Risk

Project Controls Specialist, Fluor Daniel SA, Project Turbo

START Date: 
April, 2004
END Date: 
June, 2005

Employed as lead planner reporting to Project controls manager.
Overseeing of construction contracts for civil works, under ground services, structural steelwork, field fabricated tanks and the construction of a new cooling water tower.
Review and compilation of submitted Compensation events for Project managers assessments and Early warning matters as required by the NEC.
Progress monitoring, Issuing of Early warnings to Contractors and Employer.
Contractor interfacing and scheduling of early requirements.
Conversion of work package based schedule to a systems structured han

Planning Lead, Shell Petroleum Development Company of Nigeria, SODA/ DomGas Project

START Date: 
March, 2011
END Date: 
November, 2012

I have been engaged in planning for 21 years dealing with production through multi disciplinary projects, from inception through commissioning. My career has progressed from the shop floor (Boilermaker) to the current post of Planning Lead. Experience has been gained in production, power generation, process plant, petro-chemical, aluminium smelting, breweries, Copper mining, covering all disciplines. Currently I form part of the Owners team, based in Warri, Nigeria. Present project portfolio totals some US $5 Billion, ranging from Flow stations through to Central Processing Plants.

PLANNING ENGINEER, QGC, AMEC, PLUS THREE CONSULTANTS, TURNER & TOWNSEND, SANTOS, GLNG, QCLNG,

START Date: 
April, 1998

Project Planning for Client and Contractor from FEED thru EPC construction including EOT (forensic claim planning).

Started with Infrastructure and Building industry for a collective 5 years and 10 years in Oil & Gas /Petro-Chem industry.

Senior Planner System Wide, Database Administrator for P6.2.1, CrossRail Project, Crossrail

START Date: 
January, 2008

Jan 2008 – Present                   CROSSRAIL

System Wide Lead Planner & P6 Database Administrator

  • Manage the P6 Database, setup, security and systems
  • Assist Planning management in the development of Programme strategy within P6
  • Develop and rollout the Earned Value Analysis strategy
  • Report to high level management  meetings justifying

Project Controls Manager, Project Dynamics Limited, Heathrow Airport Terminal 5 Concourse C

START Date: 
August, 2010
END Date: 
June, 2011

Development and management of project controls systems for Carillion at Heathrow Airport Terminal 5 Concourse C

Project Controls Section Manager, BNFL, Various Nuclear Projwects

START Date: 
January, 2000
END Date: 
June, 2001

Employed by Project Services Group as the Project Control Section Manager responsible for a specific part of the BNFL Engineering business including Thorp, Magnox, MOX & Transport. Duties include overall responsibility of ensuring a team of 16 people provided the depth of cost engineering & planning services required by various project managers within BNFL.

Experience Hours (Planning & Scheduling): 
1200
Experience Hours (Cost Management): 
1200

Senior Planning Manager, EDF Energy Contracting, Various

START Date: 
October, 2008

Planning Manager on Power Upgrade Project for EDF

 

  • Bid Management of projects up to £10M in value
  • Planning management of successful tenders to value of £50M
  • Formal presentation of bids to client on behalf of EDF
  • Contract managing the production of detailed design and build programmes to go into the bid for design & build phase of the power upgrade of the London Underground Sub Surface Lines.

Planning Manager, AMEC, Sub Surface Lines Power Upgrade

START Date: 
March, 2008
END Date: 
October, 2008

Planning & Reporting Manager on Power Upgrade Project for Amec

 

  • Negotiated with client to create new SSL Scoping & Development programme to facilitate requirements of MPD, EV and period reporting.
  • Managed production of Design & Build programmes for client to use in ITT successfully recovering lost time in the delivery milestone.
  • Improved relationship between client & contractor.
  • Managed a team of ten planner

Lead Planning Engineer, Metronet Alliance, London Underground PPP

START Date: 
March, 2008
END Date: 
October, 2008

Lead Planner on Stations East Projects for Metronet Alliance

 

  • Reported programme status for stations in the East of London to the Senior Management team outlining key issues, maintaining a strict focus on delivery.
  • Managed a team of sixteen planners, meeting periodically to get an understanding of the key issues and mitigation measures taking place on the projects.
  • Working with QS fully cost loaded programmes to activity level to ensure accur

Senior Site Planner, Group Five Coastal, Khayelitsha Hospital, Cape Town

START Date: 
January, 2009
END Date: 
August, 2010

Worked as the senoir site planner at Khayelitsha Hospital. Was responsible for all planning functions, which included the contract program, short term programs, progress updates, progress reports, information control, all technical queries, formwork scheduling etc.