Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Resource Management

Volunteer, Calderdale Council, Calderdale Conservation Group

START Date: 
October, 2004
END Date: 
August, 2005
  • volunteer member of a local conservation team. Installing and maintaining the Rights-of-Way across Calderdale. Enlightening the well-established team with alternative methods of construction that were easier, quicker and safer than those used previously. 

PMO Executive, Al-Turki LLC, Muscat, Muscat, The Wave

START Date: 
January, 2010
END Date: 
December, 2011

PMO Executive- Pre-bid meetings, Tendering, Planning, scheduling, monitoring, cost controlling and resource management with Capcity planning etc.

Project Adviser for Construction Management and Planning, Private Contract, Roads and Infrastructure Works

START Date: 
June, 2008
END Date: 
October, 2008

 

I worked on as short term construction consultant, where I was supposed to supervise the project for its construction, quality and cost. The main contractor (M/s. Insland Construction pvt. Ltd) was a small company who could not afford an engineering team due to financial issues, therefore employed my services, to help them establish and perform the duties. My main responsibilities were as under:

Planning Engineer - Civil Engineer, DESCON Engineering Pvt. Ltd., Urea De-bottlenecking Project FERTIL

START Date: 
November, 2007
END Date: 
June, 2008

 

I was hired by this organization under the graduate hiring scheme. I was trained for the relevant company procedures and processes and then I

1.     Coordinate with discipline engineers in preparation of the detailed project plan, its activities aligning with the mechanical and electrical works team.

2.     Coordinating the detailed engineering design anddrawings for approved projects, material specifications, and detailed scope of work, technical specifications.

Project Control / Project Services Manager, Rolls-Royce Power Generations, Varied

START Date: 
July, 1998
END Date: 
November, 2002

Responsible for provision of Project Services in support of Project Management for Power Generation projects using Rolls-Royce Industrial Gas Turbines and Allens Diesel engines, including:

  • Management of up to twenty in number support staff in the functions of Project Planning, Document Control, Resource Management and Project Administration.
  • Manage and control the introduction of new working processes and procedures and the introduction of new IT systems for effective project controls.
  • Producing reports for issue to both Senior Management and external part

Project Engineer / Responsible Mechanical Engineer, Enexco Teknologies India Limited, PT Semen Andalas, Lafarge Group

START Date: 
March, 2006
END Date: 
December, 2006

 

·         Basic responsibilities includes erection, commissioning and troubleshooting of Company manufactured/ supplied machineries mainly for cement plant, like Wagon Loader, Rotopacker, Long Belt conveyors, Truck Loader, Equipments for silo extraction system like air slides, manual gates, Flow control gates etc.

·         Installed 2 nos. Wagon Loader inLAFARGE INDIA, JOJOBERA, JHARKHAND.

Junior Engineer Planning, Larsen & Toubro Limited, PPN Power project - Gas Boosting station

START Date: 
February, 2002
END Date: 
December, 2002

 

·     Project co-ordination with Engineering, Procurement & Execution

·     Establishing Project Cost Estimation (ACE).

·     Monthly Job cost report & Cost control measures.

·     Preparing resource requirement schedule.( Plant, Manpower, Staff, Bulk material, Infrastructure etc)

Assistant Technical Mananger, AGB Research PLC, not applicable

START Date: 
July, 1986
END Date: 
June, 1989

Assistant Technical Manager responsible for managing a team of engineers and technicians, procurement and arranging testing and approval from external authorities (BSI, British Gas etc.)  

Project Planner, Alstom Power, Multiple Projects in France, Nigeria and Greece

START Date: 
July, 2008
END Date: 
March, 2011

Engineering and procurement planning, site planning and reporting for GT Simple and Combined Cycle Power Plants
Resource Planning for Engineering and Projects in execution
Reporting with Business Objects/Crystal Reports

Project co-ordinator, Bombardier Transportation, Connex 376, Victoria line upgrade LUL

START Date: 
January, 2002
END Date: 
March, 2005

Project co-ordinator - working within the engineering department for the design and manufacturing of the Rail vehicle carbody. Duties include scheduling the workload, resource management, progress reporting, recovery programmes, communication of issues to project management. This role also involved some international travel to other sites.

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content