Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

Indonesia (AS.ID)

road maintenance advisor, resident engineer, contracts specialist, consultant, project management unit - adb assisted projects, ministry of infrastructure, east timor, roads and transport

START Date: 
February, 2011

Professional responsibilities include investigations, feasibility studies, preparation of technical proposals, design and contract administration, quality control and project management of Urban and Rural Highways.  Well versed in the preparation of Bidding Documents adopting International Financing Institution’s Bidding Documents and FIDIC Conditions of Contract suitable for International Competitive Bidding (ICB) including the preparation of all necessary supplementary and/or special technical specifications for the items of work determined for each civil wo

Senior Planning & Schedule Engineer, PT. Punj Lloyd Indonesia, 2x30MW Coal Fired Power Plant, Tanjung, Tabalong – Kalimantan Selatan, Indonesia.

START Date: 
November, 2009
END Date: 
April, 2010
  1. Create, maintain and updating Master Schedule (using Primavera Version 5).
  2. Create Two Weeks Look Ahead Schedule in level 5.
  3. Review Sub-Contractor schedule and progress and ensure the progress of Sub-Contractor is correct.
  4. CPM analysis.
  5. Oversee any possible delay of work and prepare catch up plan.
  6. Studied the possibilities of delays in the work and proposed solutions to overcome these delays.
  7. Plan allocation of labor and equipment and compare with actual conditions in the site.
  8. Make a budget plan using Primavera P5

MOHAMMED SAUD

First Name: 
MOHAMMED
Last Name: 
SAUD

 

I am BE Mechanical engineer from India & has got 4 years work experience as planning engineer in UAE( Gulf Country).

Professional Since: 
Sep-2006 (18.9 yrs experience)
Years Experience: 
0

ismu adi

First Name: 
ismu
Last Name: 
adi
Oldest experience: 
May 2009 (16.2 yrs experience, WARNING: 39.3 years variance with Professional Since)
Years Experience: 
41

Junior Project Planner, Wijaya Karya, 2x800MW Coal Fired Power Plant Eemshaven A+B

START Date: 
May, 2009

I am a junior project planner in process plant. I have experience in civil construction of Power Plant.

Hari Widiyanto

First Name: 
Hari
Last Name: 
Widiyanto

 

Professional Since: 
Sep-2004 (20.9 yrs experience)
Years Experience: 
0

Thant Zin

First Name: 
Thant
Last Name: 
Zin
Oldest experience: 
May 2004 (21.2 yrs experience, WARNING: 34.3 years variance with Professional Since)
Years Experience: 
41

Senior Planner Engineering, HNE Consultants Pte Ltd, DTL2

START Date: 
May, 2004

Working in Civil Construction Industry especially in underground tunnel, subway stations and mega steel structures.

Planning Engineer - Maintenance, PT Arun NGL Company Blanc Lancang Aceh Sumatra, PT Arun NGL Plant

START Date: 
April, 1978
END Date: 
April, 1986

Maintenance Planning Engineer - Rotating Equipment.  Engaged as a Shift Supervisor, mechanical .  Went on to assist in development of a new planning arm of the maintenace group to set up and operate the rotating equipment planning section.

Emphasis on GE and GE derivative Frame 5 gas turbines in single shaft format for power generation and twin shaft format for mechanical drive units.  Elliot centrifugal gas compressors. General gas plant rotating equipment maintenance.

Planner, PEC-Tech Indonesia, Pulp and Paper Facility

START Date: 
July, 2004
END Date: 
May, 2006

Summary Experince

Development of engineering, procurement and construction schedule, resource leveling. Establish, maintain and control schedule activities.  Total Capital InvesmentUSD 32 Million

Responsibilities as follow as;

Market Place

No results found... (try selecting a different content filter)

Syndicate content