Engineering / Project Planning Lead, Fluor Daniel - Philippines, Habshan 5 Bid Proposal and Advance Engineering Project

START Date: 
April, 2008
END Date: 
April, 2009

Leads the Project Controls group for the entire project that provides project control functions for the Proposal Bid and Advance Engineering of Habshan 5 Project which includes but not limited to:

 

§  Development of pre-award proposal schedule in summary and detail.

§  Planning and scheduling of Engineering activities and deliverables.

§  Facilitate change management process.

Planning and Scheduling Engineer, Chiyoda Corporation, QCS Project Construction of Train-6 & 7

START Date: 
June, 2007
END Date: 
April, 2008

Construction Planning & Scheduling Engineer for the Project Director of the entire joint venture project. Provides construction planning support to the project management team which includes but not limited to:

 

§  Monitor and evaluate subcontractor’s level-4 schedule.

§  Conduct periodic feasibility study to determine the schedule’s discrepancies to Chiyoda’s standards.

P6 Planner, Carillion, and Others, Great Eastern Overhead Line Renewals, North London Line Railway Investment Project

START Date: 
January, 2009
END Date: 
May, 2011

 

January 2009 – May 2011 - P6 Planner – Carillion Rail – Signalling, Power and Coms

Based in Crewe and London.  Carillion has over 40,000 employees and an order book over £10bn

Assistant Manager - Project Controls, PT. Yasa Industri Nusantara, IFB II PGN Project Package

START Date: 
January, 2007
END Date: 
May, 2011
  • Prepare Project Master Schedule
  • Tracking Project Schedule (Daily)
  • Control Project Execution
  • Prepare Material Shipment Plan
  • Prepare Progress Report (Weekly & Monthly)
  • Analyze Problem & Prepare Corrective Action

Assistant Manager - Project Controls, PT. ZUG Industry Indonesia, Sintang Coal Fired Steam Power Plant

START Date: 
June, 2011
END Date: 
December, 2011
  • Prepare Project Master Schedule
  • Tracking Project Schedule (Daily)
  • Control Project Execution
  • Prepare Material Shipment Plan
  • Prepare Progress Report (Weekly & Monthly)
  • Analyze Problem & Prepare Corrective Action

Asst.Manager - Project controls, PT. Wiratman & Associates, Tapin Coal Terminal Project

START Date: 
January, 2012
  • Prepare Project Master Schedule
  • Tracking Project Schedule (Daily)
  • Control Project Execution
  • Prepare Material Shipment Plan
  • Prepare Progress Report (Weekly & Monthly)
  • Analyze Problem & Prepare Corrective Action

Planning and Project Control Engineer, Eiffage Construction Metallique Company, Ofon Phase II Project

START Date: 
January, 2008

Summary of Qualification

Senior Manufacturing Engineer, Western Digital, WDC Puerto Rico

START Date: 
January, 1986
END Date: 
July, 1986

Electronics Manufacturing Factory Fit-out.

Planned and executed the installation of semi-automatic production line for PCB assembly and test.

This project was 6 months in planning followed by 3 weeks on-site installation and commissioning in a previously used but empty 60,000sq.ft. factory in Puerto Rico. 

SENIOR PLANNER, Dragados, Technical Department

START Date: 
February, 1990
END Date: 
May, 2012

COMPANY: DRAGADOS
DEPT.: Technical Management. Methods and Organization of

Consultant, Safran Software Solutions, Various

START Date: 
May, 2012

Working as a staff consultant for Safran Software Solutions AS, based in Norway.