Schedule Risk and Schedule Risk Analysis

Primavera Risk Analysis versus RiskyProject

Hello there does anyone know anything about RiskyProject? We currently use Primavera Risk Anaylsis version 8.7 but since the upgrade the Capex Module cannot be used. Does RiskyProject have a Capex Module?

Pertmaster Schedule Warning - Undeflow

Long time since I posted anything on here, but stuck at the moment

Have been carrying out schedule risk analysis on a schedule with multilpe calendars, 5 day, 6 day and weekends only.  Pertmaster runs and shows up an error message stating check Schedule Warnings against activities. 

The error message states

"Warning-some activities have tired to be schedule before or after the calendar range.  These tasks have been forced within the calendar range.

Adding risks to summary tasks

The pros and definitely the cons are clear as to use data on summary tasks in schedules. No relationships, resources and so on. But is there anybody out there that could advise me as to use risks on summary tasks, while using Oracle Primavera Risk Analysis (Pertmaster), or not to. There our different opinions within my company with regard to the assignment of risks to summary tasks. All input is greatly appreciated.

 

For instance; I have Phase A regarding activities 1-5. I have a 10% existence risk with a duration of 10 days. Do I link the risk to my summary?

Please help ASAP:P6 XER Imported in to Pertmaster 8 resulted into different dates

Dear Members,

I have created an XER from my Primavera 6.2 schedule. and imported that into Pertmaster. ersult is I have different completion dates on my project as different dates every where in general. I checked the help on Pertmaster and the only thing I could find was that I have to calculate the schedule prior to XER generation (which I had done) and then generate xer. so this didnt solve my problem.

and also I have checked every start and finsih date in primavera and nothing matches whats in pertmaster.

Please help ASAP:P6 XER Imported in to Pertmaster 8 resulted into different dates

Dear Members,

I have created an XER from my Primavera 6.2 schedule. and imported that into Pertmaster. ersult is I have different completion dates on my project as different dates every where in general. I checked the help on Pertmaster and the only thing I could find was that I have to calculate the schedule prior to XER generation (which I had done) and then generate xer. so this didnt solve my problem.

and also I have checked every start and finsih date in primavera and nothing matches whats in pertmaster.

NEC3 - Compensation Events and Earlier Completion Date

Hello PP members,

I need a little bit of help with understanding how to deal with Compensation Events under the NEC3 ECC (Option B) were the PM is assessing CE's now, knowing that there will be a design change as a result of some post-award value engineering which could reduce the time required for completion.

In this scenario there are legitimate CE's with extensions of time which if implemented with change the Completion Date to approxiametly 2 months later.

However as a result of value engineering by the PM, a substantial time saving can be made by implementing a

RECOVERY PLAN

Gents,

Anybody who can explain to me a RECOVERY PLAN?

SPP

Dangers / Hazards Associated with the Construction of oil tanks / oil terminals

Hi all,

My name is Andronikos and i am currenlty preparing a study about the dangers / risks ascociated with the construction, testing and commisioning of oil tanks / oil - fuel terminals. Dangers related to constructions methods, materials used, substances, etc. 

Therefore i would appreciate if you have any info that will help!

 

Thanks in advance

 

Andronikos

Risk Register Mitigation Plan

Hi all:

 

I am working three weeks ago on risk analysis by using ORACLE Primavera Risk Analysis , and i have finished three tutorials till I reach to Risk Register ,in that one I got some questions and I seek pp help ;

What the benefits behind of entering Qualitative / Quantitative Pre-Mitigation, Mitigation and Post- Mitigation of risks? And what is the chain between them?

I mean , when I am putting the data for each expected outcome in risk register which kind of X is reflecting , Pre- mitigation is ...?, Mitigation is ....?