Technical Office Engineer , CSI, Main Workshop
START Date:
May, 2007
END Date:
November, 2007 · Quantity survey for steel structure and sheet metal equipment.
· Shop drawing for steel structure and sheet metal equipment.
· Follow up material status.
· Follow up fabrication progress.
· Prepare invoice.
· Prepare fabrication and erection schedules.
· Issue required QC documents.
· Prepare mobilization lists.
· Prepare cost summary.
Perform document control.
- Company:
- Industry:
- Job Role:
- Project:
- Region: