, and 10 high-rise residential towers: (A) The West towers towards the sea, consisting of 26 floors including 400 furnished luxury apartments and (B) The East towers consisting of 30 floors with 500 apartments.

Lead planner / Planning Manager, Freelance, gas & steam), new built power plants (lignite

START Date: 
May, 2005
  • leading a team of 5 planners for a new built power plant project.
  • tasks: planning, project controlling, progress reporting, claims support
  • tools: Primavera, MS Project, Think Cell

Tender Programme Manager, Balfour Beatty, Various Rail related works in Malaysia

START Date: 
October, 2010

Balfour Beatty Rail Sdn. Bhd. Working both on live projects and tenders.

Planning Engineer, Parsons De Leuw Cather Overseas Ltd., Dubai Metro, Palm Jumeirah Gateway Bridge, Construction of Interchange 4.0.4.5.4.75,5.5.5 ,Emirates Road Widening, Sheikh Zayed Road Widening, Floating Bridge, Ras Al Khor Improvements, Business Bay

START Date: 
September, 2004
END Date: 
April, 2007

Preparing the Time Impact Analysis for Contractors,

Preparing Delay notifications,

Forensic Analysis using different methods like As Planned Impact Analysis, As Build Impact Analysis. Window Analysis

Preparing the Claim Programmes, Reviewing the Claim Programme.

Preparing Claim Documents i.e. Claim write ups organizing the claim in order of events.

Planning Manager, Alghanim International Co., The Avenues - Phase 3

START Date: 
January, 2005
END Date: 
June, 2006
Refer to Planning Manager/Senior Planning Engineer position in the Profile page.
Experience Hours (Planning & Scheduling): 
4000
Experience Hours (Cost Management): 
4000
Experience Hours (Forensic Analysis): 
4000

Senior Schedule Analyst, Management Counseling Corp, Various

START Date: 
November, 1974
END Date: 
December, 1989

Began draftiing CPM networks by hand, entering them onto data cards for running the various reports at an IBM mainframe computer facility. Graduated to developing my own schedules by turning the drawings, reading the specifications and making preliminary schedules for sub and genreral contract review. By the late 80's I was ready for a different schedule development model.

Experience Hours (Planning & Scheduling): 
17700
Experience Hours (Cost Management): 
4750
Experience Hours (Forensic Analysis): 
9000

Project Controls Co-ordinator, Palaris Mining, (various projects)

START Date: 
July, 2012

Experience Hours (Planning & Scheduling): 
20000
Experience Hours (Cost Management): 
5000
Experience Hours (Forensic Analysis): 
2000

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content