Oil & Gas Senior Planning Engineers - Primavera, Flexlife Ltd, Bacchus

START Date: 
January, 2010
END Date: 
July, 2010

Implemented a Primavera P6 planning system running in a virtual Windows environment on an Apple Mac OS. Developed a master project schedule integrating a portfolio of Apache oilfield projects inclusive of Bacchus subsea tie-back to Forties Alpha.

Experience Hours (Planning & Scheduling): 
1000

Oil & Gas Senior Planning Engineers - Primavera, Talisman Sinopec Energy UK, Golden Eagle

START Date: 
January, 2012
END Date: 
April, 2015

Delivery of Golden Eagle over Claymore project for three years, completed within baseline budget and schedule. This project required a FEED study, options analysis and selection, detailed design, subsequent fabrication and installation of a 30” export pipeline, 14” import pipeline and new SSIV structures complete with brownfield modifications to infrastructure and controls systems. Led the implementation, planning and creation of a Projects Master Schedule and Earned Value reporting system to measure, monitor and control progress.

Experience Hours (Planning & Scheduling): 
6000
Experience Hours (Cost Management): 
500

Planning Manager – Contracts Administrator – Project Manager - Scheduler, Select International Services, Multiple, US Embassy and US DoD Facilities Support

START Date: 
November, 2014

•         Responsible for Profit and Loss for all Business projects and endeavors, leading to 9 months straight of profit realization

•         Developed Organizational Structure and Departmentalization for a small to mid-sized company (less than $12m total annual revenue) including:

o    Construction and Construction Sales

Experience Hours (Planning & Scheduling): 
3150
Experience Hours (Cost Management): 
2400
Experience Hours (Forensic Analysis): 
1000

PLANNING ENGINEER, Whessoe LGA Gas Technology, Dabhol LNG Project, Depa LNG Tankage Project, Kotri Barrage Rehabilitation Project, Hammerfest LNG Project

START Date: 
October, 1996
END Date: 
March, 2000
During my time at Whessoe, I was employed at the head office on both live contracts and tenders, using Primavera P3, Suretrak & Microsoft Project 98 computer systems, with supporting documentation produced using various Microsoft packages. In this time I have worked on design only projects, EPC projects, tenders and FEED studies.
Experience Hours (Planning & Scheduling): 
6500
Experience Hours (Cost Management): 
500

PLANNING ENGINEER, AMEC Capital Projects (Downstream Oil & Gas), BP CATS Valve Upgrade Project, Bathgate Gas Compressor Station New Works, Kings Lynn Gas Compressor Station Upgrade Project

START Date: 
March, 2000
END Date: 
July, 2003
During my time at AMEC I worked at both the Darlington office and various sites, on live contracts, tenders and FEED studies, using both Primavera P3 and Suretrak computer systems, with supporting documentation produced using various Microsoft packages in-line with the company’s CTR system. In this time I have worked on design, construction, EPC projects and shutdowns.
Experience Hours (Planning & Scheduling): 
6350
Experience Hours (Cost Management): 
500

PLANNING ENGINEER, Whessoe Oil & Gas, Adriatic LNG Terminal, EBIC Ammonia Plant Project, Panipat Ethylene & Propylene Plant Project

START Date: 
November, 2005
END Date: 
April, 2008

Working at the head office in Darlington on both live contracts, tenders and FEED studies, using both Primavera P3 and P5 (P3e) computer systems, with supporting documentation produced using various Microsoft packages in-line with the company’s CTR system. In this time I have worked on design, construction and EPC projects. Responsible for programme setup / development, progress monitoring and reporting.

Experience Hours (Planning & Scheduling): 
4700

Planning and Control Engineer, MDC (Makati Development Corporation), Residential Towers

START Date: 
February, 2015

1.0 weekly look ahead

2.0 scheduling the project using primavera p6

3.0 cost loading

4.0 weekly and monthly progress report

Experience Hours (Planning & Scheduling): 
1350

Planning Assistant, Zakum Development Company (ZADCO), Site Major Works

START Date: 
August, 2008
  • Site Major Works Support and Execution assistance

 

Experience Hours (Planning & Scheduling): 
9950

Lead Planner, PARSONS AND BRINCKORHOFF, QATAR RAIL PROJECT

START Date: 
October, 2014
END Date: 
August, 2016

LEAD PLANNER

 

I am currently working as Lead planner in Parsons & Brinckorhoff for Qtar Rail project at Doha Qatar.

Qatar Rail project is a multi billion dollar project .

I am responssible for Programme analysis, progress monitoring, delay analysis, Overall progress analysis for Tunneling & Station construction progress.

Use Primavera 8.2 ,TILOS as programming software. 

Planning Engineer, CLC Gestion de Projet & Conseil, Various National & International Projects

START Date: 
January, 1995
END Date: 
July, 1998

- ALSTOM TRANSPORT : Set-up of a resource management system for the ATS department (Automatic control Transportation System) of the Signalling buisness.
- ETPM (Now ACERGY) : For EKPE revamping project (125 MUSD budget, full revamping of MOBIL EKPE installations),set-up of the marine operation planning, and follow-up offshore (9 month in Nigeria). Project was used to confirm work hours estimation methods.
- ALSTOM TRANSPORT : Bid Planning manger for Porto Metro project bid (PORTUGAL) and JFK (New-york) automatic subway.

Experience Hours (Planning & Scheduling): 
7000