Manager - Planning and Control, AQUA DESIGNS INDIA PVT LTD, Chennai, Integrated Water Supply Scheme - Bihar - BUIDCO

START Date: 
February, 2016

1. Over all Project Planning and Control

2. Civil Contractor Finalisation and Schedule of completion discussion

3. Project Cost

4. Vendor/Contractor works expedition and Liasoning

5. Weightage Methodology and Physical Progress Calculation and Monitoring

6. Risk Logs

7. Critical path analysis and timely alarm to stake holders

8. Contractor Performance Monitoring'

9. Resource Planning

10. Progress Reports

11. Construction Coordination

Principal Engineer Planning, VA TECH WABAG LTD, 32MLD Greater Dambulla Water Supply Scheme

START Date: 
March, 2006
END Date: 
August, 2013

Worked in VA Tech Wabag Ltd, India and Sri Lanka

Following Were major key Result Area

1. Project Scheduling and Updation & Forecast

2. Planning Package Preparation and approvals

3. Progress Reporting

4. Critical Path Analysis

5. Site Coordination

6. Management Meetings

7. Resource Planning

8. Contract Review and Profilitability Reporting

9. Progress Report Dash boards

10. Time Extenstion

Tom Cimonetti

First Name: 
Tom
Last Name: 
Cimonetti

I am a Senior Scheduler/Project Manager with Alberici Constructors who is currently working on a large waste water treatment project in Toronto canada.

I create and maintain resource and cost loaded schedules in Oracle PPM.

I provide schedule training to our employees as needed.

Professional Since: 
Jun-1983 (42.3 yrs experience)
Years Experience: 
0

Site Engineer, CMC di Ravenna, Rehabilitation & Expansion of Nampula City Water Supply System

START Date: 
May, 2013
END Date: 
July, 2013
  • To solve the site issues and problems to insure smooth and boosted progress.
  • To make understanding with the foremen of different sites and to insure the work done is according to the specifications and drawings.
  • To deal the engineer’s inspections and to satisfy them with the works done.
  • To resolve the Engineer objections and to find solutions with them for the unforeseen problems.
  • To insure that the work done is according to the POW and within Budget.
  • To consult with the Chief Engineer for the Technical Issues and to find suitable solutions.

Cost Control, CMC di Ravenna, Rehabilitation & Expansion of Nampula City Water Supply

START Date: 
January, 2013
END Date: 
May, 2013
  • Preparing and analyzing the Monthly Manpower Analysis Report.
  • Preparing and updating the Equipment Program, Equipment Cost Analysis.
  • Preparation of the Daily, Weekly and Monthly Diesel Consumption Reports.
  • Analyzing the daily, weekly and monthly progress report relevant to Manpower and Cash flow.
  • Preparation of the Material Consumption Reports.
  • Analyzing and updating the Cash flow.
  • Ground workings for the updating budget.
  • Analyzing and preparing reports for the planned and actual costs of the project.

Quantity Surveyor, DESCON Engineering Ltd., Satpara Dam Project Skardu

START Date: 
July, 2010
END Date: 
July, 2012
  • Preparation of Contour Maps, Layout Plan, L-Sections, X-Sections etc from the survey data.
  • Preparation of Bar Bending Schedule and Reinforcement Drawings.
  • Calculation of Earth work quantities from drawings.
  • Calculation of Concrete quantities from drawings.
  • Preparation of Measurement Sheets and Monthly Statements.
  • Preparation of Interim Payment Statements (IPS) and its approval from Engineer.
  • Preparation of all kind of measurements and billing related to subcontractor’s sub-lets.
  • Visiting site frequently to get completed work statu

CAD Supervisor, DESCON Engineering Ltd., Satpara Dam Project Skardu

START Date: 
July, 2009
END Date: 
June, 2010
  • Preparation of Civil Shop Drawing for Earth Work and Concrete Structures.
  • Preparation of Contour Maps, Layout Plan, L-Sections, X-Sections etc from the survey data.
  • Preparation of Electrical/Instrumentation drawings.
  • Preparation of As-Built Drawings.
  • Plotting and scaling of drawings and sketches (to scale printing).
  • Calculation of Earth work quantities from drawings.
  • Calculation of Concrete quantities from drawings.
  • To complete the tasks and assignments given by the Section In charge and Project Manager in time and to furnish them

Senior Planner, CH2M Hill, Thames Tideway Tunnel

START Date: 
November, 2014
END Date: 
September, 2017
Project to build a large sewer across London, beneath the River Thames. Senior Planner for the Thames Water funded works (budget ≈£100m), successfully lead the restructuring of the planning department, and produced the strategic integrated schedule to aid interface management and manage risks through QSRA. Developed the project WBS, schedule reporting hierarchy and sitephasing plans, and was responsible for the forensic analysis of complex compensation events.
Experience Hours (Planning & Scheduling): 
6000
Experience Hours (Cost Management): 
2000
Experience Hours (Forensic Analysis): 
3000

Iftikhar Awan P.Eng.

First Name: 
Iftikhar
Last Name: 
Awan P.Eng.

Professional Engineer registered in the province of Alberta, Canada with Master Degree in Construction Management, Bachelor Degree in Civil Engineering and over 19 years of experience in team leadership, project planning & scheduling, project cost control, claims (EOT, Delay cost) and contract administration. Developed, maintained and analyzed schedules for large oil & gas and electric transmission infrastructure projects using critical path method (CPM). Supervised preparation of EOT and delay cost claims for a large hydropower project.

Professional Since: 
Jan-1995 (30.7 yrs experience)
Oldest experience: 
Jan 1995 (30.7 yrs experience)
Years Experience: 
23

Senior Planning Engineer, Salini Impregilo, Nenskra Hydropower Project in Georgia

START Date: 
January, 2016

Lead the planning, development and coordination of project schedule for EPC US$ 615 million, 280 MW hydroelectric project involving construction of an asphalt faced rockfill dam, 15 km long headrace tunnel, 15 km long transfer tunnel, penstock, surge tank and powerhouse.

Track delay issues, analyze data and provide weekly & monthly reports to key stakeholders and the client.

Prepare delay claims and support preparation of claims by creating delay fragnets.

Experience Hours (Planning & Scheduling): 
2200
Experience Hours (Forensic Analysis): 
600