Asta Powerproject

PowerProject link to Excel

Hi,

 

Is it possible to link PowerProject (v10/v11) to Excel, whether this is via VBA or an external 'middle' programme, if so is there some api's we can use?

Thanks

VBA

Hello planners,

 

I am using VBA in PowerProject (v 10.0.04) to import tasks and allocations from a csv-file. I am using SetUserStart and SetUserEnd (from the PermanentDemandAllocation class) to set the start- and enddate of the allocation, but I would also like to set the allocation percentage. But I can't find that specific member.

 

Does anyone know if it is possible to change the allocation percentage using VBA?

 

Thanks in advance!

 

 

Kind regards,

 

Marinus

Project Structuring - WBS, Summary Bars, Expanded Tasks

Asta Power Project Users,

As the topic title, I was interested in what method of project structuring you use. I have always used summary bars to breakdown the project.

Summary bars have always served me well for this purpose, using activity codes as well allow filtering etc. but I was reading through the APP help files on a quiet afternoon and studying the WBS in Power Project.

I am struggling to see the benefit of the WBS as opposed to summary tasks / activity codes and was interested in you opinions.

how to add more items in code libraries

HI,

 

I'm using Asta easyplan. I'm creating a tender programme. I'm trying to put all of the different stages into different colours so I used the code libraries option and dragged the headings to the tasks and then renamed the headings.. I assumed I could just add more items into the code library by right clicking however I can't see how to add more so I'm stuck with the 6no in designers that I started with.

Can anyone tell me how to group my tender programme in colours effectively without running out.

 

Cheers

How to show planned / as buit / and

Similar to the last post but i need a step by step guide in the following scenario.

 

I have inherited a project with an Asta easy plan programme ( I don't usually use Asta) The project is delayed and I want to show the Planned as a baseline that does not move,, then the actual as built,, then I want to highlight relevent evenet that have caused delay..

 

Any help please :) thanks

Overlap / Multi-task acitivity

Hi everyone,

Can anyone please explain how to overlap activities to create a multi task effect using asta powerproject v11?

Thanks for any help.

Does anyone (successfully) record as-built data against a baseline in Asta ??

Had a on-going problem for years now with recording as-built data in Asta against a baseline programme.

Editing User Rights in Asta PowerProject Enterprise

Hi All,

I am looking for some help, i have been using Asta for around 18 Months and have recently been given the task of improving the way we use Power Project, it is on Enterprise.

I have reduced the amount of user views we had in the sytem (Approx. 140) we only needed 10 of these.

I now want to remove the rights for users to add and edit the existing views, i have tried all options i can think of in the Admin section of the Code Library.

Does anyone know how this can be done?

Many Thanks

BB

Asta PowerProject - Remove horizontal thick black line

Hi all! Just recevied a sub-con. Asta programme and on the programme they have shown thick horizontal black line to each section. Can't remember how to switch the line off. Any Asta expert here can help? Please see attached print screen of the programme.

550
programme_line.jpg

Create a Baseline View

I have a programme that I have baselined and progress reschedule on a weekly basis in Powerproject.

My client has requested to see a jagged line down the original baseline.

How do you display a progressed baseline only?