Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

P6

Project Controls Manager / Planner / Scheduler, Jacobs Engineering, URS Corp, Saylor Consulting, Airports, courthouses, jails, convention centers, hospitals, waste water plants, sewer systems, multi family

START Date: 
March, 1995

Over 30 years in commercial / institutional construction as a General Contractor, Construction Manager, Project Controls Manager, Superintendent and Certified Planner / Scheduler

Senior Planning & Schedule Engineer, PT. Punj Lloyd Indonesia, 2x30MW Coal Fired Power Plant, Tanjung, Tabalong – Kalimantan Selatan, Indonesia.

START Date: 
November, 2009
END Date: 
April, 2010
  1. Create, maintain and updating Master Schedule (using Primavera Version 5).
  2. Create Two Weeks Look Ahead Schedule in level 5.
  3. Review Sub-Contractor schedule and progress and ensure the progress of Sub-Contractor is correct.
  4. CPM analysis.
  5. Oversee any possible delay of work and prepare catch up plan.
  6. Studied the possibilities of delays in the work and proposed solutions to overcome these delays.
  7. Plan allocation of labor and equipment and compare with actual conditions in the site.
  8. Make a budget plan using Primavera P5

Operational Readiness, Oyu Tolgoi LLC, Oyu Tolgoi Copper Mine

START Date: 
December, 2010

Ops readiness planner, Oyu Tolgoi LLC

 

Brining together all of the various department plans and ensure they are on track to take over the operation of their respecitive areas post commissioning.

Major Projects Planner, Downer EDI, Hamilton Ring Road

START Date: 
January, 1996
END Date: 
January, 2011

Currently working as a Major Projects Planner for Downer EDI in New Zealand. Main focus at the moment is to develop planning into its own entity as part of the projects life cycle.

Planning Manager, ALSTOM Transport, Incheon Airport Railway Project

START Date: 
August, 2008
END Date: 
September, 2010

Incheon Airport Railroad Project, Korea

Developed Programme/Schedule:
Baseline Contract Schedule (Primavera P3)
Progress Monitoring Tools for Manufacturing & Delivery (Excel)
Progress Monitoring Tools for Installation (Excel)
Track Related Installation Programme (Excel)
Test and Commissioning Schedule (Primavera P3 & Excel)

Reporting:
Monthly Progress Report
Monthly Progress Presentation
Weekly Progress Report
Critical Path Analysis

Construction Analyst/Project Scheduler, CPMI, Various

START Date: 
December, 2008

Active Scheduling, Forensic Claims Analysis, Delay/Disruption Claims, Change Order Reivew

Senior Planner, Ross Planning Ltd, Various on contract

START Date: 
September, 2009

Director / Senior/Lead Planner 07798 576 308 at Ross Planning Ltd [ Edit ]
Civil Engineering industry
September 2009 – Present ( 6 months)

PROJECT PLANNING MANAGER, Voltas Limited, Residential,Commercial Buildings,Hotel & University projects

START Date: 
September, 2009

Normal 0 false false false EN-US

Senior Planner, Arup, Ingula Plant Storage Scheme

START Date: 
June, 2011

Current Role - Senior Planner - Mechanical planner constructing a hydro-electric power plant (Power plant construction)

Previous Role - Senior Planner - Civil Works (Mining, excavation and Concreting) Hydro-electric power station (Mining for Power plant construction)

Programme Manager, Balfour Beatty Utility Solutions, Beauly - Denny 400kV Overhead Line

START Date: 
August, 2009
END Date: 
December, 2011
Industry is overhead power transmission & distribution. Started as trainee site engineer in 1983 and worked up to Project Manager. Moved in to planning in 1995.

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content