The Wiki is a knowledge-base that can be contributed to or utilized by anyone with skills and / or interest in planning, scheduling or project controls.

No Wiki page or article is owned by its creator or any other editor, and its content relies upon collaboration and teamwork.  How can you contribute?

Every Wiki page may be improved upon and edited by a logged-in Planning Planet commnity member.  Disclaimer / Read more...

Glossary

" (2) | 0 (7) | 3 (2) | 4 (3) | 5 (2) | 6 (1) | 7 (3) | A (24) | B (42) | C (75) | D (29) | E (24) | F (33) | G (13) | H (13) | I (17) | J (1) | K (4) | L (11) | M (23) | N (5) | O (12) | P (50) | Q (1) | R (37) | S (65) | T (37) | U (1) | V (4) | W (22) | Z (2)

Latest Posts

  • 7 Ways to Overcome Remote Work Challenges Remote work has become the new norm these days. According to a research, more than one-third of remote workers telecommute for few hours every week in the US. The situation is not different in other... syedmohammad Anwer 20-Apr-17
  • Planning Software Hi all, how to avoid the import of rubbish information impacting Global Calendars, UDF, Codes within EPPM 15.2.13 Database.  Users without edit xml template permission can only select one... Elvira Kinzhebayeva 15-Feb-17
  • Selection of xml import template without having editing permission on it Hi all, how to avoid the import of rubbish information impacting Global Calendars, UDF, Codes within EPPM 15.2.13 Database.  Users without edit xml template permission can only select one... Elvira Kinzhebayeva 15-Feb-17
  • Selection of xml import template without having editing permission on it Hi all, how to avoid the import of rubbish information impacting Global Calendars, UDF, Codes within EPPM 15.2.13 Database.  Users without edit xml template permission can only select one... Elvira Kinzhebayeva 15-Feb-17
  • Building & Construction Building & Construction Production Rates & Build Times: Hi there,Sending Builing & Construction MEP production rates & Build Times to rizwanbtech@gmail.com in excel format would... rizwan 26-Apr-17
  • BIM Software BIM Software covers many aspects of the stages of BIM and can be used to demonstrate each stage as part of the BIM methodology. Software includes the following :Asta Powerproject BIM3D - Autodesk... Adrian Vann 16-Nov-16
  • Asta Powerproject Enterprise  Asta Powerproject is a project and resource management software solution for organisations that manage people working across multiple projects, programmes and project portfolios.The enterprise... Adrian Vann 16-Nov-16
  • Asta Powerproject  Asta Powerproject is proven robust and scaleable software, rated no.1 by the Planning Engineers Organisation for construction project management and planning.70% of successful UK construction... Adrian Vann 16-Nov-16
  • Critical Path DRAG Critical Path DRAG (Devaux's Removed Activity Gauge) is the amount of time that an activity on the critical path (i.e., the longest path through the project) is adding to the project’s duration or,... Richard Ormerod 16-Nov-16
  • Common Scheduling Mistakes What is Scheduling? Now-a-days, in construction industry, the parameters that define the success of a project are delivering the required facility, at the required standard (quality), within the... John McIntyre 07-Sep-16
  • Rates, Norms & Durations What is needed to come up with a production rate?A duration of time, the manhours involved, and an amount of work produced?This section is here to document this.  What information do you have... Amro Ahmed 13-Feb-17
  • Drainage, Manholes and Gulleys Manholes and GulleysTask / DescriptionSlow  Ave  Fast   Units Concrete Pre-Cast Manhole Units, 610 x 455 x 51 mm-  1.2 -   hrs/no ... Osama Mustafa 28-May-16
  • Excavate & Reduce Levels Excavate By Hand Trenches (m3/hr)      Depth in Metres->Ne 1.51.5-3.03.0-4.5    Sand/Soil lose0.660.450.33Sand/Soil firm0.570.380.28Gravel0.450.310.... jake winstone 12-May-16
  • Resource Levelling Resource levelling is an algorithm used by a schedulling software to suppress overload of resource. PP Admin 20-Feb-16
  • Blockwork Blockwork Fowzullah Thaseen 26-Dec-15

Market Place

For 25+ years, APMX has been providing competency based project management training to Fortune 500 companies around the world, applying the principles of project based learning, designed to produce measurable results, generating a favorable “return on training investment”.
Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher and PMI accredited REP. Teach yourself using on-line or book based learning or run your own in-house or public PMI accredited courses.
See how the TIME - LOCATION - VIEW brings clearness to your work programmes