Site Engineer, S.M.Constructions,Goa,India, Hemavathy Mini Hydel Project. Gorur, Hassan (dist) Karnataka.

START Date: 
January, 2001
END Date: 
December, 2001

Mini Hydel Project. Gorur, Hassan (dist) Karnataka.

Canal excavation 1.3 Km, Weir, Canal Regulator, Road works, Hume pipe culvert, penstock and Power house and Other Building constructions.

Samir Chury

First Name: 
Samir
Last Name: 
Chury

SAMIR P. CHURY, PMP Mobile: +91 9820994393~ E-Mail: samir.chury@gmail.com In quest of challenging senior managerial assignments in Project Planning & Management with a growth oriented organisation.Technically accomplished professional with around 16 years ofexperience in the areas of Project Management, Planning & Project Scheduling.

Professional Since: 
Nov-1993 (30.5 yrs experience)
Oldest experience: 
Dec 1993 (30.4 yrs experience, WARNING: 0.1 years variance with Professional Since)
Years Experience: 
18

Graduate Engineer Trainee, Dwarika Projects Limited,Noida,India, Development of Integrated Check Post at Agartala along Indo-Basngladesh border

START Date: 
July, 2012
END Date: 
January, 1948

Currently i'm working for the firm Dwarika Projects limited ,noida ,India .I'm working under the project "The Development of Integrated Check Post at Indo-Bangladesh border at Agartala".My job is to find qunatities of different materils used in the building by studying Autocad Drawings provided by our project consultant.I have the knowledge of Autocad .

Sr. Manager (Project Monitoring & Control), Jindal Group, New Delhi, India, Water Infrastructure Projects, Cross Country Pipe line Projects for Power Plants,

START Date: 
July, 2012

 

 

  • Preparation of Construction Programme for various types of Water Treatment, Waste Water Treatment Projects on BOT basis.
  • Preparation of Weekly/ Monthly work programmes.
  • Preparation of Comprehensive Time Phased Budget thorough Schedule Planning and cost loading against each activity.
  • Determine specific work progress on the project in detail and Capturing actual cost incurred on the project.
  • Perform Variance Analysis on the resultant Earned Value Data to measure performance against the approved Project Baseline.

Trainee Engineer and Procurement Engineer, Lanco Infratech Ltd ,India, C.W.System Package-Ramagundam

START Date: 
June, 2001
END Date: 
February, 2003

i) Updating the L2 Network programme with the help of Project management software’s (MS Project and Primavera project planner)
ii) Follow up the release of drawings and site possession as per the programme.
iii) Planning, assigning and monitoring the resources.

Planning Engineer, Simplex Concrete Piles (I) Ltd ,India, Ash Handling System,C W Pump house, Fore bay,Open Approach Channel of 1 km length

START Date: 
April, 2004
END Date: 
April, 2005
  • i) Preparation of Master Constrution Programme for client as well as for internal purpose to monitor & to achieve the mile stones and for planning of the resources.
  • ii) Liaison / Coordinating with the client/ consultant’s management team along with the project manager to sort out the major constraints and to obtain the approval of the programme
  •  iii) Preparing the trade wise labour histogram as per the planned programme.
  •  iv) To attend weekly co-ordination meetings and fortnightly progress meetings with all sub contractors.
  • v) Monitoring th

Manager-Project Planning, Larsen & Toubro Ltd., Powai, Mumbai, India, DED Engineering for Chemical Process Plant

START Date: 
December, 2007

Project Management

  • Coordinating the project activities and preparing specifications with the clients to ensure drawings are per the specifications of clients.

QA/QC Engineer, India, JME & Contractor, 380 Unit for Ministry of Defence's Housing Project

START Date: 
September, 2005
END Date: 
March, 2006

        Worked as a Quality Control Engineer for Jatinder Mittal Engineers & Contractors for  a  HOUSING Project worth US $ 16 Million, a project of Ministry of Defence looked by Director           General MAP   (Married Accommodation Project ) for Army Staff at Mathura Cant, Under executive agency RITES Ltd and Review consultancy PDIL from Aug’2005 to March06.

Billing/ Estimation Engineer, India, Topline Build Tech, Unitech Cascade cluster of 8 High Rise Tower

START Date: 
April, 2006
END Date: 
May, 2007

  PREVIOUS JOB (country – INDIA) :

 

●      Worked as Billing & Estimation Engineer  for TOPLINE BUILD-          

               TECH (P) LTD. for   UNITECH CASCADE, a multistoreyed GROUP HOUSING   

Technical Assitant, N.R.Loganathan & Co, Vellore, India, Residential projects in Chennai &Vellore, India.

START Date: 
May, 1994
END Date: 
July, 1995

Technical Assistant,

NR Loganathan& Co,

Market Place