Asta Powerproject

Hide Activities in Asta

Any Asta expert can tell me the tips that how to hide the specific activities in Asta? I used these options to hide the specific activities.
Hide and show the toolbar and Mark for hiding
but no result.
Any idea?


Powerproject feedback

Hi,

I’m Andrew Willard and I am a Director of Asta Developmnent, creators of Asta Powerproject. I’ve worked for Asta for 17 years so have an in depth knowledge of the product and how it has been used in many construction and engineering projects around the world.

Asta Powerproject Users Group Forum (Australia)

There is to be an Asta Power Project Users Group Forum to he held at the offices of Solid Support, 6A Leeds Street, Rhodes, Thursday 19 November 2009, 9:00 am.

Webinars for other states will be held during 19 - 20th November 2009.

For further information, make contact with Graham Dix at grahamd@solidsupport.com.au (or 0415 381 758)

Help on drawing bars

Please can someone help?

I am having trouble trying to draw bars the length I want them. I have a worksheet set up with the following in the date zone area Month, Day (1-31) and Time (Hours mins).

I am trying to make a bar go from 11:00 - 13:30 but will only let me do it either 11:00-13:00 or 11:00-14:00, it wont let me do it half way.

How do i draw a bar with half hours on them please?

Wizard......


No, not the 70’s Glam Rock quartet, but the new project Wizard on PP !

When I try to start a new project with the wizard, or indeed in any way, I select the template fill in the boxes for File location, Name, for, Start, By, User name etc, and click OK, but nothing happens.

I am forced to open existing project and alter them to create a new project.

What am I doing wrong?

Thanks


Opening and closing a summary heading

Hi all,

Is there an easier way of opening and closing a single summary heading than double clicking the summary bar on the Gantt chart? The "Show to x Levels" is also available but that applies to all summary headings and not a single one (or a few).

It would be logic that the "+" and "-" in the column just left of the "Line"-column opened and closed a summary like most other planning systems, but it don’t - or maybe I just have some wrong settings?

Any tricks / short cuts for this available out there?


Best regards,

Bo

Sorting Code libraries

I’ve noticed the code libraries include a sort order field. I exported my P3 schedule to Power Project in order to learn PP. The contract view all stakeholders are used to, displays milestones at the top, under a "milestones" heading, then some excavation works then heavy civils and construction roads at the bottom, each under its own heading. I tried to sort them in the same way they were sorted in P3, but PP seems to sort them alphabetically. How can I override the alphabetical order of the code libraries to sort the sub headings in the way they were signed in the contract?

PowerProject in the USA

I heard that Asta has a reseller and support in the USA now (www.capmc.net). Is there any users in this forum from the USA?

PowerProject Online Collaboration

Does the PowerProject program have online collaboration capabilities? And if so, how is it hosted?

1st time using Asta PowerProject -Any tips?

I’ll be donig a baseline review in a week or so using APP. I’ve used the free Asta Project Viewer before, but not the full package.
As I won’t have much time to play with the software before I sue it in anger, any tips / key differences vs Primavera / things to look out for / etc from the experienced users on this esteemed forum would be most welcome.

Ta muchly,

G