Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Lead/Senior Planning Engineer

Lead/Senior Planning Engineer, Petron Engineering Construction Ltd., PETROCHEMICAL COMPLEX-II

START Date: 
April, 2012
END Date: 
November, 2014

2012 - 2014                   GAIL “PETROCHEMICAL COMPLEX-II”

  • EPC basis Erection of Cracker Furnace Package and Composite Works for Gas Cracker Unit for Petrochemical Complex – II, Gas Authority of India Limited, Uttar Pradesh, India.

Mainactivities:

Experience Hours (Planning & Scheduling): 
4050
Experience Hours (Cost Management): 
1800
Experience Hours (Forensic Analysis): 
1200

Lead/Senior Planning Engineer, Confidential , Bus rapid Transit

START Date: 
June, 2019
Planning, Scheduling, Monitoring & Reporting: Studying contract documents and scope, generation of the proposed WBS and activity list based onthe required (or suitable) level of details. Studying the logical and strategic sequence of work Breakdown of cost-related data to generate the cash flow charts based on BOQ and schedule ofworks. Preparing related narrative reports for the submitted schedules. Collecting the actual site data for updating and monitoring Establish simple document manageme
Experience Hours (Planning & Scheduling): 
1000
Experience Hours (Cost Management): 
500
Experience Hours (Forensic Analysis): 
250

Lead/Senior Planning Engineer, Leonardo, Al Bayt Stadium Project – 60,000 capacity : FIFA Stadium Project for World Cup 2022

START Date: 
July, 2017

Senior Planning Engineer

• Al Bayt Stadium Project – 60,000 capacity : FIFA Stadium Project for World Cup 2022 – Al Khor, Qatar – MEP, Electrical – MV, LV, ELV systems & ICT system – Review of LOD300, preparation of LOD400 & LOD500, Procurement, Installation, Testing, Commissioning & Handover

Lead/Senior Planning Engineer, Leonardo, Al Bayt Stadium Project – 60,000 capacity : FIFA Stadium Project for World Cup 2022

START Date: 
July, 2017

Senior Planning Engineer

• Al Bayt Stadium Project – 60,000 capacity : FIFA Stadium Project for World Cup 2022 – Al Khor, Qatar – MEP, Electrical – MV, LV, ELV systems & ICT system – Review of LOD300, preparation of LOD400 & LOD500, Procurement, Installation, Testing, Commissioning & Handover

Lead/Senior Planning Engineer, Maire Tecnimont, ZCINA-TRAN 4

START Date: 
August, 2019

Senior Planning engineer 

Project : ZCINA TRAN 4 Construction 

Location : Algeria 

Cleint : SONATRACH

Industrie :OIL & GAz

Lead/Senior Planning Engineer, Maire Tecnimont, ZCINA-TRAN 4

START Date: 
August, 2019

Senior Planning engineer 

Project : ZCINA TRAN 4 Construction 

Location : Algeria 

Cleint : SONATRACH

Industrie :OIL & GAz

Lead/Senior Planning Engineer, Bluewater, and different buoy loading/unloading Projects, Bluewater FPSO Modification, Water Technology

START Date: 
June, 2013
END Date: 
September, 2017

-       Review of hand-over documents and develop detailed project schedules and performance baselines

Experience Hours (Planning & Scheduling): 
8200
Experience Hours (Cost Management): 
0
Experience Hours (Forensic Analysis): 
0

Lead/Senior Planning Engineer, Gammon Construction Ltd (Hong Kong), Construction of the Standard Chartered Bank Building, A&A Works for the Hong Kong Jockey Club’s Happy Valley Racecourse

START Date: 
October, 2011
END Date: 
July, 2013
  • As Contractor’s Planner, I provide Baseline management, resource loading and analysis, progress update and cash flow integration based on earned value methods.
  • Review overall project status with the Project Management team and recommend corrective action where necessary.
  • Provide support on tender preparation and submission at Head Office.
  • Liaison with the claims team to ensure all contractual matters are maintained and protected.
  • As planner of the PM Team for the project I establish and define any job oriented project control procedures and identify the

Lead/Senior Planning Engineer, JACOBS Zate, FEED & Detailed Designs for Major projects

START Date: 
August, 2015
  • Plan and schedule projects by developing a project master schedule in line with the requirements using PRIMAVERA.
  • Make high satisfaction from client by giving all requirement in scheduling forecast with high expectation.
  • Develop WBS for new projects for full scopes.
  • Analyze the project manpower load required for plan recruitment people or subcontracting activities to ensure the project delivery.
  • Perform weekly performance report, analyzing disciplines states to monitor project delivery and performance.
  • Managing in Weekly basis the schedule for an
Experience Hours (Planning & Scheduling): 
6650
Experience Hours (Cost Management): 
600
Experience Hours (Forensic Analysis): 
1750

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content