Water / Utilities

Lead Planner, ARCHIRODON CONSTRUCTION (OVERSEAS) CO. SA. QATAR, RLS EAG-QATAR METRO, EPIC RAS LAFFAN PORT EXPANSION PHASE -2, Phase 2A, Phase 4A & 5. EPIC DE-SALINATION PLANT HALUL, NEW SERVICE BERTHS RAS LAFFAN

START Date: 
September, 2009
  • Lead the planning team and anticipate requirements from various departments and prepare the team for objective delivery on time.
  • Preparation of Tender schedules, assist the tender team.
  • Preparation of Baseline from tender schedule and developing the same for next levels (WBS, Resourcing, cost loading).
  • Preparation of registers, fully capable of progress calculation; to monitor Engineering (design) documents, procurement activities, or any other deliverables as required.
  • Preparation of the planning & scheduling formats with respect to scope of work of

shayarkhan Varis

First Name: 
shayarkhan
Last Name: 
Varis

More than 14 years of overall experience, planning experience in EPIC projects including Marine Infrastructure, Electro-mechanical plants & facilities and construction projects including Metro Rail, Desalination plant, underwater intake pipe lines, Shipyards (piers, berths, revetments, etc.) Airports, road bridges, Residential & Commercial buildings.

·      Well versed in PRIMAVERA PROJECT PLANNER- P3 and P6 (V 8.4) EPPM- PROJECT MANAGEMENT.

Professional Since: 
Aug-2003 (22.0 yrs experience)
Oldest experience: 
Aug 2003 (22.0 yrs experience)
Years Experience: 
14

Wissam El Kaissi

First Name: 
Wissam
Last Name: 
El Kaissi

I speak French, English and Arabic fluently, basic Sspanish

Attended ISO 20001 courses and obtained ceritificate

Experience with CAPSIM

HR and Project Management specialiasation

Basic coding

Professional Since: 
Sep-2017 (7.9 yrs experience)
Oldest experience: 
Jul 2017 (8.1 yrs experience, WARNING: 0.2 years variance with Professional Since)
Years Experience: 
0

intern in logistics, CMA CGM, Logistic Process Automation & Various commercial

START Date: 
July, 2017

Internship in the transporation field and getting familiarized with all the aspects of the maritime transportation in each department of the company

Project Manager, Xyratex, Various IT / Software / ERP related Projects

START Date: 
May, 2005
END Date: 
June, 2006

Xyratex, Havant UK             

Project Manager - New Product Introduction 
Responsibilities
Introduced various data storage hardware devices and software to the manufacturing line. Managed Software Engineering Change requests on to manufacturing line. Supported transition and confirmation of compliance of hardware to RoHS (Restriction of Hazardous Substances) and WEEE (Waste Electrical and Electronic Equipment).

Experience Hours (Planning & Scheduling): 
1500
Experience Hours (Cost Management): 
0
Experience Hours (Forensic Analysis): 
0

Project Manager, McConnell Dowell SEA, Sulphur Project Handling Jetty

START Date: 
December, 2001

PROFESSIONAL EXPERIENCE

June 2015 – Current

McConnell Dowell South East Asia Pte Ltd

Bid & Project Manager

Aug 2012 – Dec 2014

Leighton Contractors Asia

Project Manager

PT Caterpillar Indonesia

Fabrication Facility and Marine Works

Value: USD 85 million

Alstom Power

Experience Hours (Planning & Scheduling): 
10000
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
500

Dharmender Chauhan

First Name: 
Dharmender
Last Name: 
Chauhan
Professional Since: 
Sep-1994 (30.9 yrs experience)
Years Experience: 
0

Project Controls/Planning Engineer, JEA, Water/Wastewater Capital Improvement Plan

START Date: 
May, 2010
END Date: 
May, 2016

Performed project controls tasks on a water/wastewater capital improvement plan that exceeded $100 million annually. Tasks included lifeycle project delivery support including fiscal year budget planning, risk and manpower analysis, project planning, cost analysis, cash flow forecasting, scheduling and reporting.

Experience Hours (Planning & Scheduling): 
6000
Experience Hours (Cost Management): 
6000

Project Controls Director, HDR Constructors, Inc, Project Controls Director

START Date: 
June, 2014
END Date: 
June, 2017

Project Controls Director - HDR Constructors, Inc.   Built a 3 person project controls group into a 16 person group recognzed in HDR as the largest single professional project controls group in the HDR.    Work included transforming project accounting systems from People Soft to Oracle's EBS, and instituting P6 scheduling as as standard on all HDR Constructor's projects

Experience Hours (Planning & Scheduling): 
3100
Experience Hours (Cost Management): 
3150
Experience Hours (Forensic Analysis): 
1000

Jeffery Lewis

First Name: 
Jeffery
Last Name: 
Lewis

Possess 8+ years’ experience with performing Technical Product Sales, Estimating, Project Management, and Procurements for Utility Infrastructure Materials. Experience with Managing Utility Construction Projects. Review plans, specifications, and research industry databases.

Professional Since: 
May-2009 (16.2 yrs experience)
Oldest experience: 
May 2009 (16.2 yrs experience)
Years Experience: 
2