Technical Office Engineer

Technical Office Engineer, TITAN / LAFARGE – ESACO SAE , Bani-Suif Cement Line II

START Date: 
June, 2008
END Date: 
August, 2008

·         Prepare daily & weekly report for manpower & equipment.

·         Follow up drawings receiving progress from consultant to assure its completeness against project scope.

·         Follow up local fabricated equipment receiving in coordination with material control officers.

·         Prepare progress control sheet and the supporting documents for assembly and erection of equipment.

Technical Office Engineer, Misr Engineering Development Company Medcom, Multi Projects

START Date: 
November, 1996
END Date: 
July, 1999
  1. Cost Control Engineer.

Technical Office Engineer, ORASCOM CONSTRUCTION INDUSTRIES (OCI), Easter Company Projects

START Date: 
May, 2004
END Date: 
February, 2006

Technical Office Engineer

Orascom Construction Industries, May 2004 – Feb 2006
Working as a Technical Office Engineer at Orascom Construction Industries projects at Eastern Company industrial complex.

Projects Budgets:

1- 4 Stores & Administration building:           280,000,000 L.E.

2- Construction of Tobacco Factory building: 220,000,000 L.E.

Work included the following items:

Technical Office Engineer, Sabbour Associates, Operation and Crisis Management building

START Date: 
November, 2006
END Date: 
June, 2008

 

From : November, 2006 to : June, 2008Organization : SABBOUR ASSOSIATESSite : Operation and Crisis Management buildingPosition : (Supervisor and Technical office Engineer)

Senior Planner, Technical Office Engineer, Site Engineer at site, Egyptian Arab Contracting, Sanhour, ...

START Date: 
February, 1995
END Date: 
November, 1999

- Egyptian Arab ContractingFrom 1 Feb 1995 till 14 Nov 1999

a) From Apr 1998 till 14 Nov 1999 In SANHOUR Irrigation Project, This Project consists of under ground irrigation PVC pipes, Open Block Channels, Small Bridge, Regulator, and Meska Pump Station.

Senior Planner engineer, Technical Office Engineer, Egypt, SIAC, AMRAN Cement Plant Project, EZZ flat Steel Project, Smart Village & Beverly Healz Projects in Egypt

START Date: 
November, 1999
END Date: 
July, 2004

SIAC ( Egyptian Company )From 15 Nov 1999 till 15 July 2004

a) From 1 Nov 2002 till 8 July 2003 in Smart Village & Beverly Healz Projects in Egypt

Smart Village was one building consists of basement + ground + 5 typical floors, area of one floor about 4,000 m2 the project value about 20,000,000 Egyptian Pounds.

Beverly Healz is under ground sewerage lines with project value about 15,000,000 Egyptian Pounds.

My Duties:

·  Build the time schedule (Base Line Program) and Recovery if required

·  Reso

Technical Office Engineer, ATE-KSA, Mina Buildings

START Date: 
May, 2006
END Date: 
May, 2008

Position : Technical Office Engineer ( Civil )
Company : Alawi Tunsi Establishment Buildings
Project : Pilot Project for Piligrims Residental in Mina
( Holy Makkah , Saudi Arabia )
Duties and Responsibilities
- Preparing Shop Drawings and Bar's Bending Schedules
- Quantity surveying for construction items
- Take of measurement of quantities, monitor material
requirements and work done necessary for payments
- Monitoring of activities and reporting