Senior Planner & Scheduler, Sunoco, Sunoco Refinery

START Date: 
August, 2003
END Date: 
July, 2012
Orchestrated high-volume maintenance activities for leading oil company processing 200K crude oil barrels daily. Led cross-functional team of six field planners, two foremen, 30+ mechanics. Scheduled corrective and preventive maintenance, installation, repair, and quality control across multiple internal systems and equipment. Point of contact for in-house union contract workers.
Experience Hours (Planning & Scheduling): 
16000
Experience Hours (Cost Management): 
8000
Experience Hours (Forensic Analysis): 
4000

/ Construction Project Planner / Senior Planner, BP (British Petrolium), BP Whiting Refinery Expansion

START Date: 
July, 2012
END Date: 
July, 2015
Directed all facets of capital project planning within refinery Hydropower division. Tracked and monitored ongoing project work plans to drive timely milestone achievement; verified regulatory permits, LOTO and procurement needs prior to scheduling phase. Allocated company assets across multiple concurrent projects to ensure optimal utilization of qualified personnel, resources, and equipment.
Experience Hours (Planning & Scheduling): 
6000
Experience Hours (Cost Management): 
6000
Experience Hours (Forensic Analysis): 
3000

#planning #seniorplanner #planningengineer #construction #build #majorprojects, BP Americas, BP Whiting Expansion

START Date: 
July, 2012
END Date: 
June, 2015
Directed all facets of capital project planning within refinery Hydropower division. Tracked and monitored ongoing project work plans to drive timely milestone achievement; verified regulatory permits, LOTO and procurement needs prior to scheduling phase. Allocated company assets across multiple concurrent projects to ensure optimal utilization of qualified personnel, resources, and equipment.
Experience Hours (Planning & Scheduling): 
6000
Experience Hours (Cost Management): 
6000
Experience Hours (Forensic Analysis): 
6000

/ Construction Project Planner / Senior Planner, Hexagon, MEGPL

START Date: 
June, 2015
END Date: 
June, 2020
Project Services & Controls Specialist Oversee project planning team tasked with scoping capital and turnaround projects from concept to delivery; strategize and implement end-to-end Work Breakdown Structure, including all work packs. Conduct feasibility assessments for onshore and offshore engineering designs. Advise and approve construction project materials including mechanical and electrical instrumentation and equipment.
Experience Hours (Planning & Scheduling): 
7500
Experience Hours (Cost Management): 
7500
Experience Hours (Forensic Analysis): 
7500

Jia Yu

First Name: 
Jia
Last Name: 
Yu

I HAVE BEEN WORKING IN NUCLEAR CONSTRUCTION INDUSTRY SINCE MY GRADUATION ON 2007. MY MAJOR IN THE UNIVERSITY WAS NUCLEAR ENGINEERING AND TECHNOLOGY.

Professional Since: 
Jul-2007 (18.0 yrs experience)
Years Experience: 
50

Construction and Project Control, SNPEC, SNERDI, Sanmen AP1000 Nuclear Project

START Date: 
January, 2008
END Date: 
September, 2020

My professional job started from January of 2008 in Sanmen Nuclear Power project and it lasts till now. As soon as my joining in SPMO (Site Project Management Office) team, my first job was to inspector construction area, I was assigned to be a Containment building inspector. My major responsibility was to inspect the construction site and report the site progress and concerns to my managers. After that, I was assigned to Containment Vessel team to be a supervisor on supervising CV bottom head assembling which was mainly about welding construction.

Experience Hours (Planning & Scheduling): 
6000
Experience Hours (Cost Management): 
0
Experience Hours (Forensic Analysis): 
0

#planningengineer #scheduling #monitoring #MIS, Adani Infra (I) Limited, 5x660 MW Tiroda Thermal Power Project

START Date: 
February, 2010
END Date: 
May, 2012

Employer: Adani Infra (I) Limited

Projects Handled:

5 x 660 MW Thermal Power Plant for Adani Power Maharashtra Ltd.

2 x 660 MW Thermal Power Plant for Adani Power Rajasthan Ltd.

  • Key Result Areas:

#  Responsible for the preparation of the project schedule (L1-L3) and updating the same at a periodic interval.

Experience Hours (Planning & Scheduling): 
4000
Experience Hours (Cost Management): 
700

#planningengineer #scheduling #monitoring #MIS, Adani Infra (I) Limited, 5x660 MW Tiroda Thermal Power Project

START Date: 
February, 2010
END Date: 
May, 2012

Employer: Adani Infra (I) Limited

Projects Handled:

5 x 660 MW Thermal Power Plant for Adani Power Maharashtra Ltd.

2 x 660 MW Thermal Power Plant for Adani Power Rajasthan Ltd.

  • Key Result Areas:

#  Responsible for the preparation of the project schedule (L1-L3) and updating the same at a periodic interval.

Experience Hours (Planning & Scheduling): 
4000
Experience Hours (Cost Management): 
700

Ryan Evans

First Name: 
Ryan
Last Name: 
Evans

Project Controls

Professional Since: 
Jan-2006 (19.5 yrs experience)
Oldest experience: 
Jan 2006 (19.5 yrs experience)
Years Experience: 
14

Market Place

No results found... (try selecting a different content filter)

Syndicate content