Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

%100- Poject Planning; Progress Reporting; MS Project Master Schedule

2 months junior planner, daral arkaan, %26 Oil %26 Gas Projects 2) Buildings 3) Infrastructure

START Date: 
October, 2016

Preparation of schedule on primavera adding activities, resources, monitoring cost

Area Planning Manager, Transnet Port Terminal, 1. Road Rehabiliation project; 2. Truck staging; 3. 3rd Tipple installation - RBY; 4. Additional Tippler Installation - SLD; 5. Canteen Construction - Maydon Wharf; 7. PE Manganese Refurbishment Pahse 1;

START Date: 
January, 2015

Project Scope and Time Management

 Utilising Project Life-Cycle Project (PLP) and the integrated Capital Projects Assurance Framework (ICPAF) to:

- Collect requirements

- Identify business needs and reqwuirements

- Determining durations

- Determining Resources

- Creating Work Breakdown Structures (WBS) and Cost Breakdown Structures (CBS)

- Acquire scope freeze date approval

- Sequencing and linking activities

- Creating project schedule

- Performing Critical Path Analysis, including resource loading and smooting.

Experience Hours (Planning & Scheduling): 
5200
Experience Hours (Cost Management): 
5200
Experience Hours (Forensic Analysis): 
0

Senior Digital Design Engineer, Fujitsu Microelectronics, (various projects) @ all UK

START Date: 
May, 1995
END Date: 
June, 2006

Senior Digital Design Engineer

Responsible for successful delivery of all high speed, high performance digital designs by managing a team of engineers. I helped define the requirements, acceptance criteria, the architecture and managed the design through the various design phases ensuring that the final verification meet all the criteria requested, prior to handover in a timely manner. 

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
1000

Project Manager, Clyde Space, UKube-1

START Date: 
January, 2011
END Date: 
September, 2011

Project Managment of design phase of UKube-1, the first CubeSat for the UK Space Agency. Responsible for scheduling and budget control.

Experience Hours (Planning & Scheduling): 
200
Experience Hours (Cost Management): 
50

Planner/Schedule Engineer, JFE Engineering Corporation, Hoa Lac Hi-tech Park Wastewater Treatment Plant

START Date: 
July, 2016

Role: Schedule Engineer - Planning Department

Duties: 

- Prepare Weekly Progress report, Monthly Progress report and Bi-Annually Progress report for the Client and for Head Quarter.

- Check Subcontractor's Master and Mid-term schedules and control project's milestones.

- Collaborate with other Contractor in the Joint Venture to harmonize the work's intersections and schedule conflicts.

Experience Hours (Planning & Scheduling): 
2650

Master Scheduler / Senior Project Scheduler, Acadian Contractors, Construction of offshore & subsea facilites

START Date: 
January, 2015

·      Schedule projects with resources, critical Path visibility, monetary, and time management.

·      Plan projects through six divisions in a balanced manner.

·      Ensure adequate focus is on the exact issues that will complete the projects.

·      Use of Microsoft Project, Microsoft Office, Oracle Primavera P6, and Oracle Sage Contractor.

Assistant project engineer, Growell Hr solution Pvt. Ltd and Xeam Ventures pvt ltd. on behalf of MECON LIMITED, 2.5 MTPA exansion project of SAIL-ISP ,Burnpur

START Date: 
August, 2010

 I am involve in the 2.5 MTPA expansion project of SAIL -ISP ,Burnpur since concept stage  to    post commissioning   and looking after the following 

Design sepuer vision.

Project planning and monitoring ,

Scheduling

Estimation of Cost

Teaming  resources and Analysis

Resouce leveling

Tracking  progress

Reporting 

 Meeting with client and contractor

Experience Hours (Planning & Scheduling): 
10000
Experience Hours (Cost Management): 
10000

Area Planning Engineer, Various - most are now out of business, (various projects)

START Date: 
July, 1994
END Date: 
December, 2000

Working as Project Control/Planning on various refinery and petrochemical plants

Experience Hours (Planning & Scheduling): 
12000
Experience Hours (Cost Management): 
5000

Project Control Supervisor, ICA FLuor Daniel, •Grupo ICA, Residual water Re-Pumping system “La Caldera”, Ixtapaluca, Edo de Mex

START Date: 
April, 2010
END Date: 
July, 2010

Planning and Schedule Adviser, Delays and Claims Analysis, Risk Analysis

Experience Hours (Planning & Scheduling): 
700

Senior Planning Engineer, BECHTEL, Plus Three Consultants, OIC NETWORKS SDN BHD, MAXIS and Shared Site Sharing;Smart School, Putrajaya, Kuala Lumpur;•Proton City, Rawang;Johor River Works Extension Scheme; IT Project

START Date: 
March, 2002
END Date: 
July, 2003
BECHTEL, Kuala Lumpur, Malaysia                                                                         2/2003-7/2003
Senior Project Controls Engineer
Projects Involved:
• MAXIS and Shared Site Sharing-Malaysia
Experience Hours (Planning & Scheduling): 
1500
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
1000

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content