Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

PLANNING ENGINEER

Planning Engineer, Wade Adams Contracting LLC or HILALCO, KPIZ – Khalifa Port & Industrial Zone ( Package 1001-290)

START Date: 
September, 2008
END Date: 
December, 2012

Key Deliverables:

ð  Worked as Planning Engineer with Primavera 6 version 7 as Planning Tool.

ð  Monitoring was 3 dimensional - Duration is the base, where progress or execution with BOQ quantities & Earned value are monitored periodically.

ð  Monitoring Design, Procurement, Construction Progress & Resources in coordination with Design Consultant / Site Supervision / Management.

PLANNING ENGINEER, KNM Process Systems Sdn Bhd, Columns, Fabrication of Equiments (Pressure Vessel, Heat Exchanger, Reactors, Skids, Tanks etc.)

START Date: 
April, 2008
END Date: 
May, 2011
First route of Planning Engineer in Oil & Gas field where exposure in planning cum project handed. Involved in various design, fabrication, construction, costing and preparing proposal to furnish oil & gas equipment’s such as pressure vessels, heat exchangers, skid, column, storage tanks, piping spools, supply labour and the other oil & gas equipment.
Experience Hours (Planning & Scheduling): 
5500
Experience Hours (Cost Management): 
500

Planning Engineer, Tengizchevroil, Industrial Cnstruction projects

START Date: 
August, 2007
END Date: 
June, 2009

Roles / Responsibilities / Achievements:

 

  • Developed an integrated (Engineering, Code Compliance/ Permitting, Procurement and Construction) Level 4 Primavera Schedule with milestone dates, precedents and durations established through workshops and meetings with Project Management team including Project Engineer, Construction Manager, Procurement manager, Laboratory consultant and design discipline leads.
  • Worked closely with the multi-discipline team to develop a Level 5 tracking t

PLANNING ENGINEER, Laing O Rourke UK, Crossrail - (C430) Farringdon Enabling Works (including 3 years Tender Planning)

START Date: 
April, 2007
END Date: 
April, 2012

This role with LOR commenced in the Tender Office at Dartford. During this time I working onthe following bids:

1) Kingsnorth Coal Fired Power Station (Enabling & Main Civils) £100M+

2) Hinkley Nuclear Power Station (Enabling & Mainworks) £200m+

3) Kings Cross Western Range (Kings X Station) £75m+

4) Crossrail Packages (Enabling & Main Works) £100m+

5) Bond Street Station Upgrade £100m+

6) Blackpool Tram System & Depot £40m

Experience Hours (Planning & Scheduling): 
10000
Experience Hours (Cost Management): 
2000
Experience Hours (Forensic Analysis): 
1000

Planning Engineer, Top Builders Group Ltd., The Venetian Macau project

START Date: 
August, 2006

Involve in preparation of the tender and contract documents. Responsible for the detailed project planning, budget forecast for work packages, site progress monitoring, resource and labour forecast, liaison with clients and sub-contractors for interfaces and milestones of the project. In-charge for the preparation of Extension of Time claims for all work packages.

PLANNING ENGINEER, "Drake & Scull International, Dubai", High rise Buildings

START Date: 
May, 2008
END Date: 
April, 2015

§    Preparation of Baseline Schedule as per the contract conditions.

§    Calculating and Loading the schedule with all the resources like Man-hours and Equipment hours. (For forecasting the manpower requirements)

§    Work break down structure as per the project requirements.

§    Deciding the appropriate weekly and monthly progress report formats.

Experience Hours (Planning & Scheduling): 
22050
Experience Hours (Cost Management): 
10000

Planning Engineer, Quays Projects Limited, & Power infrastructure works

START Date: 
November, 2007

Planning Engineer. Earned Value Management , Primavera , Energy , Rail , Infrastructure Projects

Planning Engineer, ETA - ASCON GROUP, Buildings & Finishes

START Date: 
March, 2006
END Date: 
June, 2008

Project Planning & Scheduling

Sub-contract Management

Project Reporting metrics

Extension of Time

Delay Mitigation strategies

Planning Engineer, Al Muhandes Contracting Co., The Public Library Project

START Date: 
December, 2004
END Date: 
October, 2005

o    Tender planning & Submission.

o     Develop project plans and resource loaded schedules

o     Preparing construction method statements.

o     Helping in deciding the construction methodology.

o     Worked in variety of projects, High rise buildings, Hotels, Hospitals, residential and mixed used developments.

Experience Hours (Planning & Scheduling): 
1900
Experience Hours (Cost Management): 
300
Experience Hours (Forensic Analysis): 
300

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content