Planning Manager

Planning Manager, Nuvia, SDP

START Date: 
November, 2012
END Date: 
May, 2014

Nuvia November 2012 – May 2014 PLANNING MANAGER (Nuclear Design)

• Lead Design Planning Engineer working on the SDP Plant at Sellafield. Joined the ‘team’ to lead the existing ‘area design planners’, introducing standards and QA into the existing operations.

• Appointed Planning Manager after 3 months, due to the quality and self-initiatives that I had already incorporated into the planning function.

Experience Hours (Planning & Scheduling): 
4000

Planning Manager, Atkins, Barrow Strategic Redevelopment

START Date: 
May, 2014
END Date: 
April, 2016

Atkins May 2014 – May 2016 PLANNING MANAGER (D&E / Major Projects)

• Heading up the Planning and Project Control functions for ‘BSRP’ – Barrow Strategic Redevelopment Programme, £350M Capital Investment.

Experience Hours (Planning & Scheduling): 
4500

Planning Manager, IMECO, Abu Dhabi, UAE, Oil & Gas \ Infrastructure \ Irrigation and Landscapes\ Heavy Civil Engineering

START Date: 
January, 2009
END Date: 
May, 2010

Oil & Gas \ Infrastructure \ Irrigation and Landscapes\ Heavy Civil Engineering o Prepared pre and post contract program including tentative\planned curve for progress and cash flow tracking for multi-disciplinary projects o Prepared master program based on concept or available information o Prepare, implement & control resource loaded Clause 14.1 program to meet Contractual milestone or Completion date o Design follow up, review & recommend on contract documents, BOQ & drawings o Comparative study\analysis on priced BoQ of contractor based on similar projects o Highlighted

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
1000

Planning Manager, National Grid Company, All Projects within company portfolio

START Date: 
May, 2014
END Date: 
May, 2016
Outage Coordination Manager Lead Capital Delivery Projects at Risk ProcessesImplement Impact AssessmentsDevelop Integrated Schedule Management

Planning Manager, ROOTS STEEL INTERNATIONAL, SAUDI ARABIA, King Abdulaziz International Airport(KAIA), Jeddah,

START Date: 
January, 2013
END Date: 
May, 2014

-      Analyze,reviewandcommentonEPCCcontractor’sschedule

-      Analyzeandreviewthecriticalpathandresourcesallocation,utilizingproductionrateandadjacentdurations

-      Identifypotentialrisks,maintainariskregisterandsuggestmitigationplan

-      Developphysicalprogressmeasurementsystem(PPMS)

Experience Hours (Planning & Scheduling): 
1400
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
450

Planning Manager, Ansaldo ASTS, Cityringen (Copenhagen METRO)

START Date: 
April, 2014
END Date: 
February, 2016

planning manager for the metro projects in the area of Copenhagen

Planning Manager, Lautec ApS, offshore wind farms in Taiwan

START Date: 
February, 2018

Internally supporting in setting up the company planning processes.

Externally working as a senior planner for offshore wind power projects.

Planning Manager, Telent UK, RETB Scotland (Radio Electronic Token Block)

START Date: 
July, 2014
END Date: 
November, 2015

Network Rail is in the process of replacing their current RETB radio system for the Far North and West Highland Lines in Scotland. After a life extension of infrastructure systems, the Next Generation RETB project is planning to Design, Manufacture, Test, Commission the replacement of the radio system element (NRN) as the frequencies used are due to be returned to OFCOM at the end of 2015.

Experience Hours (Planning & Scheduling): 
2350
Experience Hours (Cost Management): 
150
Experience Hours (Forensic Analysis): 
100

Planning Manager, Highways England, A21, M20 3-5, M20 J10A

START Date: 
April, 2017

Highways England Planning Manager for Smart Motorways and Major Projects

Experience Hours (Planning & Scheduling): 
2050
Experience Hours (Cost Management): 
2050
Experience Hours (Forensic Analysis): 
2050

Planning Manager, Giffen Group, Various NWR and LU Projects

START Date: 
February, 2012
END Date: 
March, 2017

Giffen Group Electrical Contractors

PROGRAMME & PLANNING MANAGER

Feb 2012 - March 2017

Leading Electrical, Signalling & Power Contractor across railway infrastructure, with key works including HV, LV and DC installation and testing

Experience Hours (Planning & Scheduling): 
10000
Experience Hours (Cost Management): 
10000
Experience Hours (Forensic Analysis): 
7000