Planning Engineer, Control and Application Emirates, ABUDHABI, EBSM ( Ethelyne Benzene styrene Monomore) , Heavy Aromatics,Installation of New tank vapour Compressor,Sewage water treatment plant,Installation of security systems and FO cable installation

START Date: 
August, 2008

Job Description: 

  • Understanding the Scope of work with Contract Documents
  • Establish and update schedules according to the procedures, project and contractual requirements
  • Preparation Breakdown Structure/ Contribute to develop project planning and control procedures
  • Monitor and tracking the activities as per the scope of work and nature of projects.
  • Selecting the appropriate techniques and sequence of events for a particular project
  • Preparation of Daily Manpower Report, Weekly Progress Reports and

Planning Engineer, Control and Application Emirates, ABUDHABI, EBSM ( Ethelyne Benzene styrene Monomore) , Heavy Aromatics,Installation of New tank vapour Compressor,Sewage water treatment plant,Installation of security systems and FO cable installation

START Date: 
August, 2008

Job Description: 

  • Understanding the Scope of work with Contract Documents
  • Establish and update schedules according to the procedures, project and contractual requirements
  • Preparation Breakdown Structure/ Contribute to develop project planning and control procedures
  • Monitor and tracking the activities as per the scope of work and nature of projects.
  • Selecting the appropriate techniques and sequence of events for a particular project
  • Preparation of Daily Manpower Report, Weekly Progress Reports and

Advisor, maplin (R), & Oil & Gas Projects

START Date: 
December, 2011

I am working as a sale advisor in electronics company. 

Project Controls Manager (PCM), Mustang Engineering, Flint hills, Tesoro, Styrolutions, Exxon, Shell, Valero, Western Refining, RIL

START Date: 
March, 2008

Currently i am working as Project Control Manager and manage no more than 5 employees. I am Senior Level Scheduler and Cost Control person. My specialty is handling unhappy or difficult Clients.

I am proficient in all versions of Primavera, MS Project, PDMC, Pacesetter, Office and any common software.

Assistant Engineer - Planning & Project Control, SNC Lavalin, Lyondel Basel

START Date: 
January, 2012
END Date: 
July, 2012
  • Jan 2012  to Jul 2012

 

  • Organization :M/s SNC-Lavalin Engineering India Ltd,Mumbai

         

Worked as Project Control Engineer in

 

  • Detailed Engineering of a LOP 3rd Gas dryer expansion project for M/s Lyondell Basel‘s La Porte site US.

 

  • Detailed Engineering of Sulphuric Acid Plant II phase for M/s Mopani Copper Mines’s  Zambia

Assistant Engineer - Planning & Project Control, SNC Lavalin, Lyondel Basel

START Date: 
January, 2012
END Date: 
July, 2012
  • Jan 2012  to Jul 2012

 

  • Organization :M/s SNC-Lavalin Engineering India Ltd,Mumbai

         

Worked as Project Control Engineer in

 

  • Detailed Engineering of a LOP 3rd Gas dryer expansion project for M/s Lyondell Basel‘s La Porte site US.

 

  • Detailed Engineering of Sulphuric Acid Plant II phase for M/s Mopani Copper Mines’s  Zambia

Senior Engineer, NESPAK www.nespak.com.pk, Buildings and Infrastructure

START Date: 
November, 2005

Nov 2005 – Feb 2012     Assistant Project Manager/Planner – Construction Management Division, NATIONAL ENGINEERING SERVICES PAKISTAN PVT. LIMITED (NESPAK),  www.nespak.com.pk

(Ranked amongst the world’s top 200 consulting firms.)

Senior Design and Site Engineer:, State Water Works (DSI) - www.dsi.gov.tr/ , Potable water distribution and supply, irrigation systems, floodwater mitigation, small dams

START Date: 
March, 1976
END Date: 
June, 1970

1970- 1976  State Hydraulic Works (DSI)                                                        Ankara/TURKEY

Senior Design and Site Engineer:

Senior Design and Site Engineer:, State Water Works (DSI) - www.dsi.gov.tr/ , Potable water distribution and supply, irrigation systems, floodwater mitigation, small dams

START Date: 
March, 1976
END Date: 
June, 1970

1970- 1976  State Hydraulic Works (DSI)                                                        Ankara/TURKEY

Senior Design and Site Engineer:

Senior Design and Site Engineer:, State Water Works (DSI) - www.dsi.gov.tr/ , Potable water distribution and supply, irrigation systems, floodwater mitigation, small dams

START Date: 
March, 1976
END Date: 
June, 1970

1970- 1976  State Hydraulic Works (DSI)                                                        Ankara/TURKEY

Senior Design and Site Engineer: