PLANNING MANAGER, VinaProjects Ltd. (Vietnam), Construction of the Danang Ocean Villas and Golf Resort Project (Danang, Vietnam)

START Date: 
January, 2010
END Date: 
October, 2011
  • Summarize projects status upstream to senior management, highlighting any unresolved major risks and potential overruns
  • To operate a project controls system in accordance with the planning procedures, providing a consistently high level of service.
  • In charge of pre and post contract construction planning works.
  • Assisting with design and  activities relating to the program
  • Informing projects management on potential impacts of changes
  • Analyze Contractor programmes and report procedures

PLANNING MANAGER, VinaProjects Ltd. (Vietnam), Construction of the Danang Ocean Villas and Golf Resort Project (Danang, Vietnam)

START Date: 
January, 2010
END Date: 
October, 2011
  • Summarize projects status upstream to senior management, highlighting any unresolved major risks and potential overruns
  • To operate a project controls system in accordance with the planning procedures, providing a consistently high level of service.
  • In charge of pre and post contract construction planning works.
  • Assisting with design and  activities relating to the program
  • Informing projects management on potential impacts of changes
  • Analyze Contractor programmes and report procedures

Application Specialist, KKAH, Design software

START Date: 
January, 1990
END Date: 
December, 1990

Application Specialist - supported implementation of design software and training

Experience Hours (Planning & Scheduling): 
1800
Experience Hours (Cost Management): 
200
Experience Hours (Forensic Analysis): 
200

Associate Planner Scheduler, Versar, Inc., AFCEC PBR projects

START Date: 
October, 2012
END Date: 
June, 2013

Provided monthly schedule reporting using Microsoft Project for 2 multi-year projects valued $25-$45M, prepared revenue projection spreadsheets, Milestone Payment Schedules, and graphs. (Versar Contract work for AFCEC (Air Force Civil Engineer Center)). 

Experience Hours (Planning & Scheduling): 
900
Experience Hours (Cost Management): 
200
Experience Hours (Forensic Analysis): 
100

Oil & Gas Senior Planning Engineers - Primavera, Amecfosterwheeler Thailand, Sriracha Umbrella Project

START Date: 
April, 2012

2012 to Present Senior Planning Engineer Foster Wheeler (Thailand) Limited :
SUP Sriracha Umbrella (9m USD)
SBOU Sriracha Biological Oxidation Unit Project (26m USD)
Project , Esso Sriracha Refinery Co.,Ltd

• Project Shutdown Planner , preparation all job pack include for shutdown project.
• Establish and manage planning and control system and in developing and updating master plans across all areas of the project.(Level 1,2,3 and 4)

Experience Hours (Planning & Scheduling): 
8000

Planning Engineer, Doosan Babcock, Various Maintenance Projects

START Date: 
October, 2008
END Date: 
January, 2009

 

Oct 2008 – Jan 2009

Doosan Power Systems (Doosan Babcock)

Trainee Planning Engineer – Cockenzie PS

Key Responsibilities:

  • Using Microsoft Project 2003 to create project plans
  • Selecting the appropriate techniques and sequences

Planner/Coordinator/Site Manager, Durkan Ltd, Thomas rd

START Date: 
June, 2000

I am a capable Site manager that has worked on a number of projects ranging from small hostel refurbishment £700k  to new build projects involving multi purpose use for social housing up to£25 million across london.

I have worked on the following

London lighthouse creating additional dwellings and kitchen facility

Ada place social housing 34flats and 15 houses which involved cutting into and creating new docking point in the Hackney Canal

Willesden lane Hostel grade 2 listed centre for battered women

Project Engineer - Planning, Simplex Infrastructures Limited, Residential Buildings (2B+G+42)

START Date: 
August, 2009

* Preparation of BMCP (Baseline Master Construction Programme) on Primavera project planner & Microsoft Project.
* Scheduling, Tracking & Updating BMCP (Baseline Construction Programme) on required basis.
* Revisioning and Re-scheduling of Master plan as per the management requirements.
* Preparing critical procurement schedules PMV Schedule & Formwork schedule in conjunction with /Baseline master construction programme/Master Construction Programme.
* Focusing critical areas and highlighting the management to avoid further delays in periodic progress review meetings

Assistant Planning Engineer, Larsen & Toubro - ECC Division, Multi-story Residential Building

START Date: 
July, 2010

Working as a Planning Engineer for a Residential Project in Mumbai.Job Involves mainly Schedule Preparation,Monitoring,Invoicing targets,Productivity calculations and other miscellaneous works.