Planning & Scheduling

Planning Engineer (UG Metro Construction Planner), Obayashi Corporation, Phase 2 - Dubai Metro (Greenline Underground Stations)

START Date: 
March, 2007
END Date: 
November, 2008

As responsible Construction Planner, contributed towards the construction of Dubai’s first fully automated Urban Railway Network ‘Metro System’; Dubai Metro Rail Project “Phase II Green Line”, Client- Road & Transport Authority (RTA). Main duties were-  

·   Framed out the work breakdown structure from work scope; identified detailed activities, defined chronological work sequences and interdependencies between activities as per drawings, estimate work duration and manpower resources for developing BL Schedule

Experience Hours (Planning & Scheduling): 
2800
Experience Hours (Cost Management): 
1600
Experience Hours (Forensic Analysis): 
800

Planning, AryaSasol Polymer Company, C2 Cracker Plant

START Date: 
September, 2005
END Date: 
December, 2011

 

-  preparation/modification of reports, plans, construction schedules, environmental impact studies, permits and designs for project.
-  Schedule and monitor program activity to achieve an “on-time” result including follow-up with external suppliers to ensure timely response to action items.
-  Coordinates with program staff data gathering and data management for accountability and to measure performance of

Project Support Supervisor, Salam Petroleum Services, ECS-QP EPIC Halon Replacement at Refinery ECS- QP Ras Laffan Landscape Design & Engineering ECS - Crude Oil Storage Tank Foundation at Khatiyah Main in the Dukhan Fields ECS – QP Design of Internal

START Date: 
March, 2008

Current Role

Have the stewardship of the Company’s Project Control Section which is responsible for the Planning, Scheduling, Control and monitoring of all prepared project execution programs, preparation of Expenditure Request (ER) Estimate if required of projects being undertaken by the Company. The responsibility includes the preparation of projects cost estimate for (EPIC) tenders intended for oil & gas and power industries such as Qatar Petroleum, Qatar Gas, Kahramaa, Dolphin Energy and others.

Sr Planner, DOHI, Sohar-02 IPP

START Date: 
February, 1992

Current Role

Working as a Sr Planning Engineer at the Sohar-02 IPP. I am having experience at various levels beginning from execution, procurement, estimating & planning. I am proficient in Primavera P3 3.1, Primavera P6 & MS Project. I am in the field of planning since 05years. I have worked on multistorey building projects in India & industrial projects in Oman. I am having a total experience of 19years of which 08years in India & 11years in Oman.

PLANNING MANAGER / Chief Planner, CHINA CONSTRUCTION AMERICA [CSCEC], The Baha Mar Development

START Date: 
August, 2010

CHIEF PLANNER. More than 22 years of construction work experience in Hong Kong, Macau, China, Philippines and Carribean. Had been involved in mostly large-scale infrastructure projects. Areas of focus include project-planning, scheduling & control, development of the comprehensive program/project management plan, earned value management and risk management. Extensive work experienced in Civil Engineering & Infrastructure Projects (i.e.

Planning Manager, Al Naboodah Laing O'Rourke, Burj Dubai - Old Town Commercial Island, Dubai

START Date: 
June, 2002
END Date: 
August, 2006

During Tender Stage:

  • Establish programme strategies/method of construction
  • Prepare & analyze tender programme.
  • Estimate man power and plant & machinery requirements
  • Estimate formwork / scaffolding requirement
  • Participate in final settlement meetings to put together a competitive tender

During Construction Stage:

  • Manage a team of 5 Planning Engineers and 5 Performance Measuring Engineers
  • Produce a proje

Planning & Project Controls Engineer, Belleli Energy, EPC contract for Fabrication, Erection, Testing and Surface Coating of 25 Nos. of Storage Tanks for Ras Gas Expansion- II Project under the consultancy of Chiyoda / Technip Joint Venture

START Date: 
October, 2007
END Date: 
May, 2008

Current RoleCompany: Helix Subsea Construction

Designation: Project Planner

 

Company profile: Helix Subsea Constructionis a division of Helix Energy Solutions performs pipe lay and subsea construction operations in deepwater oil & gas fields worldwide, with advanced DP vessels for pipe laying, subsea tree and manifold tieback installations, and many other specialized subsea applications.

 

Planning And Scheduling Lead Engineer, Technip Yamgaz, Fabrication Of Sructural Pre-Assemble PiperacksvAnd Piping For Yamal LNG Project

START Date: 
May, 1989

23 years of experienced in Planning and Scheduling Engineer For OilnAnd Gas, Refineries, and Petrochemicals Project. With knowledge in Primavera P3 and P6.