PLANNING ENGINEER

1.“planning engineer”, Sinohydro Group, Qatar, Kahramaa Awareness Park Project

START Date: 
July, 2007

Working as a Planning Engineer in Sinohydro Group Qatar for KAHRAMAA Awareness Project.

Planning Engineer, NSG Environmental Ltd, Many projects for clients including: Sellafield Ltd, Nuvia, Nuclear Technologies

START Date: 
June, 2009
END Date: 
June, 2011

Working with a portfolio of projects ranging in duration from 2 month up to 60 months. Supporting the project teams with key accountabilities such as

 

·          Managing the project plans a project plan on a monthly / weekly basis

·          Monitoring a portfolio of projects

Planning Engineer, Descon Engineering Abu Dhabi, ADGAS

START Date: 
May, 2006
END Date: 
November, 2009

 

Working as a SR. PLANNING ENGINEER with DESCON ENGINNERING ABU DHABI U.A.Esince May 2006 to Oct 2009.

PROJECT DESCRIPTION:

·         ABU DHABI GAS LIQUAFICATION CO (ADGAS) (OFFSHORE) DAS ISLAND, Major Plant Overhaul Train-III, Boiler 5 & 6 - Turnaround 2009

Planning Engineer, Clough Amec Ltd, & Oil & Gas Projects

START Date: 
December, 2006
END Date: 
June, 2008

Oil and gas projects.  Progressing projects, interfacing to cost system.  Closing out projects.  Reporting weekly.

Planning Engineer, REDCO Construction - ALMANA, Viva Bahriya 11 &17,

START Date: 
April, 2009
  • Create project schedule
  • Monitor and Update project schedule
  • Highlight critical activist to project management
  • Prepare and submit weekly and monthly report

Planning Engineer, Engineering Consultants Group (ECG), AL-Waab City

START Date: 
January, 2009
END Date: 
July, 2010

 

  • Prepares progress reports and other highlights of the projects.
    •  Review contractors’ schedules and manpower loading.
    • Review earned value analysis report.
    •  Review and check construction plans.
    •  Develop manning schedule and manpower for project under ECG head office.
    •  Develop design’s programmes for design projects with PWA and Kahrama.
    •  Prepare proposal and preliminary schedule for tender.

Planning Engineer, J&P Overseas, Multiple Projects

START Date: 
May, 2007

Current Role in Project Planning and Controls for Building and Infrustructure Projects.

Planning Engineer, Sharjah General Contracting, King Abdul Aziz Viaduct - Package 5

START Date: 
September, 2001
END Date: 
October, 2010

Project Planning, Weighting distribution, Progress recordi and reporting, Risk analysis, Cash flow generating, Project monitoring, resource histogram preparation, Claim for EOT, etc.

Planning Engineer, ACC Arabian Construction Company, M.S. Al Suwaidi Industrial Services, EEI Corporation, Construction of High Rise Towers, Low Rise Buildings, Palace, Villas, Mosque

START Date: 
September, 1997
END Date: 
November, 2018

As a Planning Engineer my duties and responsibilities in my previous company are but not limited to the following:

Ø  Prepare and update the project resource loaded schedule

Ø  Monitor and control during the construction period

Ø  Prepare and submit standard periodic reports and other requirements by the stakeholders

Ø  Update, evaluate and measure the progress and KPI’s against the baseline and resources available at the site

Experience Hours (Planning & Scheduling): 
40000
Experience Hours (Cost Management): 
6000
Experience Hours (Forensic Analysis): 
10000

Planning Engineer, Hatch Associates Pty Ltd, Woodside LNG4 Train 4

START Date: 
April, 2001
END Date: 
January, 2004

LNG Phase 4 Expansion Project
Client: Woodside
EPCM Joint Venture: Kellogg Joint Venture

Experience Hours (Planning & Scheduling): 
2000