Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

CMC di Ravenna

Project Planner, CMC di Ravenna, Itare Dam & Water Supply Project

START Date: 
March, 2018
END Date: 
May, 2019

Project Planner 

Tunnel and Pipeline 

Itare Dam. Molo, Kenya.

Experience Hours (Planning & Scheduling): 
500
Experience Hours (Cost Management): 
200
Experience Hours (Forensic Analysis): 
200

Project Planner / Forensic Planner, CMC di Ravenna, Itare Dam & Water Supply Project

START Date: 
June, 2017
  • To revise the POW for the changes & to schedule unforeseen works & activities.
  • To assist the Production Team in making strategies to attempt different activities so as to reduce both the time and cost.
  • To analyze and study the delays, time loses and additional works and to work out for the EOT claims.
  • Time Impact Analysis & Reports for EOT Claims.
  • To revise & update the cash flow.
  • To prepare the Internal WBS (Work Breakdown Structure) of different activities to insure better monitoring and boosted progress.
  • Early warning o

Project Planner / Forensic Planner, CMC di Ravenna, Cornubia Interchange to Meridian Drive, Durban

START Date: 
August, 2015
END Date: 
June, 2017
  • To revise the POW for the changes & to schedule unforeseen works & activities.
  • To assist the Production Team in making strategies to attempt different activities so as to reduce both the time and cost.
  • To analyze and study the delays, time loses and additional works and to work out for the EOT claims.
  • Time Impact Analysis & Reports for EOT Claims.
  • To revise & update the cash flow.
  • To prepare the Internal WBS (Work Breakdown Structure) of different activities to insure better monitoring and boosted progress.
  • Early warning o

Project Planner / Forensic Planner, CMC di Ravenna, Improvements to the MT. Edgecombe Interchange (Km 3.7)

START Date: 
August, 2013
END Date: 
June, 2017
  • To revise the POW for the changes & to schedule unforeseen works & activities.
  • To assist the Production Team in making strategies to attempt different activities so as to reduce both the time and  cost.
  • To analyze and study the delays, time loses and additional works and to work out for the EOT claims.
  • Time Impact Analysis & Reports for EOT Claims.
  • To revise & update the cash flow.
  • To prepare the Internal WBS (Work Breakdown Structure) of different activities to insure better monitoring and boosted progress.
  • Early war

Site Engineer, CMC di Ravenna, Rehabilitation & Expansion of Nampula City Water Supply System

START Date: 
May, 2013
END Date: 
July, 2013
  • To solve the site issues and problems to insure smooth and boosted progress.
  • To make understanding with the foremen of different sites and to insure the work done is according to the specifications and drawings.
  • To deal the engineer’s inspections and to satisfy them with the works done.
  • To resolve the Engineer objections and to find solutions with them for the unforeseen problems.
  • To insure that the work done is according to the POW and within Budget.
  • To consult with the Chief Engineer for the Technical Issues and to find suitable solutions.

Cost Control, CMC di Ravenna, Rehabilitation & Expansion of Nampula City Water Supply

START Date: 
January, 2013
END Date: 
May, 2013
  • Preparing and analyzing the Monthly Manpower Analysis Report.
  • Preparing and updating the Equipment Program, Equipment Cost Analysis.
  • Preparation of the Daily, Weekly and Monthly Diesel Consumption Reports.
  • Analyzing the daily, weekly and monthly progress report relevant to Manpower and Cash flow.
  • Preparation of the Material Consumption Reports.
  • Analyzing and updating the Cash flow.
  • Ground workings for the updating budget.
  • Analyzing and preparing reports for the planned and actual costs of the project.

Ejaz Ahmed Anjum

First Name: 
Ejaz Ahmed
Last Name: 
Anjum

I am a young professional destined to grow my career in the fields of Project Control, Forensic Planning, Claims and Disputes. I have a formal qualification in the field of Civil Engineering and currently pursuing a management degree as well. I have worked and been working on some of the very exciting projects around the globe including Dams, Hydro Power, Roads, Bridges, Incremental Launching Bridge construction, Pipeline, tunneling etc…

Professional Since: 
Jun-2007 (16.9 yrs experience)
Oldest experience: 
Jul 2009 (14.8 yrs experience, WARNING: 2.1 years variance with Professional Since)
Years Experience: 
8

Amit Pokhrel

First Name: 
Amit
Last Name: 
Pokhrel
An enthusiastic and motivated individual who has a clear understanding of the role and responsibilities associated with being a Civil Engineer and a Urban Designer. Having the ability to provide support for multiple concurrent priorities, i am able to establish, maintain and develop effective working relationships with service users, teams, delivery partners & colleagues. Possesses a broad range of technical, personal effectiveness and leadership skills and uses rigorous logic & methods to come up with effective solutions to difficult problems.
Professional Since: 
Aug-2011 (12.7 yrs experience)
Years Experience: 
0

Riaz Butt

First Name: 
Riaz
Last Name: 
Butt
Professional Since: 
Aug-1997 (26.7 yrs experience)
Oldest experience: 
Aug 1997 (26.7 yrs experience)
Years Experience: 
43

Senior Planner, CMC di Ravenna, All types of projects

START Date: 
August, 1997

Planning & Project Control, building work breakdown structure, resource loading, monitoring

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content