Planning Engineer , RAY ENGINEERING LTD , MUMBAI, INDIA , Fabrication, Erection & Commissioning of Hydrogen plant at IOCL (Praxair site), Paradeep, Orissa

START Date: 
December, 2007
END Date: 
November, 2012

Coordinating with client and PMC; participation in technical review of design

Managing reviews and inputs for project planning and scheduling; preparing progress reports

Implementation of pro‐active quality improvement system

Assist designers and the project leader in budget estimation of construction Projects

 Invoicing

Experience Hours (Planning & Scheduling): 
10000

Planning Manager, Stefanutti Stocks, Kusile Power Generation Project

START Date: 
June, 2013

SSBR (Stefanuti Stocks & BasilRead JV) (15/07/2013 - Current)

Planning Manager

 

Kusile Project (Head of Planning Department)

 

Experience Hours (Planning & Scheduling): 
100
Experience Hours (Cost Management): 
50
Experience Hours (Forensic Analysis): 
100

Project Controls Manager, Morgan Sindall PLC, (various projects) @ all UK

START Date: 
July, 2008
END Date: 
June, 2012

Morgan Sindall PLC Project Controls Manager Ensure project controls best practices were understood and followed by the all project teams based at Heathrow. •Managed a portfolio of terminal refurbishment projects. •Put in place the project controls strategy, wrote and developed Project Controls Procedure. •Managed progress, actual cost, schedule and cost risk. •Configured Primavera P6 software, set up and maintained Primavera P6 programmes for all contracts including NEC contracts. •Delivered two projects matching the “Perfect Delivery” criteria.

Experience Hours (Planning & Scheduling): 
3000
Experience Hours (Cost Management): 
2000
Experience Hours (Forensic Analysis): 
3000

Planning Engineer, Tornado General Trading and Contracting, 1) Building Projects 2) Road Projects

START Date: 
April, 2016
END Date: 
July, 2016

Bid schedule, Claims, Schedule Control and Monitoring, Progress Reporting, Meeting Coordinator, Master Schedule

Experience Hours (Planning & Scheduling): 
250

Planning Engineer, Saudi Oger Ltd., 1) King's Palace Projects 2) Buildings 3) Infrastructure

START Date: 
November, 2014
END Date: 
November, 2015

Generate and Develop Bid Schedule, Master Schedule, Control and Monitoring Schedule, Reports, Schedule Analysis

Experience Hours (Planning & Scheduling): 
2000

Planning responsible #planningengineer #claims #projectcontrols #pcglobal #planningplanet #guildofprojectcontrols #disputes #jobs #disputereolution #planning #projectplanner #construction #pcg #plan, OAS Construtora, Trinidad and Tobago, Sir Solomon Hoch

START Date: 
September, 2014
END Date: 
June, 2016

-->Estimated quantities and cost of materials and equipment for civil/structural components (bridges, drainage and crash barriers) to determine project feasibility

-->Prepared regular interval progress reports regarding earthwork, asphalt, structural and storm-water systems using Microsoft Office and AutoCAD

-->Digitally archived weekly progress and technical “Knowledge Base” photographs of all sites and projects.

-->Assisting in the Planning/Scheduling of works and updating the Monthly production reports which interpret Planned vs. Executed quantities

Experience Hours (Planning & Scheduling): 
1000
Experience Hours (Cost Management): 
500
Experience Hours (Forensic Analysis): 
500

Planner/Scheduler, Junior Sammy Contractors Limited, & Oil & Gas Projects 2) Buildings 3) Infrastructure

START Date: 
January, 2017

--> Developing work schedules & quantity takeoffs for varying services (Civil/Structural, duct banks, manholes, underground piping and drainage systems)

--> Monitoring both on and off-site progress for both Civil/Underground Piping work at Union Industrial Estate and Corridor/Berth (port) operations, La Brea

--> Engaging with site teams of varying services to minimize interface delays.

--> Reviewing plans and specifications for effective schedule development.

Experience Hours (Planning & Scheduling): 
4000
Experience Hours (Cost Management): 
250
Experience Hours (Forensic Analysis): 
250

Project Engineer, Avida Land Corp. (An Ayala Land Company) and Filinvest Land Incorporated, Residential and Infrastructure Developments

START Date: 
October, 2004
END Date: 
June, 2007
  • Project management, construction planning and scheduling, site operation, quality control and safety implementation of all phases of construction works.
  • Reviewed, checked and evaluated Contractors construction schedule, quantities, variation orders and progress payment applications.
  • Assessed the impacts of design or construction changes and determined the cost and time implications.
Experience Hours (Planning & Scheduling): 
3000
Experience Hours (Cost Management): 
3000
Experience Hours (Forensic Analysis): 
1000

Planning Engineer, Laing O’Rourke Construction Hong Kong Limited, Express Rail Link (XRL) Contract 810B - West Kowloon Terminus Station South

START Date: 
January, 2012
END Date: 
March, 2013
  • Provided reports regularly to Top Management and Client.
  • Planned, developed and maintained schedules and associated resources.
  • Updated Project Controls Report for company-wide integrated Project Controls System.
  • Performedprogramme analysis and scenario studies to design changes, construction sequences, resources requirement, productivity rates, logistics planning and procurement.
  • Organized and facilitated planning sessions with project teams for schedule variances that impact milestone key dates and concluded remedial action plans.
  • Monitored crit
Experience Hours (Planning & Scheduling): 
2500

Senior Planning Engineer, MMC Gamuda KVMRT (PDP) Sdn Bhd, Klang Valley Mass Rapid Transit Line-1: Sungai Buloh - Kajang (SBK)

START Date: 
April, 2013
END Date: 
March, 2017
  • Civil Infrastructure Programme Management of:
    • Elevated Packages– viaduct structures, stations, depots and car parks;
    • SSP Spur line– viaduct structure connection of SBK (Line-1) to SSP (Line-2) depot with 0.55km viaduct (two single track line – 0.30km & 0.25km length);
    • SSP Depot1– additional stabling yard to existing SBK Sungai Buloh depot.
  • Provided reports regularly to Top Management and Client.
  • Developed and updated Project Dashboard and Time Chainage programme.
  • Reviewed, evaluated and monitored th
Experience Hours (Planning & Scheduling): 
8000
Experience Hours (Forensic Analysis): 
1000

Market Place

See how the TIME - LOCATION - VIEW brings clearness to your work programmes
Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher and PMI accredited REP. Teach yourself using on-line or book based learning or run your own in-house or public PMI accredited courses.
For 25+ years, APMX has been providing competency based project management training to Fortune 500 companies around the world, applying the principles of project based learning, designed to produce measurable results, generating a favorable “return on training investment”.
Syndicate content