Planning & Scheduling Manager, Gulf Coast Shipyard Group, Vessel Construction and Reapir

START Date: 
September, 2015

Develop project plans, detailed work packages and corresponding schedules.  Responsible for maintaining and updating all labor reports for management

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
750
Experience Hours (Forensic Analysis): 
300

Planning Engineer, Ajman, Flowline Mechanical Engineering, UAE., Structural Projects

START Date: 
December, 2013
END Date: 
November, 2014
  • Prepare construction program of works related to Civil /Structural/ID /MEP / Firefighting & Fire alarm/ELV discipline wise detailed man-hours , cash flow, dashboards, s-curves using Primavera P6 & MS Project and ensure that the Project Plan reflects the project scope and is fully resourced and cost loaded in reference to the BOQ and Engineering drawings issued for site construction.
  • Prepare Revised Program for the remaining works and recovery program.
  • Check and Update program of works as required for the project through close out, integrating contractor and prog
Experience Hours (Planning & Scheduling): 
2000

IT Project Coordinator, VMC Consulting, various IT projects

START Date: 
January, 2012
END Date: 
April, 2013

GIS Central Project Management Office (CPMO)

Joined the team having previous working experience and Masters level course work in Project planning and scheduling using Primavera (P6) and MS Project.

     

Main Achievements

·        Served as an integral part of GIS project management team by creating, maintaining and controlling multiple Project Plans using Primavera.

Experience Hours (Planning & Scheduling): 
150
Experience Hours (Cost Management): 
50

Project Planner, BVI Consulting Engineers, ALL Mining, Infrastructure, Railway, Roads Ens.

START Date: 
July, 2014
Scheduling & Planning of all Project Existing or Forthcoming . ◘ As well as creation of Internal Master Schedule including all Projects. Internal Program Development of Resource Tracking and Management Overview in Hours and Cost.◘ Maintaining Control of All projects. Reports and combined reports setup. Individual Program Hours/Work over time Reports and Combined Cost, Work, Resource efficiency over expected period Reports.◘ Set up of Tender Program/Documents required from planning.
Experience Hours (Planning & Scheduling): 
5950
Experience Hours (Cost Management): 
3950
Experience Hours (Forensic Analysis): 
3550

Consultant - Planning, L&T ECC, Hyderabad Metro Rail Project

START Date: 
July, 2011

·   Developed Master Schedule and subsequent approval to Working schedule of Level 4 for Uppal & Miyapur Depots along with Stations.

·   Established MIS reports for weekly, Monthly and Look Ahead programmes.

·   Monitor & control of daily progress reports for Depot & Stations.

Planning Manager, CBRE South Asia Pvt Ltd. Chennai, Aqualily Residential Development

START Date: 
October, 2011
END Date: 
June, 2015

CBRE SOUTH ASIA PVT LTD., (Project Management Group), CHENNAI. Manager Apr 2015 – Jun 2015 Deputy Manager Aug 2013 – Mar 2015 Assistant Manager Oct 2011 – Jul 2013 Project: Mahindra Aqualily Project (151 villas (G+1) + 22 Apartments (St+5), (B+G+7), (St+7/8) with complete Infrastructure Development) at Mahindra World City – (US$ 50M) for Mahindra Lifespace Developers Ltd. Responsibilities: • Working as Planning Manager, reporting to PMC Project Lead • Preparation of Project Master Schedule & Monitoring progress • Monitor project performance based on time cost and quality.

Experience Hours (Planning & Scheduling): 
7000
Experience Hours (Cost Management): 
7000
Experience Hours (Forensic Analysis): 
7000

Planning Engineer, CLC Gestion de Projet & Conseil, Various National & International Projects

START Date: 
January, 1995
END Date: 
July, 1998

- ALSTOM TRANSPORT : Set-up of a resource management system for the ATS department (Automatic control Transportation System) of the Signalling buisness.
- ETPM (Now ACERGY) : For EKPE revamping project (125 MUSD budget, full revamping of MOBIL EKPE installations),set-up of the marine operation planning, and follow-up offshore (9 month in Nigeria). Project was used to confirm work hours estimation methods.
- ALSTOM TRANSPORT : Bid Planning manger for Porto Metro project bid (PORTUGAL) and JFK (New-york) automatic subway.

Experience Hours (Planning & Scheduling): 
7000

Planning / Senior Planning / Project Engineer, Rolls-Royce Submarines, Various Nuclear Projects

START Date: 
October, 2003
END Date: 
May, 2012

Project Engineer for various Projects all Nuclear related with value up £12M

Experience Hours (Planning & Scheduling): 
18000
Experience Hours (Cost Management): 
18000
Experience Hours (Forensic Analysis): 
0

Project Engineer, TATA Teleservices , Telecom projects

START Date: 
August, 2001
END Date: 
October, 2004

TATA PROJECTS

Designation                          :  Project Engineer

Company                              :  TATA Teleservices Ltd, Bangalore, India,

Period                   &nbs

Sr.Project Engineer -Planning, MCML SYSTEMS, Indian Railway & Westing house design(uk)

START Date: 
November, 2004
END Date: 
January, 2008

 

Indian Railways & westing house Design projects

Designation                          :   Project Engineer -Planning

Company                              :   MCML Systems Pvt LTD, Bangalore, India          

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.