Technical Office Engineer

Technical Office Engineer, Elsewedy Electric, , Erbil 11, 33, 132 kv substations – Iraq, Metu – Gambela 230 kV power transmission project – Ethiopia, 33/11 KV Substation Indoor & Outdoor – Ghana, Design, Supply and Installation of Substations & Lines – K

START Date: 
February, 2009
END Date: 
February, 2010

Worked in studying the following projects:

 

Pyramids Industrial Parks (PIP) - Egypt

Erbil 11, 33, 132 kv substations – Iraq

Metu – Gambela 230 kV  power transmission project – Ethiopia

33/11 KV Substation Indoor & Outdoor – Ghana

Design, Supply and Installation of Substations & Lines – Kenya

110kV Double circuit OHL from Shoaiba to Jeddah – KSA

Technical Office Engineer, Planning, Cost Control, Atilla İnş. Tur. ve Tic. A.Ş., Multiple (9) Projects, Ankara, Turkey

START Date: 
April, 2001
END Date: 
January, 2003

Technical Office. Infrastructure work monthly due reports(İller Bank), Biding Dossiers, Price Assessments.

Project details:Works consisting of the construction of the foul water and rainwater systems for various small cities.

●      Monthly due reports for various construction sites (nine sites at peak, minimum 5 sites).

●      Follow-up (seek approval) on location of two site due reports with client.

Technical Office Engineer, Planning & Cost Control, Alsim Alarko, Arzew Desalination and Power Plant Project, Oran, Algeria

START Date: 
January, 2004
END Date: 
June, 2004

Technical Office. Planning, payment certificates of client and subcontractors, cost control (6 months).

Project details:Scope contract value US$7,000,000. Civil works & erection of steel structures.

●      Primavera scheduler,

●      Due reports for client, Weekly, monthly reports to management,

Technical Office Engineer, Planning & Cost Control, Alsim Alarko, Baku-Tiblisi-Ceyhan Crude Oil Pipeline, Erzincan, Turkey

START Date: 
June, 2004
END Date: 
December, 2004

Technical Office. Planning, payment certificates of client and subcontractors, cost control (6 months).

Project details:Project value US$4Billion, scope contract value US$30,000,000. Scope pipeline total length is 387(470)km and is of 42’’ steel pipes.

●      Company master Primavera scheduler.

●      Progress reporting.

Technical Office Engineer, Planner, GAMA, SAKHALIN II Project, Sakhalin Island, RUSSIA

START Date: 
January, 2005
END Date: 
March, 2006

SAKHALIN II Project, Sakhalin Island/RUSSIA

Technical Office. Planning, payment cert. of client, Proof reading of the correspondence, (1 year and 2 months).

Project details:Project value US$20billion, scope contract value US$130,000,000. Scope consists of the civil and mechanical construction and erection of the piperack and installation of equipment.

●      Company master Primavera scheduler, Weekly, Monthly reporting of site reports to top management.

Planner, Technical Office Engineer, GAMA, QatarGas 3&4 LNG Onshore Project, Ras Laffan, Qatar

START Date: 
April, 2006
END Date: 
April, 2007

Technical Office. Planning (P3), Method Statements & Execution Plans, Proof reading of Client letters & IT, (13 months).

Project details:Ditto above.

●      Company Primavera scheduler, Weekly/monthly reporting of site reports schedule related.

Technical Office Engineer, Strabag AG, Muratli and Borcka Dam construction Project

START Date: 
September, 2005
END Date: 
March, 2007

Technical Office Engineer,                                                                                              &nbs

Technical Office Engineer, CARGILL – NVOC – ESACO SAE, CARGILL – NVOC – SOY CRUSHING PLANT

START Date: 
March, 2004
END Date: 
September, 2007

·         Manpower daily, weekly, and monthly reports.

·         Material take-off for steel structure and piping.

·         Tacking of material receiving and consumption.

·         Tracking of project progress and invoicing.

·         Tracking of scope changes and extra-work reporting.

·         Assist in planning.

Technical Office Engineer, CSI - Technip-KTI - EMG, EL-ARISH COMPRESSION STATION

START Date: 
March, 2007
END Date: 
April, 2007

·         Quantity survey for piping discipline.

·         Prepare material availability reports for systems to be released for fabrication.

·         Develop fabrication and erection schedule.

·         Develop progress control sheet to follow up project progress.

·         Perform document control for project drawings and documents.

Technical Office Engineer , CSI, Main Workshop

START Date: 
May, 2007
END Date: 
November, 2007

·         Quantity survey for steel structure and sheet metal equipment.

·         Shop drawing for steel structure and sheet metal equipment.

·         Follow up material status.

·         Follow up fabrication progress.

·         Prepare invoice.

·         Prepare fabrication and erection schedules.