Qatar (AS.QA)

Framework Coordinator = Senior Planning Engineer, ASCO Consulting Engineers/CDM Smith, Abu Hamour (Musaimeer) Surface & Ground water Drainage Tunnel Phase 1,

START Date: 
January, 2015

The project involves design and construction of 9.5 kilometres long and 3.7 meters pre-cast segment lined inside diameter, storm water conveyance tunnel. The project also includes 24 deep access shafts and their adit-tunnel connections for Qatar Public Work Authority (ASHGHAL).

Experience Hours (Planning & Scheduling): 
1500
Experience Hours (Forensic Analysis): 
1000

Framework Coordinator = Senior Planning Engineer, ASCO Consulting Engineers/CDM Smith, Abu Hamour (Musaimeer) Surface & Ground water Drainage Tunnel Phase 1

START Date: 
January, 2015
END Date: 
August, 2016

Continues Employment contract with ASCO Qatar till present.

Project: Abu Hamour Surface & Ground Water Drainage Tunnel Phase 1, was design and construction of 9.5 kilometre long and 3.7 meter pre-cast segment lined inside diameter, storm water conveyance tunnel. The project also included 24 deep access shafts and their adit-tunnel connections for Qatar Public Work Authority (ASHGHAL).

Experience Hours (Planning & Scheduling): 
1500
Experience Hours (Forensic Analysis): 
1000

Lead/Senior Planning Engineer, CDM Smith, Abu Hamour (Musaimeer) Surface & Ground water Drainage Tunnel Phase 1

START Date: 
January, 2015
END Date: 
August, 2016

The project involves design and construction of 9.5 kilometres long and 3.7 meters pre-cast segment lined inside diameter, storm water conveyance tunnel. The project also includes 24 deep access shafts and their adit-tunnel connections for Qatar Public Work Authority (ASHGHAL).

Experience Hours (Planning & Scheduling): 
1500
Experience Hours (Forensic Analysis): 
1000

Framework Coordinator = Senior Planning Engineer, ASCO Consulting Engineers/CDM Smith, Abu Hamour (Musaimeer) Surface & Ground water Drainage Tunnel Phase 1,

START Date: 
January, 2015
The project involves design and construction of 9.5 kilometres long and 3.7 meters pre-cast segment lined inside diameter, storm water conveyance tunnel. The project also includes 24 deep access shafts and their adit-tunnel connections for Qatar Public Work Authority (ASHGHAL).
Experience Hours (Planning & Scheduling): 
1500
Experience Hours (Forensic Analysis): 
1000

PLANNING ENGINEER, NEW HORIZON, DUKHAN ROAD PROJECT

START Date: 
March, 2016

 Performs control of all relevant engineering documentation from conceptual to closeout as well as provision of planning and cost reports.

·         Prepares various technical reports as required during the design process.

planning engineer, NEW HORIZON, DUKHAN ROAD PROJECT

START Date: 
March, 2016

 Performs control of all relevant engineering documentation from conceptual to closeout as well as provision of planning and cost reports.

·         Prepares various technical reports as required during the design process.

PLANNING & COST ENGINEER, NEW HORIZON, Roads & Utilities project

START Date: 
March, 2012
END Date: 
March, 2016

·         Performs control of all relevant engineering documentation from conceptual to closeout as well as provision of planning and cost reports.

·         Prepares various technical reports as required during the design process.

·         Performs project coordination and attends progress coordination meetings.

Experience Hours (Planning & Scheduling): 
7000
Experience Hours (Cost Management): 
2800

Ajimir Ismail

First Name: 
Ajimir
Last Name: 
Ismail

I'm a planning engineer working in an infrastructure sector (Roads & Utilities) for more than 6 years with a key skills of progress measurement, EOT preparation and claim, and delay analysis. 

Professional Since: 
Feb-2010 (15.3 yrs experience)
Oldest experience: 
Oct 2010 (14.6 yrs experience, WARNING: 0.7 years variance with Professional Since)
Years Experience: 
5
Guild Accreditation: 
Awaiting Applicant
GPC Pilot Tester

SENIOR Planning & Scheduling Engineer, QStech, POLYSILICON PROJECT

START Date: 
March, 2014
END Date: 
June, 2014

q   Establishing and maintaining the Project WBS

q   Establishing and maintaining the Integrated Project Master Schedule

q   Integrating the Baseline Schedules from all Project stakeholders

q  Issuing and updating the Integrated Control Schedule

q  Progress Monitoring and Measurement

q  Project Progress Measurement (baseline versus actual versus forecast)

Experience Hours (Planning & Scheduling): 
500
Experience Hours (Cost Management): 
0
Experience Hours (Forensic Analysis): 
0

Kevin Love

First Name: 
Kevin
Last Name: 
Love
Professional Since: 
Aug-1980 (44.8 yrs experience)
Years Experience: 
0

Market Place

No results found... (try selecting a different content filter)

Syndicate content