Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

project controls

Construction Project Manager, P.J. Carey (Contractors) Ltd, Crossrail Project

START Date: 
July, 2012

I am a graduate civil engineer and progressed throught the ranks of contracting have project managed various projects from heavy civil engineering, rail, RC frames and groundworks and Design and build contracts.

Project Director, Siemens, F1 Race Track India

START Date: 
December, 2011
END Date: 
August, 2010

Project Director at the India F1 race track: Responsible for Engineering, Delivery and Installation of the Special Electronics and the MV Package.

1.“planning engineer” or “project planner” or “project controller” or “project controls” or “delay analysis”, COSCO, Adventure&Discovery

START Date: 
July, 2010

Project planner of ocean platform, two project delivered called Adventure and Discovery which are all Wind Installation Vessel, one project to be delivered next month which is a rig to work at deep sea, one project just started which is a platform for accommodation.

“planning engineer” , macdow, Major Civil Projects

START Date: 
July, 2001

Planning Using Primavera P6 and TILOS.

Prepara Monthly reports, S-Curve , CIP Programe

project planner, VACLUE ENGINEERING, Procurement

START Date: 
November, 2008

 

2009-date

Project Planner, VACLUE ENGINEERING, ABERDEEN UK

Projects Coordinator, ASDarchitects, Prince Mashal bin Sultan Dewanya

START Date: 
February, 2012

 

Working as a Projects Coordinator for Al-Dugaither Architects Engineers in Riyadh - Saudi Arabia, work included improving and monitors the implementation of the CAD and file naming systems, projects time schedules, coordination between all disciplines (Architectural, Structural, Mechanical and Electrical), assign the project team inside and outside the office, study & prepare technical and financial proposals for the new projects.

Junior Planner, Naim Cendera Sdn Bhd, New General Operation Force Camp for Royal Malaysian Police

START Date: 
October, 2005
END Date: 
October, 2007

 

IV. General Operation Force Camp, Royal Malaysian Police                

(October 2005 – October 2007)

Duration: 2 years

 

Client

Royal Malaysian Police

Position Held

Planning Engineer

Scope

To Construct New General Operation Force Camp for Royal Malaysian Police

Action / Responsibilities

Senior Planner, Puncak Niaga Sdn Bhd, Water Treatment Plant and Water Supply

START Date: 
January, 2011
END Date: 
April, 2012

 

Client

Ministry of Rural and Regional Development

Position Held

Planning Engineer

Scope

To provide water supply to Rural Area in Sarawak

Action / Responsibilities

- Responsible to prepare overall planning.

- Responsible to prepare Master Work Program.

- Actual progress tracking.

- Coordination with Project Manager and Planning team to come out with recovery plan for any delay of the works.

Construction Project Planner / Senior Planner, Trans Resources Corporation, Brunei International Airport Terminal

START Date: 
April, 2012

 

1.       Understand work scope, quantity and familiar with logical sequences in terms of engineering, manufacturing and construction disciplines.

2.       Conduct field scoping to clarify scope as required.

3.       Understand WBS structure , and work with management and project/maintenance team  in the development of work break down structure for progress measurement, scheduling ,cost estimating and project control.

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content