Planner/Scheduler, Rizzani De Eccher, Tajik Afghan Bridge, Delhi Metro Rail Project

START Date: 
July, 2002
END Date: 
April, 2008

Project Control Engineer reporting to the Branch Manager. Performed planning and scheduling, prepared schedule of works, and reports for client and consultant submission.  Reporting included schedule status and progress, schedule look ahead, s-curve man-hour analysis of forecast versus actual, and mitigation plans to recover schedule delays. Prepared monthly invoices and weekly/monthly progress reports. Organized and controlled material procurement schedule to expedite material deliveries.

Planner/Scheduler, Rizzani De Eccher, Tajik Afghan Bridge, Delhi Metro Rail Project

START Date: 
July, 2002
END Date: 
April, 2008

Project Control Engineer reporting to the Branch Manager. Performed planning and scheduling, prepared schedule of works, and reports for client and consultant submission.  Reporting included schedule status and progress, schedule look ahead, s-curve man-hour analysis of forecast versus actual, and mitigation plans to recover schedule delays. Prepared monthly invoices and weekly/monthly progress reports. Organized and controlled material procurement schedule to expedite material deliveries.

Planner/Scheduler, Rizzani De Eccher, Tajik Afghan Bridge, Delhi Metro Rail Project

START Date: 
July, 2002
END Date: 
April, 2008

Project Control Engineer reporting to the Branch Manager. Performed planning and scheduling, prepared schedule of works, and reports for client and consultant submission.  Reporting included schedule status and progress, schedule look ahead, s-curve man-hour analysis of forecast versus actual, and mitigation plans to recover schedule delays. Prepared monthly invoices and weekly/monthly progress reports. Organized and controlled material procurement schedule to expedite material deliveries.

Sr. Planning Engineer, Al Sabbah Electro Mechanical - Al Fara'a Group, MEP

START Date: 
March, 2013
  • Project Control and Monitoring
  • MEP Planning and Scheduling
  • Progress Reporting
  • Payment Application and Billing Forecast

CEO and President, Project Auditors LLC, Multiple

START Date: 
January, 1977

 

<em>Frank Parth, MS, MSSM, MBA, PMP</em> is the President of Project Auditors LLC and have 35 years experience in project and program management. I had my first career in the aerospace industry, ending as the assistant technical director in the Integration Offices of a $12 billion satellite program for the USAF.

Planning Engineer, Nasser S Al-Hajri Corporation, Raz Al-Khair Aluminium Smelter Plant Project

START Date: 
August, 2010
END Date: 
March, 2012

 

Activities & Responsibilities:

§  Project Progress Monitoring

§  Scheduling

§  Planning & Intra discipline Co-Ordination

§  Quantity take-off

§  Development of Progress Measurement System

§  Preparation of Engineering Reports

§  Database Controlling by Updating the Progress in MS Access

Resident Construction Engineer-Architect, Saudi Arabian Parsons, Mediacl Center, School

START Date: 
March, 2013

Resident Construction Engineer: Saudi Arabian Arabian Parsons : July 25 - Present Yanbu KSA

Project Superintendent/ Project In Charge: ASEC Devt and Construction : June 2011 to June 2012 Manila Philippines

Senior Design Manager: Southwest Architecture: February 10 2004 to May 10 2011 Doha Qatar

College Instructor: BCAT , June 1999 - September 2003 , Bicol Region Philippines

Principal Architect: JBO Architects , 1997- 1998  Bicol Region Philippines

Architectural Designer : Philip H. Recto - April 1996 Makati Philippines

Planning Engineer & Site Engineer, Arabtec Construction LLC, College of Arts and Education - Kuwait University

START Date: 
December, 2012

 

1.      Supervising and superintending the day to day site activities to deliver production to the maximum rate with the required satisfying level of quality according to the project specs.

2.      Coordinating the materials (Formworks) recycle plan within the site to put them at the maximum level of efficiency

Project Planning, ISG PLC, London 2012 Olympic Games

START Date: 
October, 2011
END Date: 
September, 2012

Planner for ISG PLC on behalf of LOCOG (London Organising Committe of the Olympic Games) for London 2012

ISG PLC acted as Principal Contractor under the Construction Design and Management (CDM) regulations for the client (LOCOG) providing construction industry health and safety and planning expertise.

Project Planning, ISG PLC, London 2012 Olympic Games

START Date: 
October, 2011
END Date: 
September, 2012

Planner for ISG PLC on behalf of LOCOG (London Organising Committe of the Olympic Games) for London 2012

ISG PLC acted as Principal Contractor under the Construction Design and Management (CDM) regulations for the client (LOCOG) providing construction industry health and safety and planning expertise.