Senior Planner

Senior Planner, Tripatra Engineering, EPC & FEED Project

START Date: 
October, 2013
END Date: 
December, 2013

- Develop WBS and cost estimation for owner estimate EPC Bid Package

- Evaluate contingency requirements

- Integrated project progress, cost performance, and cost forecast report

- Cost monitoring and reporting system in FEED Project

- Develop, maintain, and control integrated schedule FEED with P6 and Ms. Project

Experience Hours (Cost Management): 
500

Senior Planner, Amey, ASC 6&8

START Date: 
February, 2015

Senior Planner for ASC 6&8 Framework. Previously worked for Barhale plc in the @one Alliance for Anglian Water.

Senior Planner, Aurizon/QR National/Queensland Rail, Asset Maintenance Planning

START Date: 
November, 2007
END Date: 
May, 2012

I planned maintenance and project works for staff from the Asset Maintenance Operations South Group covering the Blackwater and Moura Coal Sysytems.  I was a member of the team planning regular zone closures (shutdowns) for all Below-Rail assets (civil, signalling, overhead electrical and project works).

 

Aurizon used Primavera P6 as the planning and scheduling tool.

Experience Hours (Planning & Scheduling): 
8000

Senior Planner, Morrison Construction Civil Engineering Scotland, Moray Flood Alleviation Framework

START Date: 
January, 2009
END Date: 
November, 2014

Senior Planner, Morrison Construction, North Scotland

Moray Flood Alleviation Scheme: Elgin FAS, River Findhorn & Pilmuir FAS (Forres), Rothes FAS, Burn of Mosset FAS. Laggan Tormore Gas Processing Plant, Shetland Bid.

Senior Planner, Atkins Rail, GWEP

START Date: 
May, 2014
END Date: 
November, 2014

Senior Planner, developing engineering programmes, monitoring progress, submitting applications, developing claims.

Experience Hours (Planning & Scheduling): 
400
Experience Hours (Cost Management): 
400
Experience Hours (Forensic Analysis): 
200

Senior Planner, Costain International, Pyramids Hospital; ENPPI HQ

START Date: 
July, 1986
END Date: 
July, 1988

Senior Planner on new Pyramids Hospital Project in Cairo, Egypt and new ENPPI HQ Project Cairo, Egypt. Responsible for project planning and progress reporting.

Experience Hours (Planning & Scheduling): 
4000

Senior Planner, Wimpey International, Multiple projects

START Date: 
April, 1978
END Date: 
June, 1986

Planner / Senior Planner working in Dubai (78-80) on Dubai Aluminium Smelter.

Senior Planner in Oman (80-86). Projects included: Power Station civils, military barracks, hospital, copper mine civils, housing, highways, heritage restorations.

Experience Hours (Planning & Scheduling): 
16000

Senior Planner, Parsons Brinckerhoff, Manchester Metrolink Phase 3 Bid

START Date: 
February, 2007
END Date: 
January, 2008

Appointed to work on Manchester Metro Link project and control costs.   

Report to Head of Portfolio Management – North.

Working on various heavy rail refurbishment contracts from £30k to £100k.

Preparation of plan involving personnel and equipment required in preparing Bid/Tender documentation.

Seconded to GMPTE for 10 months on £102m light rail enhancement contract while they tried to fill vacancy.

Ongoing planning/costing involvement on £220m phase 3 contract for GMPTE light rail extension project.

Experience Hours (Planning & Scheduling): 
2100

Senior Planner, Bethall Rail Ltd, Points Heating programme

START Date: 
September, 2008
END Date: 
April, 2010

Reporting to the Operations Manager, working on Points Heating Survey and Design contracts, platform upgrade, 11kv contracts including the building of sub stations as well as junction lighting contracts.

Preparation of plan from Design documents and Construction drawings.

Updating plans and reports on a weekly basis.

Experience Hours (Planning & Scheduling): 
750

Senior Planner, COLAS RAIL, HABD Design

START Date: 
April, 2010
END Date: 
October, 2011

 

Working on HABD Design contract, and Kent & Sussex Platform lengthening.

Preparation of P6 resource loaded programme from out of date P3e information

Updating of plan on a weekly basis and completion of weekly reports.

Preparation of worksheet for each resource

Experience Hours (Planning & Scheduling): 
2000