Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Primavera Planning & Scheduling

Senior Planner, J Murphy & Sons Limited, National Grid - CNI Project

START Date: 
May, 2011

Senior Planner responsible for an effective team of planners looking after all programme responsibilities in line with the NEC3 contract and works information requirements. Some of the key duties performed are; controlling up to 12 live design contract programmes, early identification any areas for potential delay, raising early warning notices and subsequent impacted programmes. Producing construction programmes for acceptance by the client and monitoring progress against the plan and the activity schedule.

Bid/Project Planning Engineer, TTJ Design & Engineering Pte Ltd, Lanxess, SLNG

START Date: 
March, 2012

Career Summary:

I am an enthusiastic and determined professional with solid background in project planning, scheduling, monitoring and control. Experience for large industrial projects (Process plants), MRT Stations/tunnels, cement plant, garments manufacturing factory, power plant, rubber plant, petrochemicals and oil & energy projects.

 

Current goal is to enhancement of enterprise project management skills with a focus on business decision support systems, projects analytics and risk management for projects.

Project Specialist, S3 Business Systems UK, Alternative Energy, Clean Energy, Supply Chain and Growth, Consultancy

START Date: 
November, 2010

 

Nov. 2010 – Date              Project Specialist, S3 Business Systems(UK)

Project Engineer, Integral Ltd, FEED

START Date: 
January, 2006
END Date: 
January, 2007

 

Jan 2006 – Jan 2007              Project Engineer – Integral Ltd

Project Controls Engineer, Bencov Group, Clean Energy, MANUFACTURING, Oil %26 Gas FEED's

START Date: 
January, 2006

Jan 2007 – Sep 2009          Project Controls Engineer – Bencov Group Ltd

Junior Planner, CMW Management, Consultant

START Date: 
June, 2010

A strong understanding of construction including the interpretation of fabrication drawings and the ability to convert my appraisals into realistic plans, whilst adopting a robust Work Breakdown Structure. A team player and effective communicator.

Daily tasks have included :

 

Generation of bespoke multi discipline Primavera P6 Reports as required, highlighting under performance in schedule and strategy.

Junior Planner, Costain, Berkeley Nuclear Power Station Decommissioning

START Date: 
July, 2011

Position: Planning Engineer with Costain on their nuclear decommissioning framework at Berkeley Power Station. 

 

The framework objective is to help Magnox put the decommissioned nuclear power station at Berkeley into ‘Care & Maintenance’.  To achieve this they are in the process of extracting all remaining ‘intermediate level waste’ and processing it ready for disposal at a geological disposal facility.  The framework contract is based on the NEC model.  My role as the site planner is fourfold:

Senior Project controls specialist, Fluor, Ma'aden Aluminum Project

START Date: 
February, 2012

 

Co-coordinating engineering progress and updating of the over-all schedule between the various offices which formed part of the WPF joint venture.(Brisbane, Al-Khobar and Beijing).

Master Scheduler / Senior Project Scheduler, Faithful & Gould, Major Turnarounds

START Date: 
January, 2000
END Date: 
December, 2010

 

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content