Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Anguilla (NA.AI)

Senior Planner/Scheduler, A contractor with Sirius Technical Services, Rain CII Carbon 2017 TAR

START Date: 
February, 2017
END Date: 
May, 2017

Contract Employee with Sirius Technical Services

Planning and Scheduling a Turnaround for Rain CII Carbon of Lake Charles, LA

Develpment of an EVA when last minute extra work was discovered and no schedules were submitted by the 2 refractory Subcontractors. 

Experience Hours (Planning & Scheduling): 
1050
Experience Hours (Cost Management): 
350

Senior Planner/Scheduler, A contractor with Sirius Technical Services, Rain CII Carbon 2017 TAR

START Date: 
February, 2017
END Date: 
May, 2017

Contract Employee with Sirius Technical Services

Planning and Scheduling a Turnaround for Rain CII Carbon of Lake Charles, LA

Develpment of an EVA when last minute extra work was discovered and no schedules were submitted by the 2 refractory Subcontractors. 

Experience Hours (Planning & Scheduling): 
1050
Experience Hours (Cost Management): 
350

Senior Planer & Cost Control, Wood Group Mustang, capital improvement and Turnaround

START Date: 
February, 2007
END Date: 
June, 2017

Various Project Controls positions ECP projects mainly in the petrochemical sector

Experience Hours (Planning & Scheduling): 
19550
Experience Hours (Cost Management): 
18100

Mike Sullivan

First Name: 
Mike
Last Name: 
Sullivan

Executive Scheduler with Gilbane Building Co

Professional Since: 
Jun-1980 (43.9 yrs experience)
Years Experience: 
0

Senior Project Controls Manager, GE, Utilities

START Date: 
January, 1998
END Date: 
January, 2001

►     General Electric, Houston TX , 1998 to 2001 (LS Projects)

Project Manager. Profit/loss responsibility and had oversight/management responsibility in design, fabrication, construction, TA and startup of power plants. Projects delivered in Oklahoma, New Jersey, Texas, Brazil, Colombia, Uruguay, and Panama. Representative projects:

Project Engineer, Scheduler, McCarthy Building Companies, Solar and Commercial

START Date: 
August, 2016
  • Designed, planned, optimized, managed, and provided in-field and engineering support for self-perform post install for over 100,000 posts on a 130MW solar project
  • Developed an accurate, visual, and numerical tracking method to help monitor and plan entire jobsite.
  • Worked with contracts and managed subcontractors work, cost issues, change orders, and schedule.
  • Maintained and documented any design changes and as-built installs.
  • Provided input and helped develop methods to ensure office and field goals were aligned by providing more immediate feedback and p
Experience Hours (Planning & Scheduling): 
500
Experience Hours (Cost Management): 
500
Experience Hours (Forensic Analysis): 
200

Paul Allen

First Name: 
Paul
Last Name: 
Allen

2012-2016-Worked on oil and gas drilling projects

2016-2017-Worked on construction projects (solar & commercial)

Used excel/project/primavera during this time.

Professional Since: 
Jun-2012 (11.9 yrs experience)
Oldest experience: 
Jun 2012 (11.9 yrs experience)
Years Experience: 
4
Guild Accreditation: 
Awaiting Applicant

Drilling Engineer, DEVON, A variety of oil and gas and engineering projects.

START Date: 
June, 2012
END Date: 
April, 2016
  • Responsible for planning, costing, scheduling, operating, troubleshooting and supervising of the drilling of $2-$6+ million onshore vertical and horizontal oil and gas wells; Watched up to three rigs at a time in the Midland and Delaware Basin shales in over 10 counties; Well Control Certified
  • Developed individual operational procedures and designs, optimizing cost and technical parameters based on experience, available equipment, and engineered material
  • Performed regular safety checks, empowered contractors and field hands to stop the job, wrote safety specific job pro
Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
500

Tom Morgan

First Name: 
Tom
Last Name: 
Morgan

I was voluntold i would learn to schdule to help fill a void back in 2014. Had some background in college but professor left alot to be desired. Have been planning & Scheduling since 2014 in Oil, Gas, Chemical, Mining, & infrastructure ever since. 

Professional Since: 
Aug-2012 (11.7 yrs experience)
Years Experience: 
0

Edward C Kochevar

First Name: 
Edward C
Last Name: 
Kochevar

·         Schedule Delay Analysis using Windows analysis method for contemporaneous project schedule based on P6, Sure track and MS Project.

Professional Since: 
Jan-1990 (34.3 yrs experience)
Years Experience: 
0

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content