Project Planner

Project Planner, Vattenfall, South Kyle

START Date: 
November, 2017

Project Planning and Controls, for Tender, Design, Procurement, Installation, Commissioning, Operation and Maintainance

Project Planner, AWE Plc, Manufacturing & Production

START Date: 
January, 2015

Project Planner

Provide and manage project plans based on company work breakdown structure and project scope, within a project control function.

Manage schedules on projects to optimise resource and finance allocation.

Analyse performance and trends to assist with project forecast development.

Conduct CPA (Critical Path Analysis) and integrate risk mitigation actions.

Assign resources to tasks.

Experience Hours (Planning & Scheduling): 
6000
Experience Hours (Cost Management): 
500

Project Planner, Eskom Rotek Industries, Coal Fired Generating Stations - Major Outages

START Date: 
October, 2017
END Date: 
March, 2012

·      Development of calcsheet cost estimates.

·      Develop detailed task lists and work effort assessment.

·      Prepare short and long-term resource allocation plans based on input from all key players and team members.

Experience Hours (Planning & Scheduling): 
15100
Experience Hours (Cost Management): 
8700

Project Planner, ARCADIS, CP5

START Date: 
February, 2015
END Date: 
August, 2016

Working for Arcadis and placed with Network Rail working on the CP5 renewal projects grip stages 1-8 between St Pancras and Sheffield using the NEC contracts.

Experience Hours (Planning & Scheduling): 
3000

Project Planner, Balfour Beatty, Eleclink

START Date: 
January, 2017
END Date: 
July, 2017

Responsible for developing and maintaining all programmes for Design, Procurement and Construction of the ElecLink Project. Provide analyses on Resources, and Schedule forecast. Creating What-if scenarios, look -aheads and breakout programmes. Ensure Planning standards are met by the Planning team.

Experience Hours (Planning & Scheduling): 
1100

Project Planner, ABB, Rampion

START Date: 
June, 2016
END Date: 
December, 2016

Responsible for developing and maintaining all schedules for the construction of the Onshore Substation Buildings, Civils infrastructure, M&E Installation and Commissioning.Assess Contractor progress and produce a Progress Report. Ensure Planning standards are met by the Contractor. Creating What-if scenarios and breakout programmes.

Experience Hours (Planning & Scheduling): 
1000

Project Planner, Aveng G-LTA, Sasol 1 Wax expansion Projects

START Date: 
March, 2016
END Date: 
November, 2016

POSITION:PROJECT PLANNER

 

KEY RESPONSIBILITIES:(at Sasol 1 Refinery)

·      daily verifications

·      weekly updates

·      s-curves (manpower)

·      s-curves (kpi)

Project Planner, Balfour Beatty Rail, Balfour Beatty Rail ROMANIA, Rehabilitation of the railway Pan-European 4th Corridor, Client: CFR S.A. Romania

START Date: 
September, 2006
END Date: 
March, 2007

Project Planner, Balfour Beatty Rail
Project: Rehabilitation of the railway Pan-European 4th Corridor, Client: CFR S.A. Romania

Experience Hours (Planning & Scheduling): 
1050
Experience Hours (Cost Management): 
300
Experience Hours (Forensic Analysis): 
50

Project Planner, Arendal, Ultra Low Sulfur Diesel

START Date: 
October, 2014
END Date: 
October, 2016

I got my first job in the project controls department of an Oil & Gas construction company in 2014

By 2016 I was a project planner for a major refining project in Salina Cruz, Mexico

Responsibilities included  the development of WBS, manpower histograms, s curves, monitoring progress, allocating budgeted resources on schedule using P6, progress reporting, etc

Experience Hours (Planning & Scheduling): 
4800
Experience Hours (Cost Management): 
1700

Project Planner, Keppel Verolme Rotterdam, Paul B Loyd

START Date: 
August, 2015
END Date: 
December, 2015
Establishing a resource loaded schedule for the refit of the Paul B Loyd semi sub drilling rig. Consulting internal and external clients to contain the deadline. Reporting progress report Inc. S-curve and schedule.
Experience Hours (Planning & Scheduling): 
900