Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

planning and scheduling

Planning and Scheduling engineer, HICAPS, UNC A&T State University, Morrison Hall Dormitory Renovation

START Date: 
April, 2004
END Date: 
July, 2005

Working with the Contractor and subcontractors facilitated the development of the baseline construction schedule using planning information. Provided bi-weekly updates and summary narrative reports detailing the longest/critical driving paths, performance analyses, suggestions to improve and/or avoid potential impacts for immediate timeframe and projected timeframe.  

Planning and Scheduling Engineer, HICAPS, Guilford Technical Community College, Technical Education Center

START Date: 
April, 2004
END Date: 
June, 2004

Working with Contractor, faciltated the development of the Contractor's baseline schedule.

Planning Engineer Manager, TR Oman (Tecnicas Reunidas), Saih Rawl Gas Compression and Power Generation Project.

START Date: 
June, 2009
END Date: 
July, 2010
  • Created the overall master plan, level 5; commissioning schedule; installation and modification control room; logic integration test plan and other relevant documents using Primavera, MS Projects and other tools.
  • Generated work reports (daily, weekly, monthly) including information on critical activities and critical path.
  • Chaired all planning meetings with management and construction site staff, coordinated site activities shown in Primavera P3,  MS Projects and other tools.
  • Focused on critical path tasks and identified problems during project

Planning Manager, Genivar, University of Montreal Hospital (CHUM) & Research Centre (CRCHUM) Projects

START Date: 
August, 2008
  • Planning team management during concept & tender phases
  • Established master schedule & budget S-curve using primavera P6
  • Responsible for progress follow-up & Contractors’ schedules overview and approvals
  • Review contractors’ monthly reports & recommend Client responses
  • Report on Project progress & advise Client and ministry of health
  • Member of the proposals review committee
  • Tender documents & tender schedules preparation

Lead Planner, First Wall, UKAEA, Joint European Torus (JET)

START Date: 
July, 1997
END Date: 
July, 1998

Responsible for all First Wall related planning activity associated with the leading research project into power generation via Nuclear Fusion, involving:

  • Development of detailed level 3 and 4 networks to cover all aspects in preparation of ( and during) interventions and planned shutdowns of the Torus machine.
  • Production of detailed schedules covering all aspects of the required logistics to support Remote Operations during the Shutdown.
  • Production of long term plans for work package co-ordination and resourcing purposes.
  • Resourcing of the progr

Project Planner, Rhead Group, National Grid - CNI Project

START Date: 
November, 2011
END Date: 
January, 2012

Employed by the Rhead Group and contracted to National Grid working as a Planner on the client side of the contract. Main duties involve interrogation of sub-contract programmes and ensuring that timescales and budgets are met, as well as supporting the commercial and site teams to ensure appropriate management of a large programme of works.

Project Engineer / Responsible Mechanical Engineer, Enexco Teknologies India Limited, PT Semen Andalas, Lafarge Group

START Date: 
March, 2006
END Date: 
December, 2006

 

·         Basic responsibilities includes erection, commissioning and troubleshooting of Company manufactured/ supplied machineries mainly for cement plant, like Wagon Loader, Rotopacker, Long Belt conveyors, Truck Loader, Equipments for silo extraction system like air slides, manual gates, Flow control gates etc.

·         Installed 2 nos. Wagon Loader inLAFARGE INDIA, JOJOBERA, JHARKHAND.

Planner & Senior Planner, Al Rushaid Construction Company / EEI - KSA , Sharq Petro-Chemical Plant & Ghazlan Power Plant Projects - KSA

START Date: 
September, 2000
END Date: 
August, 2007

v  Responsible in preparation of the Baseline Programmed, to maintain and monitor the progress.

 

v  Responsible in preparation and maintain monthly cash flow report to the Project Management Team in able to analyze the project status regarding the cost.

 

v  Responsible to coordinate and collect information from sub-contractors to prepare Daily , Weekly & Monthly Reports to our Consultant / Client.

Senior Development Planning Engineer, ConocoPhillips Indonesia, Onshore and Offshore

START Date: 
March, 2012

Responsibilities:

- Prepare and develop schedule, man-power loading and risk assessment of different concepts for the FEL-0 up to FEL-3 activities and work closely with estimator and development engineers.
- Support of Scenario Planning for Field/Block development, identification and delivery of field development milestones and deliverables.
- Facilitating opportunity framing, concept identification, concept selection and others as required for Development Engineering teams and Be an effective focal point for the Development Engineering to

Senior Planning & Project Control Engineer, ConocoPhillips Indonesia, Onshore and Offshore

START Date: 
August, 2011
END Date: 
March, 2012

Responsibilities:

  • Develop planning and scheduling, progress measurement and progress reporting requirements and to incorporate them into the Tenders / Agreements (FEED, EPC)
  • Depth-in review and analysis of all submittals from contractors related to planning, scheduling, progress measurement, reporting, time analysis, project resource loading, critical path, productivity, compliance with work breakdown structure, production of 'what if scenario, individual plan to suit both COPI, BP Migas and Contractors, includes verification of

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content