Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

Project Planner

Project Planner, Atkins Rail, Crossrail, Evergreen, NLRIP, Olympics 2012, Stratford Station Upgrade, Tunbridge Weels

START Date: 
June, 2008
END Date: 
May, 2010

Project Planner on various schemes, tenders and commissionings including:

- North LondonLine Railway Infrastructure Projects (NLRIP)

- Olympics 2012 London Project

- Evergreen GRIP 5 Tender – Chiltern Railways

Project Planner, KONE, Major Projects

START Date: 
May, 2009

Project Planner for the Elevators and Escalators Installation in the Major Projects department at Kone Plc.

Project Planner, Laing O Rourke UK, Manchester Metrolink Tram Extention

START Date: 
April, 2008
END Date: 
March, 2011

Project Planner carrying out weekly detailed programme updates EOT claims and Contract programme administration, As Deputy to the Project controls leader I have setup and rolled out a number of controls procedures and monitoring systems across a £770m project.

Including P6 systems administrator, EVA setup and reporting output capture and reporting, Risk analysis using pert master and claims.

Project Planner, Amey Rail, Level Crossing Conversions

START Date: 
June, 2004
END Date: 
December, 2004

-          Project Planning and Progress Monitoring.

-          Principle Project and Installation Planner.

-          Level Crossing upgrades.

-          Development and maintenance of a stand-alone P3 programme primarily used for progress monitoring, critical path and, cost analysis.

Project Planner, Sharjah Oil Refining Co. Ltd. (FAL Group) SHARJAH - U.A.E., Fuel Oil / Gas Oil Storage Facility. Fixed & Floating Roof Tanks with Pump House, Truck Loading Bays & Jetty

START Date: 
October, 2001
END Date: 
July, 2005

Worked with Project Control team for developing a Refinery Complex in Sharjah HAMRIYA . Planning work required for process refinery Tank form. Planning engineering design, projects and construction planning, scheduling and reporting. Build overall plans and schedules for conceptual, front-end designs, schedule estimates for the execution phase of projects, plans and schedules for construction service till the commissioning Stage integrated plans for various Phases & multiple units of refinery and Oil Movement & Storage and Jetty.

Project Planner, Grant Rail, Rail

START Date: 
January, 2011

 

Primavera project Planning (P3e) Planning & Scheduling with P3e course 601.

Railways and other Transport Systems (Works, Plant & Equipment) Regulations 1994

Passport to Safety

Track Awareness

Fire & Awareness

Entry Permit

Protection Master Engineering Hours 

Project Planner, AMEC, London Underground Power Upgrades

START Date: 
June, 2008
END Date: 
September, 2008

Producing Conceptual Design Statement’s on upgrading the power to Metropolitan, Circle & District lines. Working out of Royal Mint Court, London. My role as Project Planner required me to co-ordinate team efforts when the manager was unavailable. My primary responsibilities were to monitor and update the schedule, make alterations where required, input expended man hours and compile Earned Value reports. I also attended daily review meetings with the project manager and CDS champions to ensure current progress reporting was accurate.

Project Planner, Balfour Beatty Management, Ensus Bio-Ethanol Plant

START Date: 
January, 2009
END Date: 
October, 2009

- Initial Construction programme for the E & I installation to be created within a strict deadline for client

- Development of Electrical and Instruments database for all site activity enabling weekly reports to be more efficient.

- Day to day schedules for supervisors.

- Standard planning practice: Critical Path Development, S Curve analysis, Histograms, Baseline Comparison, progression reporting, end date improvement.

Project Planner, Costain, M25 Holmesdale Tunnel

START Date: 
January, 2006
END Date: 
September, 2007

I was working as part of the construction site team in M25 Holmesdale Project, Enfield. The project is to refurbish tunnel structure on M25 junction 25, Holmesdale Tunnel. The scheme includes ground works, piling, demolition, construction of reinforced concrete walls and deck, and mechanical and electrical installation.

Market Place

No results found... (try selecting a different content filter)

Syndicate content