Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Reporting

Field Researcher, University of Pretoria, Savannah Ecosystem Project

START Date: 
January, 1975
END Date: 
December, 1975

Field Researcher Savannah Ecosystem Project

Tasked with Pilot Study of Biomass Carrying Capacity of Small Mammals in the study area under supervision of Univ of Pretoria.

Responsible for planning, procurement and delivery of all reserach work in a remote location on a game reserve (closed to public).

Experience Hours (Planning & Scheduling): 
300
Experience Hours (Cost Management): 
300
Experience Hours (Forensic Analysis): 
0

Project Planner, Balfour Beatty, Eleclink

START Date: 
January, 2017
END Date: 
July, 2017

Responsible for developing and maintaining all programmes for Design, Procurement and Construction of the ElecLink Project. Provide analyses on Resources, and Schedule forecast. Creating What-if scenarios, look -aheads and breakout programmes. Ensure Planning standards are met by the Planning team.

Experience Hours (Planning & Scheduling): 
1100

Cost Engineer, AWE, Teutates

START Date: 
December, 2016

Cost Engineer

  • Check PO logs & receipt outstanding invoices
  • Attend Kick Off meetings
  • Requisitioning
  • Change control data provision & support
  • Variance analysis updates data
  • monthly reports
  • MoD dashboards
  • Data slides for meetings
  • update labour forecast
  • update ETC
  • Submit Accruals
  • Cost Reviews
  • Budgets
  • Liasing with PMs
  • Timesheet checks
  • ADI sheet submission
  • actuals submission

 

Experience Hours (Planning & Scheduling): 
1000
Experience Hours (Cost Management): 
2000
Experience Hours (Forensic Analysis): 
1000

Project Management Officer / Planning Manager, Sidel Spa, Development Projects

START Date: 
November, 2013
END Date: 
February, 2015

Role: Project Management Officer

Duties: Planning, Cost Control, Development of Project KPI and Visual Management Tools

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
1250
Experience Hours (Forensic Analysis): 
0

Pacific Region Construction Risk Manager / Senior Associate Director, Faithful & Gould, and other projects, General Mills Expansion

START Date: 
January, 2002
END Date: 
October, 2004

Western Region risk manager (Monte Carlo, Pertmaster, workshops) and owner agent (project controls, onsite representative, cost, schedule, contracts, change orders, invoices)

Experience Hours (Planning & Scheduling): 
5500
Experience Hours (Cost Management): 
5500

Deputy Director, Program Management, QS Requin Corporation, LA Valley College Bond Program

START Date: 
August, 2012
END Date: 
August, 2013

Deputy Director, Program Management, LA Valley College. Oversight of cost, schedule, project controls, cost segregation, audit. Second in command, reporting to Program Executive Director. 

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
2000
Experience Hours (Forensic Analysis): 
2000

sebior Planner, Project Management Group, DWTE (Waste to Energy)

START Date: 
October, 2015

Senior Planner, PM Group, dublin Waste to energy incinerator.

 

Interface Manager between civils contractors and process contractor. Delay event log and impact assessment from same both in impacted as planned and windows analysis. Preformance measure and EOT formulation.

Experience Hours (Planning & Scheduling): 
2600
Experience Hours (Forensic Analysis): 
1000

Senior Deputy General Manager, Lanco Infratech Limited, Chennai Metro Rail Package ECV-07

START Date: 
September, 2011
END Date: 
January, 2013
• Obtained Approval on Master Programme (Engineering, Procurement and Construction) with Planning Narrative Statement in the first submission. • Obtained Notice of No Objection(NONO) from General Consultants EMBYE on critical construction drawings to create work front for casting of wider segments, Elevated Station and Cut and Cover Tunnel structural Works • Establishment of Interface Management Plan and Traffic Management Plan • Procurement of Subcontracts for Launching Girders, Normal Segments, Wider Segment Moulds, Tunnel Ventilation System Design • Successfully Coordinated with Struct
Experience Hours (Planning & Scheduling): 
2450
Experience Hours (Cost Management): 
2000
Experience Hours (Forensic Analysis): 
1000

Construction Project Control Manager, Taka Hydrocore Indonesia, Geotechical Investigation Survey

START Date: 
February, 2016
END Date: 
April, 2017

1. As Project Control Manager of Geotechnical Investigation Company-Taka Hydrocore Indonesia

2. As Project Coordinator for geotechnical investigation vessel in Indonesian flag

Experience Hours (Planning & Scheduling): 
250
Experience Hours (Cost Management): 
3000
Experience Hours (Forensic Analysis): 
200

Construction Project Control Manager, Taka Hydrocore Indonesia, Geotechical Investigation Survey

START Date: 
February, 2016
END Date: 
April, 2017

1. As Project Control Manager of Geotechnical Investigation Company-Taka Hydrocore Indonesia

2. As Project Coordinator for geotechnical investigation vessel in Indonesian flag

Experience Hours (Planning & Scheduling): 
250
Experience Hours (Cost Management): 
3000
Experience Hours (Forensic Analysis): 
400

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content