PROJECT ENGINEER

Project Engineer, General Dynamics Electric Boat Div, SSBN726, SSN688, SSN21

START Date: 
June, 1985
END Date: 
December, 1987

Project engineering for ship systems noise and vibration control during new design, construction, commissioning, and overhaul phases.

PROJECT ENGINEER, Mediplan Sheffield, (various projects)

START Date: 
May, 2001
END Date: 
July, 2007

Working as a project Engineer for a company that supplied to both the NHS direct or played part as a sub contractor on major PFI / Group Venture projects.

Resposible for planning, resource management, stakeholder management, procurement. Managaing the project from the concept to hand over and maintenance phase.

PROJECT ENGINEER, undefined, Auditorium, Skill acquisation Center

START Date: 
October, 2006
END Date: 
December, 2012

 

Position: General Supervisor

·         Supervise project to ensure strict adherence to architectural and structural design.

·         Define the scope of work

·         Work planning and control

·         Quality control

Project Engineer, EDF, Project of Renovation of 600 MW coal units - Project Q600 – 230 000 h

START Date: 
June, 2010
END Date: 
July, 2011

ü  Participation in the technical meeting, construction, management and updating of planning

ü  CostControl, Development and update dashboards, variance analysis, forecast balance sheet

ü  Management of contract and suppliers,participation in call for tenders and negotiations, Purchasing, Organizing and conducting meetings, writing minutes of meetings

ü  DocControl, Database Management documentary project, director of the documentary base

Project Engineer, Dhafir Technologies LLC, A variety of oil and gas and EPCC projects

START Date: 
October, 2006
END Date: 
May, 2007

Responsibilities:

 

  • Managing project from conception, preproduction through completion.
  • Provide technical support to the project team.
  • Responsible for overseeing the review, initiation and execution of the contract.
  • Managing project budget and keeping costs down.
  • Responsible for the completion of all documentation.

Project Engineer, Dhafir Technologies LLC, A variety of oil and gas and EPCC projects

START Date: 
October, 2006
END Date: 
May, 2007

Responsibilities:

 

  • Managing project from conception, preproduction through completion.
  • Provide technical support to the project team.
  • Responsible for overseeing the review, initiation and execution of the contract.
  • Managing project budget and keeping costs down.
  • Responsible for the completion of all documentation.

Project Engineer, QinetiQ Consulting, Apache WAH64 Munitions Environmental Testing

START Date: 
November, 2000
END Date: 
August, 2003
  • Environmental testing of weapons and munitions systems.
  • Reviewed customer specifications.
  • Prepared & planned Project instructions using Microsoft Project.
  • Liaised with customers on a day-to-day basis.
  • Provided an up to date Project log.
  • Managed the Project progress from start to finish.
  • Led a number of Projects, at any given time, with a great amount of freedom and responsibility.
  • Regularly prepared ROM's and estimates.
  • Attended regular Project Review, Project Planning and Technical Review meetings bo

Project Engineer, Thermax Babcock and Wilcox Limited, Arasmeta Captive Power Project

START Date: 
November, 2004
END Date: 
August, 2005

Key Projects:

2 x 90 TPH Coal Fired AFBC Boilers for Arasmeta Captive Power Co. at Chattisgarh, India

 

  • Planned & Prepared schedules and worked on those time period to maintain commitments.
  • Executed assistance in procuring major systems and equipments.
  • Executed project under BAAN ERP System.
  • Prepared and reviewed PRIMAVERA schedules periodically.

PROJECT ENGINEER, Hg power transmision, Railway electrification

START Date: 
September, 2012
END Date: 
April, 2012
• Site Survey, • Project Planning , prepared work chart, Prepared Requirement List, Estimation list e.g – Cement, steel, sand, Manpower, and other electrical materials . Prepared Daily Progress Report. • Civil Mark out. • Motivate Engineer, supervisors and Labour. • Excavation Of equipments foundations • Steel fabrication for equipments foundation as per Drawing. • Foundations as per Drawing. • Co-ordination between client, sub contractors and material supplier. • Prepared Bill for subcontractors.

Project Engineer, SKYLINE BUILDERS/ MCVIN CONSTRUCTION CORPORATION, Residential

START Date: 
December, 1994
END Date: 
February, 2002

 

  • Managed and supervised execution works for small scaled residential projects valued USD 10 million leading a team and delivered on time.