Planning Engineer, Design Engineer, NCC LTD, 1X470 MW Combined Cycle Power Plant,2X660 MW Super Critical Thermal Power Project

START Date: 
May, 2010

PROFICIENCY FORTE Design Engineering  Review and Approval of Contractor’s Drawings/ Documents.  Pipe size selection, Pump sizing.  Evaluation of Technical offers.  Coordination with Purchase Department & Assist in order placement.  Coordination of Project Activities with Client and Vendors.  Detail Calculation of Ash handling system.

Asset Planning Engineer, Fluor, 176-C07 - Construction of New Air Defense project under Royal Commission of JUbail & Yanbu

START Date: 
April, 1998

Planning Engineer since 1998 'til present.

Experienced in Civil Works, Structural, MEP, Electrical & Instrumentation Disciplines.

Junior Planner, Celebrity structures, Construction of United Residency

START Date: 
April, 2012

·         Analysing and controlling of project cash flow, updating cash flow report

·         To identify the root cause of any delay  event and report to project manager with recommended corrective action

·         Using Earned Value Calculations to monitor project status.

·         Generating monthly weekly and daily reports, preparing look ahead program for week and month

junior planner, Celebrity structures, Construction of VEDADRI Apartment

START Date: 
June, 2008
END Date: 
August, 2009

·         AS PLANNING ENGINEER-
* Planed & Scheduled the Project, as per Construction Drawings
* Prepared the Project Cash Flow

·          AS SITE ENGINEER
* Implemented the Construction Schedule
* Controlled the Site Execution Work

·         Preparing schedule by creating WBS and codes, linking relationships, assigning resources and budget, updating progress.

Assistant Planning Engineer., Synergy Insight Petroleum Technology Limited, UK., Capital & Turnaround Projects

START Date: 
December, 2010
END Date: 
February, 2012
  • Co-ordination and planning of all aspect of Project, from Manpower, Equipment and Materials.
  • Assist to ensure Engineering works are carried out in accordance with specifications and statutory laws;
  • Assist in developing Work Breakdown Structure(WBS), Activities and assign resources respectively;
  • Performed critical path analyses to ensure project is kept on track and maintained to ensure all identified issues are resolved on time and in budget for work scopes of project.
  • Develop detailed schedules graphically  to understand project work easi

Assistant Planning Engineer, Atkins Faithful & Gould, General Oil & Gas Projects Control (Oil & Gas Project Planning,Management and Decommissioning)

START Date: 
March, 2012
  • Using Project Scope for task and resources management, and estimation of cost for each activities using  agreed resources accordingly;
  • Co-ordination and planning of all aspect of Project, from Manpower, Equipment and Materials;
  • Assist in developing Work Breakdown Structure(WBS), Activities and assign resources respectively;
  • Performed critical path analyses to ensure project is kept on track and maintained to ensure all identified issues are resolved on time and in budget for work scopes of project.
  • Graphic presentation of detailed project

Assistant Engineer at site, CCSSPL, RAILWAY TUNNEL

START Date: 
May, 2010

 

   Project Engineer:

                           Client: Konkan Railway Corporation Limited, Jammu and Kashmir

                           Product: 1.Oracle primavera EPPM P 6.7

Intermediate / Senior Planner, Tech Mahindra, Rail Depots and Rolling Stock

START Date: 
June, 2010

Professional Summary:

Experience      : 5 Years of Project Planning as Oracle Primavera Consultant

 

Core Expertise:  

 

Ø  Project Scheduler for Railway, Engineering, Construction, Oil and gas.

Ø  Project Planning

Ø  Resource Loading and Cost Estimation.

Ø    Tracking and Forecasting

Experience Hours (Planning & Scheduling): 
5000

Lead - Project Controls Engineer, E.I.DuPont India (P) Ltd, (various projects)

START Date: 
January, 2009

Ø       Preparation and updation of detailed project schedules (Level II / III) with WBS & Resource Loading structures.

Ø       Generating performance reports (Viz. Network based look ahead, milestones and progress reports) and curves (Viz. ‘S’ Curves).

Ø       Analyse cost trends, Analyse and review cost forecast, prepare monthly cost reports for individual projects as well as projects portfolio.

PLANNING ENGINEER, CNA Groups Ltd., New Doha International Airport (NDIA Project) Special Systems

START Date: 
November, 2010
END Date: 
February, 2013

 

·         Scope – Installation of Airport Special Systems (Building Management System, Telecommunication, CCTV, Fire Alarm, Public Address & Access Control Systems in Emiri Royal Terminal, Support Facilities, Commercial Car Park and Public Mosque.

·         Study scope of works/Contracts, select appropriate techniques and sequence of events for the project, in conjunction with Construction and Project Manager.