Senior Construction Planner, Royal Construction Company Ltd, Residential (High Rise) / Housing Projects

START Date: 
May, 2015
END Date: 
June, 2017

Snr. CONSTRUCTION PLANNER          ($150m to $800m)              Royal Construction Company Ltd          May 18 – Jun 19

Experience Hours (Planning & Scheduling): 
40000
Experience Hours (Cost Management): 
40000
Experience Hours (Forensic Analysis): 
40000

Senior Planner / Senior Tender Planner, Balfour Beatty Ltd, Manchester City Football Academy / Oxford Shopping Center / Crampsfield Detention Center

START Date: 
June, 2014
END Date: 
April, 2015

Snr. Planner / Senior Tender Planner                              Balfour Beatty Ltd, UK www.balfourbeatty.com    Jun 2014 – Apr 2015

Experience Hours (Planning & Scheduling): 
40000
Experience Hours (Cost Management): 
40000
Experience Hours (Forensic Analysis): 
40000

Senior Planning Engineer, Thales Communications & Security (Hong Kong), C759 (KTE), C762 (SIL, KTE), MTR Contract Nos. C966 (SIL)

START Date: 
July, 2013
END Date: 
November, 2016
  • Preparation of Programmes and other schedule control systems required by Client prior to project construction.
  • Manage the progress updating of this reports  on a regular period as required by the Client
  • Prepare the Planning Sections of the PM Report to the Client
  • Provide support on tender preparation and submission.

Senior Planning, Thales Communications & Security (Hong Kong), MTR Contract Nos. C966 (SIL), C759 (KTE), C762 (SIL, KTE)

START Date: 
July, 2013
END Date: 
November, 2016
  • Preparation of Programmes and other schedule control systems required by Client prior to project construction.
  • Manage the progress updating of this reports  on a regular period as required by the Client
  • Prepare the Planning Sections of the PM Report to the Client
  • Provide support on tender preparation and submission.

Senior Planning Engineer, HSIN CHONG CONSTRUCTION (MACAU) LTD., Galaxy Resort and Casino – Phase 2

START Date: 
July, 2013
END Date: 
March, 2014
  • Management of the progress measurement system and the reporting set-up for the MEP Works’ Planning and Programme Management scope of the project.
  • See to it that these planning systems are implemented by the various MEP Sub-contractors.
  • Assist the MEP Sub-contractors so that they fully understand the planning methods and their progress reporting are concise and reliable.
  • Submit the required Reports to the Client’s MEP Planning Manager and establish close coordination with him to ensure that MEP Works are monitored and finished based on old or the new re-baselined

Lead/Senior Planning Engineer, Gammon Construction Ltd (Hong Kong), Construction of the Standard Chartered Bank Building, A&A Works for the Hong Kong Jockey Club’s Happy Valley Racecourse

START Date: 
October, 2011
END Date: 
July, 2013
  • As Contractor’s Planner, I provide Baseline management, resource loading and analysis, progress update and cash flow integration based on earned value methods.
  • Review overall project status with the Project Management team and recommend corrective action where necessary.
  • Provide support on tender preparation and submission at Head Office.
  • Liaison with the claims team to ensure all contractual matters are maintained and protected.
  • As planner of the PM Team for the project I establish and define any job oriented project control procedures and identify the

Planning Engineer, Pranavam constructions, EPC for Grasim VSF Plant

START Date: 
December, 2012
END Date: 
March, 2015

• Developing the Project Planning Package based on the client requirements which includes Work Breakdown Structure (WBS) and WBS Weightage, Baseline Schedu

Experience Hours (Planning & Scheduling): 
8000
Experience Hours (Cost Management): 
7500
Experience Hours (Forensic Analysis): 
3800

Senior Planning Engineer / Project Control Lead, BL Energy, Alba Potline 6 Compressor Substation

START Date: 
March, 2017
END Date: 
March, 2019

Based in Bahrain. Project control of the Alba Potline 6 Project and working on various PMC, EPC and EPCM tenders. Responsibilities include creation of Level 1, 2 & 3 Schedules using Primavera P6 Professional, covering Engineering, Procurement, Construction and Commissioning, Level 4 databases. Preparation of the project control documents (dashboards, milestones plan, project summary schedules, manpower histograms, progress curves and weekly / monthly reporting).Administration of the time sheet system. Liaison with the client, management, project, engineering and contractor’s teams.

Experience Hours (Planning & Scheduling): 
4000
Experience Hours (Cost Management): 
200

Construction Interface planner, Fluor UK, TCO – FGP – WPMP (Wellhead Pressure Management Project)

START Date: 
November, 2016
END Date: 
April, 2017
This role is to coordinate and maintain the engineering Construction Interface tracker which is the main multi discipline focal point document for the engineering team in Farnborough, Almaty and Houston with the construction site in Tengiz, Kazakhstan. To maintain good communication between all WBS areas, existing area meetings were enhansed with additional meetings so that the tracker was up to date and all changes visable for discussion in the weekly review meeting by management and lead engineers.  Any slippages within the multiple P6 schedules had to be challenged by liaising

Project Planner, Kier Construction, BEPPs and DIF at Sellafield

START Date: 
November, 2015
END Date: 
July, 2016

Repoted to Project Manager

Implemented 4D timeline during daily task briefing

Responsible for maiantaining accepted programmes, weekly and monthly updates, and project controls on Sellafield with monthly reporting, baseline tracking, period performance

Accountable for development of sequences including temporary works, production of histograms and cash flow , as well as planning time frames

Experience Hours (Planning & Scheduling): 
1400
Experience Hours (Cost Management): 
200

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher and PMI accredited REP. Teach yourself using on-line or book based learning or run your own in-house or public PMI accredited courses.
For 25+ years, APMX has been providing competency based project management training to Fortune 500 companies around the world, applying the principles of project based learning, designed to produce measurable results, generating a favorable “return on training investment”.
See how the TIME - LOCATION - VIEW brings clearness to your work programmes
Syndicate content