Project Control Engineer

Project Control Engineer, RWS Corporation, Iroquois Gas Transmission System

START Date: 
April, 2003
END Date: 
September, 2003

Prepared baseline schedule, monitored, analized and repoerted on a cost/resource loaded CPM schedule using SureTrak 3.1 for Iroquois Gas Transmission System. Prepared As-Planned vs. As-Built Schedule Analysis, charts and graphics.

Project Control Engineer, Iraq Power Alliance, Iraq Power Generation, Distribution and Transmission Projects

START Date: 
January, 2005
END Date: 
September, 2005

PCO Electrical Sector Program(Completed 2006), Baghdad, Iraq: As Project Control Engineer for Iraq Power Alliance (joint venture between Parsons Brinckerhoff and Parsons E and C), developed baseline schedules and provided planning and analysis expertise for 444 generation, distribution, and transmission projects throughout Iraq with total budget of $2.4B encompassing more than 17K activities.

Project Control Engineer, Praxair India Pvt ltd, Cryogenic Air Separation Plants

START Date: 
July, 2006
END Date: 
July, 2008

Key Projects:

- 900 TPD Air Separation Unit for SAIL, Durgapur, India – Aug 2006 ~ Jun 2008­­

 

  • Responsible for Schedule and Cost Control.
  • Estimated and presented cost at various stages of projects.
  • Responsible for submission of various reports for monthly portfolio review of the project including Cashflow, S-curves, CPI/SPI curve, Contingency draw down curve, float analysis and Risk and Opportunities
  • Prepared and tracked schedule and cost in MS Project & Artemis.
  • Prepar

Project Control Engineer, ADMA-OPCO (ABUDHABI MARINE OPERATING CO, Zakum Oil Pipeline Repalcement project

START Date: 
September, 2012

 

ABU DHABIMARINE OPERATING COMPANY (ADMA-OPCO), ABU DHABI, UAE

(Jan 2012– to date)       Lead Project Control Engineer

Abu Dhabi Marine Operating Company, ADMA-OPCO is a ADNOC Group of company, major producer of oil and gas from the offshore areas of the Emirate of Abu Dhabi.

PROJECT CONTROL ENGINEER, FRIGSTAD OFFSHORE MARINE (CYPRUS) PTE LTD, KAN TAN IV OIL RIG PROJECT

START Date: 
November, 2011

Directly reporting & supports the Project Manager in control and management of the project progress.

• Responsible for the development and preparation of Project Master Schedule Plan details a

Project Control Engineer, SIMontaggi SRL - Romanian Subsidiary os SIM SpA, - Above Ground Gas Processing Facility Prj -TECHNIP GERMANY GmbH - AMEC & EKB / VIKING Gr – Germany, - CCGT Moerdjik 2 Power Plant Project – TECNICAS REUNIDAS, CBI LUMMUS & ESSEN

START Date: 
September, 2008
END Date: 
July, 2011

.  PROJECT CONTROL ENGINEER – Project Accounting, Cost Controlling & Contract Administration

     2008 / 09 – 2011 / 07

     SC SIMontaggi SRL – Industrial Construction     SC SIMontaggi SRL is the Romanian subsidiary of SIM SPA Italy company. SIM SPA Italy is a privately owned mechanical construction company, specialized in the fabrication and erection of piping, structural steel, tanks and installation of rotating / static equipment and associated hoisting activities.

Project Control Engineer, Prima Borneo Sumberdaya, Various Coal Mining Projects

START Date: 
January, 2005
END Date: 
February, 2006

Responsible for any aspects in Project Control. Handling various coam mining projects: jettys, conveyors, power plants, boilers etc.

Project Control Engineer, Technip, Sisi Nubi Field Development– Phase 1, Onshore Facilities for Gendalo Field Development, Sadewa-Z WHP and Pipelines, Onshore Facilities for Gehem Field Development (Indonesia)

START Date: 
December, 2003
END Date: 
May, 2006

Established the project setup (project coordination plan, project quality plan, schedule, and budget incl. CTR – Cost, Time & Resources); monitored and rectified the implementation (recovery plan, daily / weekly / monthly report, MOM, supervising document controllers); compiled technical documents, such as Scope of Work and Basis of Design; and handled commercial matters of the project (cost report, change order, level-4 cost estimate, and invoicing)

Project Control Engineer, Odebrecht Construction Inc., Tripoli International Airport-Terminal Building Project

START Date: 
January, 2011

Change Management / Variation Management, Primavera Contract Manager (PCM) imeplementation and system development

Project Control Engineer, United Utilities, Various AMP4 Capex & Opex

START Date: 
June, 2000
END Date: 
June, 2007

Project Controller on Various AMP 4 programmes of work including Water and Waste water infrastructure rehabilitatiion and capital projects. 