Site management

Senior Planner, BCM McAlpine Ltd, King Edward VII Memorial Hospital Redevelopment Project

START Date: 
March, 2011
END Date: 
April, 2013

Relocated to Bermuda with Sir Robert McAlpine to be the Site Planner working as part of a specialist team put together to construct a new healthcare facility in Bermuda.

King Edward VII Memorial Hospital (KEMH) Hospital Wing, Hamilton, Bermuda

Experience Hours (Planning & Scheduling): 
4200

Site Manager, Wimpey Construction, Coxside Car Park Plymouth

START Date: 
February, 1994
END Date: 
April, 1995

Site Manager of multi storey concrete frame car park in Plymouth. Managemet of subcontractors and engineers. Working with planner on overall programme. Contract monitoring & short term programmes. Successful calim for extension of time.

Site Manager, Wimpey Construction, Truro College Sports Hall

START Date: 
September, 1995
END Date: 
January, 1996

Site Manager of new Sports Hall at Truro College. Managing subcontractors & site engineer.

Site Manager, Wimpey Construction, Cardiology Unit Derriford Hospital, Plymouth

START Date: 
January, 1996
END Date: 
June, 1996

Site Manager of RC frame for new Cardiology Unit at Derriford Hospital Plymouth. Managing frame contractor and site engineer.

Planning Engineer, GAS Arabian Services Co Ltd., Sales Gas PipeLine Project to PP-II, Wasit Utilities System,Core Hydrocarbon Facilities(Pipeline project)

START Date: 
May, 2009
END Date: 
June, 2011

Curremtly Working as a Planning Engineer in one of the EPC company

and doing one of the project of "Sales Gas Pipeline Project for PP-11"

As a Planner i got total 2 years of experience in Oil and Gas Sector with hands on experience in project planning and scheduling Utilities ,Pipeline and other construction Project using tools like Primavera P3 and P6 and 7(P6.7).

familiar with MS Project with fluency in MS Excel and MS Access DB.

Project Controls Engineer, Reflexion India Pvt. Ltd., Resort, Bungalows & Villas

START Date: 
June, 2003
END Date: 
May, 2006

•     Installation of all types of electrical conducting, LV Panels, MDB, SMDB, DB, and wiring for lighting circuit, power sockets outlet, isolator’s outlet, circuit breaker, FCU and thermostat outlet, socket system, building lighting, highway lighting, etc.
•     Installation and piping of automatic control system including sensors, controller, water level control system, fountain sequencing control system, telephone outlet, intercom outlet and panel, TV outlet, audio/video, camera, security systems, heat and smoke detectors.

Project Engineer, "CHARTERED ENGINEERING COMPANY,KERALA,INDIA", Towers & Multi-storied / residential / commercial buildings with project cost spanning from 3Million to 30Million AED

START Date: 
August, 2004
END Date: 
May, 2007

Involved in various multi-storied / residential / commercial buildings with project cost spanning from 3Million to 30Million AED.

>Supervision & execution of the construction works as per specifications and drawings.
>Verification of the work quantity measurements of the contractor and approve the bills for the same.
>Overall co-ordination between the contractors/subcontractors employed at the site.
>Preparation of shop drawings / addressing RFI’s .
>Render periodic reports to the Project Manager regarding project progress.