Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

PLANNING ENGINEER

Planning Engineer, Hilti Qatar W.L.L., Doha, Qatar, Measieed Power Plant

START Date: 
March, 2009

Development of Project Execution Plan (Activities, WBS, Resource allocation) using Primavera Project Planner ver.3. Development of various levels of Project execution and fine tuning plans for approvals from client. Project progress tracking and report generation. Development of S-curves and other resource curves. Development of recovery plans in-case of backlogs in progress

Planning Engineer, Wade Adams Contracting LLC, Dubai, UAE, Roads & Infrastructure

START Date: 
April, 2007
END Date: 
January, 2009
  • Handling of multiple projects in Dubai
  • Planning and overseeing the entire programme of work and anticipate resource requirements in terms of labor, equipment, materials and other technical requirements

Planning Engineer, Qatari Diar Vinci Construction, Qatar, LRT Project

START Date: 
April, 2010

As a Planning Engineer, Instrumental in preparing an efficient program of works for project as per contract and specifications

PLANNING ENGINEER, Multi Max Engineering Works Pvt Ltd., Tube Bundle & Heat Exchanger for IOCL, Mathura Refinery.(U.P)

START Date: 
February, 2008
END Date: 
August, 2009

*  worked in Multi-Max Engineering Works Pvt. Ltd, Meerut (U.P) as a Planning Engineer which manufactures Heat Exchangers & Pressure Vessels.

 Tenure          :-   From Feb 2008 to Aug 2009.

PLANNING ENGINEER, KPO b.v., Plant shutdown maintenance

START Date: 
May, 2009

Planning Engineer  

- Implementation and preparation of Units shutdown planning, planned preventive and corrective maintenance, opportunity based planning, campaign maintenance and development planning.

- Development of reports, monitoring progress against plan.

- Tracking the list of material delivery for shutdown activities in support of the planning activity (Bookies board).

- Prepare the 4 weeks look ahead integrated plan,3 days look ahead during shutdown

- Major

PLANNING ENGINEER, Shell Expro (Aberdeen), Shell - Brent Alpha

START Date: 
September, 1987
END Date: 
December, 1995

Asset Planning, Maintenance Planning & Shutdown Planning for Brent Apha production facility in the North Sea. Experience included offshore planning 

PLANNING ENGINEER, QGC, AMEC, PLUS THREE CONSULTANTS, TURNER & TOWNSEND, SANTOS, GLNG, QCLNG,

START Date: 
April, 1998

Project Planning for Client and Contractor from FEED thru EPC construction including EOT (forensic claim planning).

Started with Infrastructure and Building industry for a collective 5 years and 10 years in Oil & Gas /Petro-Chem industry.

PLANNING ENGINEER, ETA M&E,Bangalore, Wipro Ltd

START Date: 
June, 2007
END Date: 
December, 2009
  1. ProjectExecution Planning Level 3 & Level 4, Material, Procurement & Shop Drawing Production Planning
  2. Creating Baseline Contract Programme
  3. Critical path method (CPM) analysis, variance analyses, floats analysis and schedule trending.
  4. Project Updating, Scheduling, and Leveling
  5. Managing Baselines.
  6. Proactive influence to Project Management with regard to general Policies, Plans and Strategies in order to optimize Project execution
  7. Preparing Organization Charts & Labor Histograms
  8. Customizing Reports MIS &am

Planning Engineer, CS Total, Semi-Submersible Drilling Rigs, Accomodation Barge, PLV Vessel

START Date: 
August, 2007
END Date: 
May, 2008
  1. WIL PIONEER SEMI-SUBMERSIBLE DRILLING RIG FOR AWILCO ASA, NORWAY
  2. WIL INNOVATOR SEMI-SUBMERSIBLE DRILLING RIG FOR AWILCO ASA, NORWAY
  3. D 90 SEMI-SUBMERSIBLE DRILLING RIG FOR SS FRIGSTAD OSLO, NORWAY
  4. SCHAHIN MILLENNIUM SEMI-SUBMERSIBLE DRILLING RIG FOR SCHAHIN PETROLEO, BRAZIL
  5. JEBSENS SELF-UNLOADING BULK CARRIER FOR JEBSENS, NORWAY
  6. ACCOMMODATION BARGE-1 FOR AFRICAN CARIBE

PLANNING ENGINEER, GMR GROUP, 2X300 MW Tthermal power plant

START Date: 
June, 2007

A Planning Engineer for 2X300 MW TPP since 01 Nov'10.

  •  mechanical Engineer by Degree.
  • GHIAL airport from 25/06/07 to 01/11/2009.

Market Place

No results found... (try selecting a different content filter)

Syndicate content