Introduction

679
The Wiki is a knowledge-base that can be contributed to or utilized by anyone with skills and / or interest in planning, scheduling or project controls.

No Wiki page or article is owned by its creator or any other editor, and its content relies upon collaboration and teamwork.  How can you contribute?

Every Wiki page may be improved upon and edited by a logged-in Planning Planet commnity member.  Disclaimer / Read more...

Glossary

" (2) | 0 (7) | 3 (2) | 4 (3) | 5 (2) | 6 (1) | 7 (3) | A (24) | B (43) | C (75) | D (29) | E (24) | F (33) | G (13) | H (13) | I (17) | J (1) | K (4) | L (12) | M (23) | N (6) | O (12) | P (51) | Q (1) | R (37) | S (65) | T (37) | U (2) | V (4) | W (22) | Z (2)

Latest Posts

  • Lean Construction Methods & CPM Scheduling Work Together Lean Construction methods are becoming common practice on construction projects with the use of the Last Planner® system (LPS) as a planning and scheduling tool. The Last Planner® system emphasizes a... David Hatwell 26-Jun-17
  • Notice Provisions Protect Contractors from Risk Notice provisions – those formal and time consuming notices to owners about delays or changes on a project – are an often ignored requirement on construction projects. While they are tedious and at... David Hatwell 26-Jun-17
  • Utilizing CPM Schedules to Track Resources Can Cuts Costs Aegis Project Controls’ primary purpose is to support project management teams in their efforts to minimize the duration, risk and cost associated with their projects. While critical Path Method... David Hatwell 26-Jun-17
  • Benefits of the Interdependent CPM Schedule Model   What is wrong with the Status Quo? Timely, Costly, Inefficient, Opaque.  All of these words describe the development of a baseline schedule. Additionally, they also resonate... David Hatwell 26-Jun-17
  • project management tool An intelligent project management tool, that thinks for you and make some valuable suggestions to choose the best employee for a specific project you select.Website:www.PineStem.comDashboard:You have... shakeel123 14-Jun-17
  • S Curve & Progress Tracking through Excel What is S-Curve?S-Curves are very important project management tool; they allow the progress of a project to be tracked visually over time and form a historical record of what has happened to date. S... bijukrishna 08-May-17
  • S Curve & Progress Tracking through Excel What is S-Curve?S-Curves are very important project management tool; they allow the progress of a project to be tracked visually over time and form a historical record of what has happened to date. S... bijukrishna 08-May-17
  • 7 Ways to Overcome Remote Work Challenges Remote work has become the new norm these days. According to a research, more than one-third of remote workers telecommute for few hours every week in the US. The situation is not different in other... Syed Mohammad Anwer 20-Apr-17
  • Planning Software Hi all, how to avoid the import of rubbish information impacting Global Calendars, UDF, Codes within EPPM 15.2.13 Database.  Users without edit xml template permission can only select one... El.vira 15-Feb-17
  • Building & Construction Building & Construction Production Rates & Build Times: Hi there,Sending Builing & Construction MEP production rates & Build Times to rizwanbtech@gmail.com in excel format would... rizwan 17-Jul-17
  • BIM Software BIM Software covers many aspects of the stages of BIM and can be used to demonstrate each stage as part of the BIM methodology. Software includes the following :Asta Powerproject BIM3D - Autodesk... vann123 16-Nov-16
  • Asta Powerproject Enterprise  Asta Powerproject is a project and resource management software solution for organisations that manage people working across multiple projects, programmes and project portfolios.The enterprise... vann123 16-Nov-16
  • Asta Powerproject  Asta Powerproject is proven robust and scaleable software, rated no.1 by the Planning Engineers Organisation for construction project management and planning.70% of successful UK construction... vann123 16-Nov-16
  • Critical Path DRAG Critical Path DRAG (Devaux's Removed Activity Gauge) is the amount of time that an activity on the critical path (i.e., the longest path through the project) is adding to the project’s duration or,... 25464 16-Nov-16
  • Common Scheduling Mistakes What is Scheduling? Now-a-days, in construction industry, the parameters that define the success of a project are delivering the required facility, at the required standard (quality), within the... hotPMO 07-Sep-16